Goodman GCVC96 Two-Stage Gas Furnace Instruction Manual

June 9, 2024
Goodman

GCVC96 Two-Stage Gas Furnace

Installation Instructions for CVC96 & MVC96 Two-Stage Gas Furnace
(Type FSP CATEGORY IV Direct or Non Direct Vent Air Furnace) (Type FSP CATÉGORIE IV Direct ou four á air soufflé non direct)

These furnaces comply with requirements embodied in the American National Standard/National Standard of Canada ANSI Z21.47·CSA-2.3 Gas Fired Central Furnaces.
Installer: Affix all manuals adjacent to the unit.

WARNING
Only personnel that have been trained to install, adjust, service, maintenance or repair (hereinafter, “service”) the equipment specified in this manual should service the equipment. The manufacturer will not be responsible for any injury or property damage arising from improper service or service procedures. If you service this unit, you assume responsibility for any injury or property damage which may result. In addition, in jurisdictions that require one or more licenses to service the equipment specified in this manual, only licensed personnel should service the equipment. Improper installation, adjustment, servicing, maintenance or repair of the equipment specified in this manual, or attempting to install, adjust, service or repair the equipment specified in this manual without proper training may result in product damage, property damage, personal injury or death.

The precautions listed in this Installation Manual are intended as supplemental to existing practices. However, if there is a direct conflict between existing practices and the content of this manual, the precautions listed herein take precedence.
RECOGNIZE THIS SYMBOL AS A SAFETY PRECAUTION.

WARNING
Do not bypass safety devices.

DO NOT LIFT PRODUCT USING HEAT EXCHANGER

IOG-2015K 07/2022

19001 Kermier Rd., Waller, TX 77484 www.goodmanmfg.com · www.amana-hac.com © 2021-2022 Daikin Comfort Technologies Manufacturing, L.P.
is a registered trademark of Maytag Corporation or its related companies and is used under license. All rights reserved.

This device, which was assembled by Goodman Manufacturing Company, L.P., contains a component that is classified as an intentional radiator. This intentional radiator has been certified by the FCC: FCC ID QOQBGM111. And this international radiator has an Industry Canada ID: IC 5123A-BGM111.
This device complies with Part 15 of the FCC’s Rules. Operation of this device is subject to two conditions:
(1) This device may not cause harmful interference; and (2) This device must accept any interference received, including interference that may cause undesirable operation.
And this device meets the applicable Industry Canada technical specifications.
The manufacturer of the intentional radiator (model no. BGM111) is Silicon Laboratories Finland Oy, which can be contacted by calling 617951-0200. (www.silabs.com)
Goodman Manufacturing Company, L.P. may be contacted by calling 713-861-2500, or at 19001 Kermier Rd., Waller TX 77484. (www.goodmanmfg.com)
NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:
– Reorient or relocate the receiving antenna. – Increase the separation between the equipment and receiver. – Connect the equipment into an outlet on a circuit different
from that to which the receiver is connected. – Consult the dealer or an experienced radio/TV technician for
help.
This equipment complies with FCC radiation exposure limits. To ensure compliance, human proximity to the antenna shall not be less then 20cm during normal operations.
Changes for modifications not expressly approved by the party responsible for compliance could void the user’s authority to operate the equipment.
TABLE OF CONTENTS
Safety Considerations …………………………………………. 2 Location Requirements & Considerations …………… 5 Combustion & Ventilation Air Requirements……….. 8 Installation Positions ………………………………………….. 8 Horizontal Applications & Considerations………….. 9 Vent/Pipe and Combustion Air ……………………………. 11 Special Instructions for Products Installed
in the State of Massachusetts ………………………. 16 Condensate Drain Lines & Drain Trap ………………… 17 Gas Supply and Piping ………………………………………… 22 Propane Gas/High Altitude Installations…………… 22 Duct Work ………………………………………………………….. 26 Electrical Connections……………………………………… 29 Accessories………………………………………………………… 34

Startup Procedure & Adjustment………………………. 36 Normal Sequence of Operation …………………………. 39 Safety Circuit Description ………………………………… 40 Troubleshooting………………………………………………… 40 Maintenance ……………………………………………………….. 41 Filters…………………………………………………………………. 41 Before Leaving an Installation………………………….. 42 Repair and Replacement Parts…………………………… 42 Menu Options………………………………………………………. 43 Status Codes ………………………………………………………. 44 Troubleshooting Chart……………………………………… 45 Wiring Diagram…………………………………………………… 50 Start-Up Checklist……………………………………………… 51
SAFETY CONSIDERATIONS
Adhere to the following warnings and cautions when installing, adjusting, altering, servicing, or operating the furnace. To ensure proper installation and operation, thoroughly read this manual for specifics pertaining to the installation and application of this product.
This furnace is manufactured for use with natural gas. It may be field converted to operate on L.P. gas by using the appropriate L.P. conversion kit listed in the PROPANE GAS/HIGH ALTITUDE INSTALLATIONS section of this manual
Install this furnace only in a location and position as specified in LOCATION REQUIREMENTS & CONSIDERATIONS section and INSTALLATION POSITIONS section of this manual.
Provide adequate combustion and ventilation air to the furnace as specified in COMBUSTION & VENTILATION AIR REQUIREMENTS section of this manual.
Combustion products must be discharged to the outdoors. Connect this furnace to an approved vent system only, as specified in VENT/FLUE PIPE & COMBUSTION AIR PIPE section of this manual.
Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections, as specified in GAS SUPPLY AND PIPING section of this manual.
Always install a furnace to operate within the furnace’s intended temperature- rise range with a duct system which has external static pressure within the allowable range, as specified on the furnace rating plate and OPERATIONAL CHECKS section of these instructions.
A gas-fired furnace for installation in a residential garage must be installed as specified in the LOCATION REQUIREMENTS AND CONSIDERATIONS section of this manual.

2

Advertencia especial para la instalación de calentadores ó manejadoras de aire en áreas cerradas como estacionamientos ó cuartos de servicio.

RISQUE D’EMPOISONNEMENT AU MONOXYDE DE CARBONE

CO can cause serious illness including permanent brain

damage or death.

B10259-216

Las emisiones de monóxido de carbono pueden circular a través del aparato cuando se opera en cualquier modo.

El monóxido de carbono puede causar enfermedades severas

como daño cerebral permanente ó muerte.

B10259-216

Cette ventilation est nécessaire pour éviter le danger d’intoxication au CO pouvant survenir si un appareil produisant du monoxyde de carbone continue de fonctionner au sein de la zone confinée.
Le monoxyde de carbone peut causer des maladies graves telles que des dommages permanents au cerveau et meme la mort. B10259-216

This furnace may be used as a construction site heater only if certain conditions are met. These conditions are listed in the Product Application section.
WARNING
FIRE OR EXPLOSION HAZARD
Failure to follow the safety warnings exactly could result in serious injury, death or property damage.
Never test for gas leaks with an open flame. Use a commercially available soap solution made specifically for the detection of leaks to check all connections. A fire or explosion may result causing property damage, personal injury or loss of life.
AVERTISSEMENT
RISQUE D’INCENDIE OU D’EXPLOSION
Si les consignes de sécurité ne sont pas suivies à la lettre, cela peut entraîner la mort, de graves blessures ou des dommages matériels.
Ne jamais vérifier la présence de fuites de gaz au moyen d’une flamme nue. Vérifier tous les raccords en utilisant une solution savonneuse commerciale conçue spécialement pour la détection de fuites. Un incendie ou une explosion risque de se produire, ce qui peut entraîner la mort, des blessures ou des dommages matériels.

CAUTION
FROZEN AND BURST WATER PIPE HAZARD Failure to protect against the risk of freezing may result in property damage. Special precautions MUST be made if installing furnace in an area which may drop below freezing. This can cause improper operation or damage to equipment. If the furnace environment has the potential of freezing, the drain trap and drain line must be protected. The use of accessory drain trap heaters, electric heat tape and/or RV antifreeze is recommended for these installations.
WARNING
To prevent personal injury or death due to improper installation, adjustment, alteration, service or maintenance, refer to this manual. For additional assistance or information, consult a qualified installer, servicer agency or the gas supplier.
WARNING
If the information in these instructions is not followed exactly, a fire or explosion may result causing property damage, personal injury or loss of life. – do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. – WHAT TO DO IF YOU SMELL GAS:
· Do not try to light any appliance. · Do not touch any electrical switch; do not use any
phone in your building. · Immediately call your gas supplier from a neighbor’s
phone. Follow the gas supplier’s instructions. If you cannot reach your gas supplier, call the fire department. – Installation and service must be performed by a qualified installer, service agency or the gas supplier.

3

WARNING
Heating unit should not be utilized without reasonable, routine, inspection, maintenance and supervision. If the building in which any such device is located will be vacant, care should be taken that such device is routinely inspected, maintained and monitored. In the event that the building maybe exposed to freezing temperatures and will be vacant, all water-bearing pipes should be drained, the building should be properly winterized, and the water source closed. In the event that the building may be exposed to freezing temperatures and will be vacant, any hydronic coil units should be drained as well and, in such case, alternative heat sources should be utilized.

WARNING
Should overheating occur or the gas supply fail to shut off, turn off the manual gas shutoff valve external to the furnace before turning off the electrical supply.
To The Installer Before installing this unit, please read this manual thoroughly to familiarize yourself with specific items which must be adhered to, including but not limited to: unit maximum external static pressure, gas pressures, BTU input rating, proper electrical connections, circulating air temperature rise, minimum or maximum CFM.

WARNING
To prevent possible property damage, personal injury or death due to electrical shock, the furnace must be located to protect the electrical components from water.

WARNING
To prevent property damage, personal injury or death due to fire, do not install this furnace in a mobile home, trailer, or recreational vehicle.

WARNING
Possible property damage, personal injury or death due to fire, explosion, smoke, soot, condensation, electrical shock or carbon monoxide may result from improper installation, repair operation, or maintenance of this product.

Product Application VALID EQUIPMENT COMBINATIONS

Furnace Alone

– – –

Furnace + 1 Stage Non-Communicating A/C

Shipping Inspection All units are securely packed in shipping containers
tested according to International Safe Transit Association
specifications. The carton must be checked upon arrival for external damage. If damage is found, a request for
inspection by carrier’s agent must be made in writing immediately.

Furnace + Furnace + Furnace + Furnace + Furnace + Furnace +

2 Stage Non-Communicating A/C 1 Stage Non-Communicating H/P 2 Stage Non- Communicating H/P
Communicating A/C Communicating H/P Communicating A/C Inverter

The furnace must be carefully inspected on arrival for damage and bolts or screws which may have come loose in transit. In the event of damage the consignee should:
1. Make a notation on delivery receipt of any visible damage to shipment or container.
2. Notify carrier promptly and request an inspection. 3. With concealed damage, carrier must be notified as
soon as possible – preferably within five days. 4. File the claim with the following support documents
within a nine month statute of limitations. · Original or certified copy of the Bill of Lading, or indemnity bond. · Original paid freight bill or indemnity in lieu thereof. · Original or certified copy of the invoice, showing trade and other discounts or reductions. · Copy of the inspection report issued by carrier’s representative at the time damage is reported to carrier.
The carrier is responsible for making prompt inspection of damage and for a thorough investigation of each claim. The distributor or manufacturer will not accept claims from dealers for transportation damage.

Furnace +

Communicating H/P Inverter
Table 1

This furnace is primarily designed for residential home-
heating applications. It is NOT designed or certified for use in mobile homes, trailers or recreational vehicles. Neither is it designed or certified for outdoor applications. The furnace must be installed indoors (i.e., attic space, crawl space, or garage area provided the garage area is
enclosed with an operating door).

This furnace can be used in the following non-industrial commercial applications: schools, office buildings, churches, retail stores, nursing homes, hotels/motels,
common or office areas. In such applications, the furnace must be installed with the following stipulations:
· It must be installed per the installation instructions provided and per local and national codes.
· It must be installed indoors in a building constructed on site.
· It must be part of a ducted system and not used in a free air delivery application.
· It must not be used as a “make-up” air unit.

4

· It must be installed as a two-pipe systems for combustion air.
· All other warranty exclusions and restrictions apply This furnace is an ETL dual-certified appliance and is appropriate for use with natural or propane gas
NOTE: If using propane, a propane conversion kit is required.
Dual certification means that the combustion air inlet pipe is optional and the furnace can be vented as a:
Non-direct vent (single pipe) central forced air furnace in which combustion air is taken from the installation area or from air ducted from the outside or,

NOTE: The Commonwealth of Massachusetts requires that the following additional requirements must also be met:
· Gas furnaces must be installed by a licensed plumber or gas fitter.
· A T-handle gas cock must be used. · If the unit is to be installed in an attic, the passageway
to and the service area around the unit must have flooring.
To ensure proper furnace operation, install, operate and maintain the furnace in accordance with these installation and operation instructions, all local building codes and ordinances.

Direct vent (dual pipe) central forced air furnace in which all combustion air supplied directly to the furnace burners through a special air intake system outlined in these instructions.

In their absence, follow the latest edition of the National Fuel Gas Code (NFPA 54/ANSI Z223.1), and/or CAN/CSA
B149.1-15 Installation Codes, local plumbing or waste water codes, and other applicable codes.

NOTE: This furnace may be used as a construction site heater ONLY if all of the following conditions are met:
· The vent system is permanently installed per these
installation instructions.
· A room thermostat is used to control the furnace.
Fixed jumpers that provide continuous heating
CANNOT be used and can cause long term equipment damage. Bi-metal thermostats, or any
thermostat affected by vibration must not be used during construction.
· Return air ducts are provided and sealed to the
furnace.
· A return air temperature range between 60ºF (16ºC) and 80ºF (27ºC) is maintained.
· MERV 11 (Example P/N AMP-11-2025-45) air filter(s) are installed in the system and inspected daily and
replaced as needed during construction and upon
completion of construction.
· The input rate and temperature rise are set per the
furnace rating plate.
· The furnace must be installed as a two pipe system, using 100% outside air for combustion during construction.
· The furnace heat exchanger, components, duct
system, air filters and evaporator coils are thoroughly cleaned following final construction clean up by a qualified person. · All furnace operating conditions (including ignition,
input rate, temperature rise and venting) are verified by a qualified person according to these installation instructions.
· Furnace doors must be in place on the furnace while the furnace is operating in any mode.
· Damage or repairs due to failure to comply with these
requirements are not covered under the warranty.

A copy of the National Fuel Gas Code (NFPA 54/ANSI Z223.1) can be obtained from any of the following: American National Standards Institute 25 West 43rd Street, 4th Floor New York, NY 10036 National Fire Protection Association 1 Batterymarch Park Quincy, MA 02169-7471 CSA International 8501 East Pleasant Valley Independence, OH 44131
The rated heating capacity of the furnace should be greater than or equal to the total heat loss of the area to be heated. The total heat loss should be calculated by an approved method or in accordance with “ASHRAE Guide” or “Manual J-Load Calculations” published by the Air Conditioning Contractors of America.
A copy of the CAN/CSA B149.1-15 Installation Codes can also be obtained from:
CSA International 178 Rexdale Boulevard Etobicoke, Ontario, Canada M9W 1R3
LOCATION REQUIREMENTS & CONSIDERATIONS
Follow the instructions listed below and the guidelines provided in the Combustion and Ventilation Air Requirements section when selecting a furnace location.
WARNING
To prevent possible equipment damage, property damage, personal injury or death, the following bullet points must be observed when installing this unit.

5

WARNING
Possible property damage, personal injury or death due to fire, explosion, smoke, soot, condensation, electrical shock or carbon monoxide may result from improper installation, repair operation, or maintenance of this product.
· Centrally locate the furnace with respect to the proposed or existing air distribution system.
· Ensure the temperature of the return air entering the furnace is between 55°F and 100°F when the furnace is heating.
· Provide provisions for venting combustion products outdoors through a proper venting system. Special consideration should be given to vent/flue pipe routing and combustion air intake pipe when applicable. Refer to Vent/Flue Pipe and Combustion Air Pipe -Termination Locations for appropriate termination locations and to determine if the piping system from furnace to termination can be accomplished within the guidelines given. NOTE: The length of flue and/ or combustion air piping can be a limiting factor in the location of the furnace.
· Locate the furnace so condensate flows downwards to the drain. Do not locate the furnace or its condensate drainage system in any area subject to below freezing temperatures without proper freeze protection. Refer to Condensate Drain Lines and Trap for further details.
· Ensure adequate combustion air is available for the furnace. Improper or insufficient combustion air can expose building occupants to gas combustion products that could include carbon monoxide. Refer to Combustion and Ventilation Air Requirements.
· Set the furnace on a level floor to enable proper condensate drainage. If the floor becomes wet or damp at times, place the furnace above the floor on a concrete base sized approximately 1-1/2″ larger than the base of the furnace. Refer to the Horizontal Applications and Considerations for leveling of horizontal furnaces.
· Ensure upflow or horizontal furnaces are not installed directly on carpeting, or any other combustible material. The only combustible material allowed is wood.
· A special accessory subbase must be used for upright counterflow unit installations over any combustible material (including wood). Refer to subbase instructions for installation details. NOTE: A subbase will not be required if an air conditioning coil is located beneath the furnace between the supply air opening and the combustible floor.
· Exposure to contaminated combustion air will result in safety and performance-related problems. Do not install the furnace where the combustion air is exposed to the following substances: – permanent wave solutions
– cleaning solutions (such as perchloroethylene)

– printing inks
– chlorinated waxes or cleaners
– paint removers
– chlorine-based swimming pool chemicals – varnishes
– water softening chemicals
– hydrochloric acid
– carbon tetrachloride – cements and glues
-deicing salts or chemicals
– halogen type refrigerants
– antistatic fabric softeners for clothes dryers – masonry acid washing materials · Isolate a non-direct vent furnace if it is installed near an area frequently contaminated by any of the above substances. This protects the non- direct vent furnace from airborne contaminants. To ensure that the enclosed non-direct vent furnace has an adequate supply of combustion air, vent from a nearby uncontaminated room or from outdoors. Refer to the Combustion and Ventilation Air Requirements for details.
· If the furnace is used in connection with a cooling coil
unit, install the furnace upstream or in parallel with the
cooling coil unit. Premature heat exchanger failure
will result if the cooling unit is placed ahead of the
furnace.
· For vertical (upflow or downflow) applications, the minimum cooling coil width shall not be less than furnace width minus 1″. Additionally, a coil installed above an upflow furnace or under a counterflow furnace may be the same width as the furnace or may be one size larger than the furnace. Example: a “C” width coil may be installed with a “B” width furnace. For upflow applications, the front of the coil and furnace must face the same direction.
· If the furnace is installed in a residential garage,
position the furnace so that the burners and ignition source are located not less than 18 inches (457 mm)
above the floor. Protect the furnace from physical damage by vehicles. · If the furnace is installed horizontally, ensure the
access doors are not on the “up/top” or “down/bottom” side of the furnace.
· Do not connect this furnace to a chimney flue that serves a separate appliance designed to burn solid fuel.
· On Counterflow Installations, the air conditioning coil must be downstream on the supply (positive) side of the furnace heat exchanger.
· Counterflow Installation over a noncombustible floor. Before setting the furnace over the plenum opening,
ensure the surface around the opening is smooth
and level. A tight seal should be made between the furnace base and floor by using a silicone rubber caulking compound or cement grout.

6

· Counterflow Installation over a combustible floor. If installation over a combustible floor becomes necessary, use an accessory subbase (see Specification Sheet applicable for your model for details). A special accessory subbase must be used for upright counterflow unit installations over any combustible material including wood. Refer to subbase instructions for installation details. Follow the instructions with the subbase for proper installation. Do not install the furnace directly on carpeting, tile, or other combustible material other than wood flooring.
NOTE: A subbase will not be required if an air conditioning coil is installed between the supply air opening on the furnace and the floor.)

*MVC96 MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS (INCHES)

POSITION* SIDES REAR FRONT BOTTOM

Upflow

0″

0″

3″

C

Horizontal

6″

0″

3″

C

C = If placed on combustible floor, floor MUST be wood only.

FLUE 0″ 0″

TOP 1″ 6″

Table 2

*CVC96 MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS (INCHES)

POSITION* SIDES REAR FRONT BOTTOM FLUE TOP

Counterflow 0″

0″

3″

NC

0″

1″

Horizontal

6″

0″

3″

C

0″

6″

C = If placed on combustible floor, floor MUST be wood only.

NC = For installation on non-combustible floors only. A combustible subbase must be used for installations on combustible flooring.

Table 3

TOP

TOP

NOTE: Installations must adhere to the clearances to combustible materials to which this furnace has been design certified. The minimum clearance information for this furnace is provided on the unit’s clearance label. These clearances must be permanently maintained. Clearances must also accommodate an installation’s gas, electrical, and drain trap and drain line connections. If the alternate combustion air intake or vent/flue connections are used additional clearance must be provided to accommodate these connections. Refer to Vent/Flue Pipe and Combustion Air Pipe for details.
Clearance in accordance with local installation codes, the requirements of the gas supplier and the manufacturer’s installation instructions.
Dégaugement conforme aux dodes d’installation locaux, aux exigences du fournisseur de gaz et aux instructions d’installation du fabricant.
NOTE: In addition to the required clearances to combustible materials, a minimum of 24 inches service clearance must be available in front of the unit.
A furnace installed in a confined space (i.e., a closet or utility room) must have two ventilation openings with a total minimum free area of 0.25 square inches per 1,000 BTU/hr of furnace input rating. Refer to Specification Sheet applicable to your model for minimum clearances to combustible surfaces. One of the ventilation openings must be within 12 inches of the top; the other opening must be within 12 inches of the bottom of the confined space. In a typical construction, the clearance between the door and door frame is usually adequate to satisfy this ventilation requirement.

BOTTOM

BOTTOM

Counterflow
Figure 1

Clearances and Accessibility NOTE: For servicing or cleaning, a 24″ front clearance is required. Unit connections (electrical, flue and drain) may necessitate greater clearances than the minimum clearances listed above.

NOTE: In all cases, accessibility clearance must take precedence over clearances from the enclosure where accessibility clearances are greater.

Existing Furnace Removal NOTE: When an existing furnace is removed from a venting system serving other appliances, the venting system may be too large to properly vent the remaining attached appliances.
The following vent testing procedure is reproduced from the American National Standard/National Standard of Canada for Gas-Fired Central Furnaces ANSI Z21.47, CSA-2.3 latest edition Section 1.23.1.
The following steps shall be followed with each appliance connected to the venting system placed in operation, while any other appliances connected to the venting system are not in operation:
1. Seal any unused openings in the venting system.

7

2. Inspect the venting system for proper size and horizontal pitch, as required by the National Fuel Gas Code, ANSI Z223.1 or the Natural Gas and Propane Installation Code, CAN/CSA B149.1-15 and these instructions. Determine that there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition.
3. As far as practical, close all building doors and windows and all doors between the space in which the appliance(s) connected to the venting system are located and other spaces of the building.
4. Close fireplace dampers. 5. Turn on clothes dryers and any appliance not
connected to the venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they shall operate at maximum speed. Do not operate a summer exhaust fan. 6. Follow the lighting instructions. Place the appliance being inspected in operation. Adjust thermostat so appliance shall operate continuously. 7. Test for spillage from draft hood appliances at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle. 8. If improper venting is observed during any of the above tests, the venting system must be corrected in accordance with the National Fuel Gas Code ANSI Z223.1/NFPA 54 and/or National Gas and Propane Installation Code CAN/CSA B149.1-15. 9. After it has been determined that each appliance connected to the venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas burning appliance to their previous conditions of use.
If resizing is required on any portion of the venting system, use the appropriate table in Appendix G in the latest edition of the National Fuel Gas Code ANSI Z223.1 and/or CAN/ CSA B149.1-15 Installation Codes.

House depressurization can cause back drafting or improper combustion of gas- fired appliances, thereby exposing building occupants to gas combustion products that could include carbon monoxide.
If this furnace is to be installed in the same space with other gas appliances, such as a water heater, ensure there is an adequate supply of combustion and ventilation air for the other appliances. Refer to the latest edition of the National Fuel Gas Code NFPA 54/ANSI Z223.1 or CAN/ CSA B149.1-15 Installation Codes or applicable provisions of the local building codes for determining the combustion air requirements for the appliances.
Most homes will require outside air be supplied to the furnace area by means of ventilation grilles or ducts connecting directly to the outdoors or spaces open to the outdoors such as attics or crawl spaces.
INSTALLATION POSITIONS
This furnace may be installed in an upright position or horizontal on either the left or right side panel. Do not install this furnace on its back. For upright upflow furnaces, return air ductwork may be attached to the side panel(s) and/or basepan. For horizontal upflow furnaces, return air ductwork must be attached to the basepan. For both upright or horizontal counterflow furnaces, return ductwork must be attached to the basepan (top end of the blower compartment).
NOTE: Ductwork must never be attached to the back of the furnace. Contact your distributor for proper airflow requirements and number of required ductwork connections. Refer to “Recommended Installation Positions” figure for appropriate installation positions, ductwork connections, and resulting airflow arrangements.

COMBUSTION & VENTILATION AIR REQUIREMENTS
WARNING
To avoid property damage, personal injury or death, sufficient fresh air for proper combustion and ventilation of flue gases must be supplied. Most homes require outside air be supplied into the furnace area.
Improved construction and additional insulation in buildings have reduced heat loss by reducing air infiltration and escape around doors and windows. These changes have helped in reducing heating/cooling costs but have created a problem supplying combustion and ventilation air for gas fired and other fuel burning appliances. Appliances that pull air out of the house (clothes dryers, exhaust fans, fireplaces, etc.) increase the problem by starving appliances for air.

HORIZONTAL APPLICATIONS & CONSIDERATIONS

3/8″ DIAMETER THREADED ROD
(6 PLACES)
HOLD DOWN NUTS
SUPPORT NUTS

PROVIDE 8″ MINIMUM CLEARANCE BETWEEN CENTER ROD AND FURNACE CABINET TO ALLOW FOR CIRCULATOR
BLOWER REMOVAL
ASSURE FURNACE IS LEVEL FROM END TO END AND HAS A SLIGHT FORWARD TILT WITH THE FRONT OF THE FURNACE 0″-3/4″ BELOW THE BACK OF THE FURNACE

2″x2″x1/8″ ANGLE IRON (3 PLACES)

POSITION AS CLOSE AS POSSIBLE TO BLOWER DECK TO ALLOW FOR CIRCULATOR BLOWER REMOVAL
Figure 2

TILT OUTWARD TO ALLOW FOR DOOR AND CIRCULATOR BLOWER
REMOVAL

8

WARNING
CARBON MONOXIDE POISONING HAZARD Failure to follow the steps outlined below for each appliance connected to the venting system being placed into operation could result in carbon monoxide poisoning or death.
The following steps shall be followed with each appliance connected to the venting system placed in operation, while any other appliances connected to the venting system are not in operation:
1. Seal any unused openings in the venting system. 2. Inspect the venting system for proper size and
horizontal pitch, as required by the National Fuel Gas Code, ANSI Z223.1 or the Natural Gas and Propane Installation Code, CSA B149.1-15 and these instructions. Determine that there is no blockage or restriction, leakage, corrosion and other deficiencies which could cause an unsafe condition. 3. As far as practical, close all building doors and windows and all doors between the space in which the appliance(s) connected to the venting system are located and other spaces of the building. 4. Close fireplace dampers. 5. Turn on clothes dryers and any appliance not connected to the venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they shall operate at maximum speed. Do not operate a summer exhaust fan. 6. Follow the lighting instructions. Place the appliance being inspected in operation. Adjust thermostat so appliance shall operate continuously. 7. Test for spillage from draft hood appliances at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle. 8. If improper venting is observed during any of the above tests, the venting system must be corrected in accordance with the National Fuel Gas Code ANSI Z223.1/NFPA 54 and/or National Gas and Propane Installation Code CSA B149.1-15. 9. After it has been determined that each appliance connected to the venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas burning appliance to their previous conditions of use.

AVERTISSEMENT
RISQUE D’INTOXICATION AU MONOXYDE DE CARBONE Si les étapes décrites ci-dessous ne sont pas suivies pour chacun des appareils raccordés au système de ventilation au moment de sa mise en marche, cela peut entraîner une intoxication au monoxyde de carbone ou la mort.
Les étapes suivantes doivent être suivies pour chacun des appareils raccordés au système de ventilation au moment de sa mise en marche, alors que tous les autres appareils raccordés au système de ventilation ne sont pas en marche :
1. Sceller toutes les ouvertures inutilisées du système de ventilation.
2. Inspecter le système de ventilation afin de vérifier si la taille et l’inclinaison par rapport à l’horizontale sont conformes aux exigences du National Fuel Gas Code, ANSI Z223.1/NFPA 54 ou du Code d’installation du gaz naturel et du propane, CSA B149.1 et à ces instructions. Vérifier qu’il n’y a pas d’obstruction ou de restriction, de fuite, de corrosion et d’autres problèmes qui pourraient entraîner une situation dangereuse.
3. Si possible, fermer toutes les portes et fenêtres du bâtiment ainsi que toutes les portes séparant l’endroit où se trouvent les appareils raccordés au système de ventilation et les autres zones du bâtiment.
4. Fermer le registre des foyers. 5. Mettre les sécheuses en marche ainsi que tous les
autres appareils qui ne sont pas raccordés au système de ventilation. Mettre en marche tous les ventilateurs de tirage, comme celui des hottes de cuisine et des salles de bains, et les régler à la puissance maximale. Ne pas mettre en marche les ventilateurs d’été. 6. Suivre les instructions d’allumage. Mettre en marche l’appareil soumis à l’inspection. Régler le thermostat de manière à ce que l’appareil fonctionne en continu. 7. Vérifier la présence de fuite au niveau de l’ouverture du coupe-tirage des appareils qui en sont dotés après 5 minutes de fonctionnement du brûleur principal. Utiliser la flamme d’une allumette ou d’une bougie. 8. Si un problème de ventilation est observé pendant l’un des essais décrits ci-dessus, des correctifs doivent être apportés au système de ventilation conformément au National Fuel Gas Code, ANSI Z223.1/NFPA 54 et (ou) au Code d’installation du gaz naturel et du propane, CSA B149.1. 9. Une fois qu’il a été déterminé que chaque appareil raccordé au système de ventilation fonctionne correctement au moyen des essais décrits ci-dessus, les portes, les fenêtres, les ventilateurs, les registres de foyer et tous les autres appareils de combustion alimentés au gaz doivent être remis dans leur état initial.

When installing a furnace horizontally, additional consideration must be given to the following:
Furnace Suspension If suspending the furnace from rafters or joists, use 3/8″ threaded rod and 2″x2″x1/8″ angle iron as shown in the following diagram. The length of rod will depend on the application and the clearances necessary.

9

If the furnace is installed in a crawl space it must be suspended from the floor joist or supported by a concrete pad. Never install the furnace on the ground or allow it to be exposed to water.
Front Cover Pressure Switch Tube Location When a furnace is installed horizontally with left side down the front cover pressure switch tube must be re-located to the lower port of the collector box cover.
1. Remove tube from front cover pressure switch and collector box cover.
2. Remove rubber plug from bottom collector box port and install on top collector box port.
3. Locate 24″ x 1/4″ tube in bag assembly. 4. Install one end on front cover pressure switch. 5. Route tube to lower port on collector box cover and
cut off excess tubing.
Drain Trap and Lines In horizontal applications the condensate drain trap is secured to the furnace side panel, suspending it below the furnace. A minimum clearance of 5 ½” below the furnace must be provided for the drain trap. Additionally, the appropriate downward piping slope must be maintained from the drain trap to the drain location. Refer to Condensate Drain Trap and Lines for further details. If the drain trap and drain line will be exposed to temperatures near or below freezing, adequate measures must be taken to prevent condensate from freezing.
Leveling Leveling ensures proper condensate drainage from the heat exchanger. For proper flue pipe drainage, the furnace must be level lengthwise from end to end. The furnace should have a slight tilt from back to front with the access doors downhill from the back panel approximately 1/2 to 3/4 inches. The slight tilt allows the heat exchanger condensate, generated in the recuperator coil, to flow forward to the recuperator coil front cover.

Figure 3B
Recommended Installation Positions Figure 3C
Alternate Electrical and Gas Line Connections This furnace has provisions allowing for electrical and gas line connections through either side panel. In horizontal applications the connections can be made either through the “top”or “bottom” of the furnace. Drain Pan A drain pan must be provided if the furnace is installed above a conditioned area. The drain pan must cover the entire area under the furnace (and air conditioning coil if applicable). Freeze Protection Refer to Horizontal Applications and Conditions – Drain Trap and Lines.
WARNING
Possible property damage, personal injury or death may occur if the correct conversion kits are not installed. The appropriate kits must be applied to ensure safe and proper furnace operation. All conversions must be performed by a qualified installer or service agency.

Alternate Vent/Flue Location Figure 3A
10

VENT PIPE & COMBUSTION AIR
This manual will refer to the pipe that discharges products of combustion to the outdoors as the “vent” pipe or “flue” pipe. The pipe that supplies air for combustion to the furnace will be referred to as the “intake” pipe or “combustion air” pipe.
This furnace is dual certified and may be installed as a non-direct vent (single pipe) or direct vent (dual pipe) appliance.
Materials – Installations in the U.S.A. PVC, CPVC, or ABS pipe & fittings are typically used as venting and intake pipe materials. All 90° elbows must be medium or long radius types. A medium radius elbow should measure ~3-1/16″ minimum from the plane of one opening to the center line of the other opening for 2″ diameter pipe, and ~4-9/16″ minimum for 3″ pipe. In addition to these materials, Innoflue® by Centrotherm Eco Systems is also an approved vent and combustion air materials for installations in the U.S.A. Manufacturers Installation instructions for these products must be followed. These products have specific instructions for installing, joining and terminating. Do not mix materials or components of one manufacturer with materials or components of another manufacturer. Refer to the following chart for plastic pipe & fittings specifications
Materials – Installation in Canada All installations in Canada must conform to the requirements of CAN/CSA B149.1-15 code. All vent components, including primer and cement, must be listed to ULC S636. The certified pipe and fittings should be clearly marked with the ULC standard “S636″. The primer and cement used must be of the same manufacturer as the vent system. For Royal Pipe System 636; use GVS65 Primer (Purple) and GVS-65 PVC Solvent Cement. For IPEX System 636, use PVC/CPVC Primer, Purple or clear. Use PVC Solvent cement (Gray). For Canadian installations, ABS may be used as a combustion air pipe only. ABS is not an approved vent material in Canada. If ABS is used as a combustion air pipe, it must be CSA certified. Always follow the manufacturer’s instructions in the use of primer and cement. Do not use primer and cement around potential sources of ignition. Do not use primer or cement beyond its expiration date.

VENTING MATERIAL REQUIREMENTS

PVC

ASTM STANDARD

SCHEDULE 40 PIPE

D1785

SDR 21 or 26 PIPE

D2241

SYTSTEM 1738® (IPEX)

D1784, UL 1738

SCHEDULE 40 FITTINGS

D2466

SYTSTEM 1738® FITTINGS

D1784, UL 1738

ABS

SCHEDULE 40 PIPE

D1527

FITTINGS

D2468

CPVC

SCHEDULE 40 PIPE

F441

SDR 21 or 26 PIPE

F442

FITTINGS

F438

POLYPROPYLENE

INNOFLUE® (CENTROTHERM)

UL 1738

PRIMER & SOLVENT CEMENT

PVC PRIMER

F656

CPVC PRIMER

F656

PVC SOLVENT CEMENT

D2564

CPVC SOLVENT CEMENT

F493

ABS SOLVENT CEMENT

D2235

ABS/PVC/CPVC ALL PURPOSE CEMENT (FOR PIPE & FITTINGS OF

THE SAME MATERIAL)

D2564, D2235, F493

TRANSITION CEMENT FOR ABS TO PVC or CPVC INSTALLATIONS IN CANADA
PVC & CPVC PIPE & FITTINGS PVC & CPVC SOLVENT CEMENT TRANSITION CEMENT

D3188

INNOFLUE® (CENTROTHERM)

ULC S636

POLYPRO® (DURAVENT)

SYSTEM 636® (IPEX)

WARNING
Upon completion of the furnace installation, carefully inspect the entire flue system both inside and outside of the furnace to assure it is properly sealed. Leaks in the flue system can result in serious personal injury or death due to exposure to flue products, including carbon monoxide.

WARNING
Failure to follow these instructions can result in bodily injury or death. Carefully read and follow all instructions given in this section.

WARNING
To avoid bodily injury, fire or explosion, solvent cements must be kept away from all ignition sources (i.e., sparks, open flames, and excessive heat) as they are combustible liquids. Avoid breathing cement vapors or contact with skin and/or eyes.
11

PREFERRED

Termination Locations
Non-Direct Vent &
Direct Vent Vent/Flue Terminations
Non-Direct Vent Vent/Flue Termination
No Terminations Above Walkway

ACCEPTABLE

Figure 4

TRANSITION NO LESS THAN 45 DEGREES TO HORIZONTAL PLANE TO AVOID CREATING A WATER TRAP IN VENT PIPING.

Grade or Highest Anticipated Snow Level
Forced Air Inlet Direct Vent Vent/Flue Termination
Vent Clearances Figure 7
VENT-DRAIN

Non-Direct Vent Vent/Flue Termination

Figure 5
NO TRANSITION ON HORIZONTAL PLANE, THIS CREATES A WATER TRAP AND RESTRICTS FLUE GASES

Figure 8
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a precaution when removing hole plugs.

Figure 6

Figure 9
12

MVC96/CVC96 Direct Vent (2 – Pipe) and Non-Direct Vent (1- Pipe)

Maximum Allowable Length of Vent/Flue Pipe & Combustion Air Pipe (ft)

Pipe Size

Number of Elbows

M ODEL

(in.)

1

2

3

4

5

6

7

8

2

120

115

110

105

100

95

90

85

*M V96C0403BN

3

134

127

120

113

106

99

92

85

2 *M VC960603BN
3

100

95

90

85

80

75

70

65

151

144

137

130

123

116

109

102

2 *M VC960803BN

45

40

35

30

25

20

15

10

3

113

106

99

92

85

78

71

64

2 *M VC960804CN
3

70

65

60

55

50

45

40

35

89

82

75

68

61

54

47

40

2 *M VC961005CN
3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

120

113

106

99

92

85

78

71

2 *M VC961005DN
3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

151

144

137

130

123

116

109

102

2 *M VC961205DN
3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

151

144

137

130

123

116

109

102

2 *CVC960403BN
3

120

115

110

105

100

95

90

85

185

178

171

164

157

150

143

136

2 *CVC960603BN
3

85

80

75

70

65

60

55

50

168

161

154

147

140

133

126

119

2

40

35

30

25

20

15

10

5

*CVC960804CN

3

120

113

106

99

92

85

78

71

2 *CVC961005CN
3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

113

106

99

92

85

78

71

64

2 *CVC961205DN
3

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

151

144

137

130

123

116

109

102

Table 4

Insert flange. Cut 2 ½” long.

RF000142

Figure 11
Figure 10
13

WARNING
The rubber elbow is not designed to support a load. When the rubber elbow is mounted externally to the furnace cabinet, extreme care must be taken to adequately support field-supplied vent/flue piping, as damage can result in leaks causing bodily injury or death due to exposure to flue gases, including carbon monoxide.

Vent/Flue Pipe Terminations
12″ MIN.
VENT/FLUE TEE (OPTIONAL) or
45° ELBOW TURNED DOWN or 90° ELBOW TURNED
DOWN

Combustion Air Intake Options The RF000142 coupling can be secured directly to the furnace intake coupling if condensation is a concern. If
the RF000142 is used on the combustion air inlet, it must be installed with the arrow pointing up. It should be noted, the combustion air will actually be moving in a direction opposite of the arrow on the RF000142 coupling. It must
have a field supplied, trapped drain tube free-draining to proper condensate disposal location. A loop in the drain
tube can serve as a trap. The unused RF000142 drain fitting should be capped. A tee installed in the intake pipe is also an acceptable method of catching condensation. It must have a field supplied, trapped drain tube or pipe, freedraining to proper condensate disposal location. A loop in
the drain tube can serve as a trap.

Horizontal Termination (Single Pipe) Above Highest Anticipated Snow Level
Figure 13
6″ MAX 4″ MIN

12″ MIN. TO GRADE OR HIGHEST ANTICIPATED
SNOW LEVEL
Standard Horizontal Terminations (Dual Pipe) Figure 14
DOWN VENTING UPFLOW MODEL FURNACES ONLY

Combustion Air Intake Options Figure 12
CAUTION
Be sure not to damage internal wiring or other components when reinstalling coupling and screws.
NOTE: For installations at or above 7,000 feet altitude, use 3″ venting.

Use alternate vent & combination air locations

Vent Pipe

6′ Max.

Combustion Air Pipe

Floor

Field Supplied Drain Tee on Vent Pipe

Basement / Crawlspace

1/4″ per foot min.

Condensate trapped

slope to furnace

to prevent flue gas from escaping

and routed to field supplied

condensate disposal

All piping and fittings must be joined per material manufacturers specifications to prevent separation and flue gas leaks.

Figure 15

14

TEE (OPTIONAL)

COMBUSTION AIR INTAKE (OPTIONAL)
*Not required for single pipe installation
ROOF LINE

12″ MIN HEIGHT DIFFERENCE
BETWEEN
INTAKE AND VENT

12″ MIN TO ROOF OR HIGHEST ANTICIPATED SNOW LEVEL

96″ MAX. – 3″ MIN.

Figure 16

COMBUSTION AIR INTAKE.

DISTANCE BETWEEN COMBUSTION AIR
INTAKE AND GRADE
Figure 19
90° ELBOWS

VENT/FLUE TEE
DISTANCE BETWEEN VENT AND GRADE

STRAIGHT

ELBOWS

Direct Vent (Dual Pipe) Piping Figure 17
90° ELBOWS
3″ – 24″

3″-24″ BETWEEN PIPES

Combustion Air Intake may also be snorkeled to obtain 12″ min ground clearance.
Alternate vent termination above anticipated snow level (dual pipe) Figure 20
Vent/Flue and Combustion Air Pipe Terminations

3″MIN 24″MAX
3″ MIN

12″ MIN SEPARATION

Alternate Horizontal Vent Termination (Dual Pipe) Figure 18

12″ MIN TO GRADE OR HIGHEST ANTICIPATED SNOW LEVEL
Termination of Multiple Direct Vent Furnaces Figure 21

15

Vent/Intake Terminations For Installation of Multiple Direct Vent Furnaces If more than one direct vent furnace is to be installed vertically through a common roof top, maintain the same minimum clearances between the exhaust vent and air intake terminations of adjacent units as with the exhaust vent and air intake terminations of a single unit.
If more than one direct vent furnace is to be installed horizontally through a common side wall, maintain the clearances as in the following figure. Always terminate all exhaust vent outlets at the same elevation and always terminate all air intakes at the same elevation.
Concentric Vent Termination Refer to the directions provided with the Concentric Vent Kit or IO-619 for installation specifications.
Side Wall Vent Kit This kit is to be used with 2″ or 3″ direct vent systems. The vent kit must terminate outside the structure and may be installed with the intake and exhaust pipes located side-by-side or with one pipe above the other. These kits are NOT intended for use with single pipe (indirect vent) installations.
Refer to the directions furnished with the Side Wall Vent Kit (p/n 0170K00000S or 0170K00001S) for installation specifications.
H orizontal Installation

Ve rtica l Ins tallation

Figure 22

SPECIAL INSTRUCTIONS FOR PRODUCTS INSTALLED IN THE STATE OF
MASSACHUSETTS

For all side wall horizontally vented gas fueled equipment
installed in every dwelling, building or structure used in whole or in part for residential purposes, including those
owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven
(7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:

1. INSTALLATION OF CARBON MONOXIDE
DETECTORS. At the time of installation of the side
wall horizontal vented gas fueled equipment, the installing plumber or gasfitter shall observe that a hard wired carbon monoxide detector with an alarm and battery back-up is installed on the floor level where the gas equipment is to be installed. In addition, the installing plumber or gasfitter shall observe that a battery operated or hard wired carbon monoxide detector with an alarm is installed on each additional level of the dwelling, building or structure served by the side wall horizontal vented gas fueled equipment. It shall be the responsibility of the property owner to secure the services of qualified licensed professionals for the installation of hard wired carbon monoxide detectors.
a. In the event that the side wall horizontally
vented gas fueled equipment is installed in a crawl space or an attic, the hard wired carbon monoxide detector with alarm and battery backup may be installed on the next adjacent floor level. b. In the event that the requirements of this subdivision can not be met at the time of completion of installation, the owner shall have
a period of thirty (30) days to comply with the above requirements; provided, however, that during said thirty (30) day period, a battery operated carbon monoxide detector with an alarm shall be installed.
2. APPROVED CARBON MONOXIDE DETECTORS. Each carbon monoxide detector as required in accordance with the above provisions shall comply with NFPA 720 and be ANSI/UL 2034 listed and IAS certified.
3. SIGNAGE. A metal or plastic identification plate shall be permanently mounted to the exterior of the building at a minimum height of eight (8) feet above grade directly in line with the exhaust vent terminal for the horizontally vented gas fueled heating
appliance or equipment. The sign shall read, in print size no less than one- half (1/2) inch in size, “GAS VENT DIRECTLY BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”. 4. INSPECTION. The state or local gas inspector of the
side wall horizontally vented gas fueled equipment
shall not approve the installation unless, upon inspection, the inspector observes carbon monoxide detectors and signage installed in accordance with the
provisions of 248 CMR 5.08(2)(a)1 through 4.

16

Exemptions The following equipment is exempt from 248 CMR 5.08(2) (a)1 through 4:
1. The equipment listed in Chapter 10 entitled “Equipment Not Required To Be Vented” in the most current edition of NFPA 54 as adopted by the Board; and
2. Product Approved side wall horizontally vented gas fueled equipment installed in a room or structure separate from the dwelling, building or structure used in whole or in part for residential purposes. c. MANUFACTURER REQUIREMENTS – GAS EQUIPMENT VENTING SYSTEM PROVIDED. When the manufacturer of Product Approved side wall horizontally vented gas equipment provides a venting system design or venting system components with the equipment, the instructions provided by the manufacturer for installation of the equipment and the venting system shall include:
1. Detailed instructions for the installation of the venting system design or the venting system components; and
2. A complete parts list for the venting system design or venting system. d. MANUFACTURER REQUIREMENTS – GAS EQUIPMENT VENTING SYSTEM NOT PROVIDED. When the manufacturer of a Product Approved side wall horizontally vented gas fueled equipment does not provide the parts for venting the flue gases, but identifies “special venting systems”, the following requirements shall be satisfied by the manufacturer:
1. The referenced “special venting system” instructions shall be included with the appliance or equipment installation instructions; and
2. The “special venting systems” shall be Product Approved by the Board, and the instructions for that system shall include a parts list and detailed installation instructions. e. A copy of all installation instructions for all Product Approved side wall horizontally vented gas fueled equipment, all venting instructions, all parts lists for venting instructions, and/or all venting design instructions shall remain with the appliance or equipment at the completion of the installation.

1 #4

2 #3

5

8 #7

9 #10 Coupling

100 Degree

6

11

Elbow

Figure 23
NOTE: Drain components shown for information purposes only. For horizontal installations, a Horizontal Drain Kit may be needed. Refer to the Specifications Sheet for kit part number.

CONDENSATE DRAIN LINES & DRAIN TRAP

A condensing gas furnace achieves its high level of efficiency by extracting heat from the products of combustion to the point where condensation takes place. The condensate must be collected in the furnace drain trap and routed to an appropriate drain location in compliance with local and national codes.
Follow the bullets listed below when installing the drain system. Refer to the following sections for specific details concerning furnace drain trap installation and drain hose hook ups.
· The drain trap supplied with the furnace must be used.
· The drain trap must be primed at time of installation. · The drain line between furnace and drain location
must meet local and nation codes. · The drain line between furnace and drain location
must maintain a 1/4 inch per foot downward slope toward the drain. · Do not trap the drain line in any other location than at the drain trap supplied with the furnace. · If the drain line is routed through an area which may see temperatures near or below freezing, precautions must be taken to prevent condensate from freezing within the drain line.

17

· If an air conditioning coil is installed with the furnace, a common drain may be used. An open tee must be installed in the drain line, near the cooling coil, to relieve positive air pressure from the coil’s plenum. This is necessary to prohibit any interference with the function of the furnace’s drain trap.

4. Install smaller end of hose #3 on 45º elbow and secure with 1″ clamp.
5. Refer to Field Supplied Drain section for instructions
on field supplied / installed drain on outlet of furnace trap.

NOTE: In vertical installations, air conditioning coil condensate may drain into the furnace trap as long as there is a trap between the coil and the furnace trap and the drain pipe is not terminating below the water level of the furnace trap.
General Drain Information All furnace models come with a factory installed drain trap. For vertical installations, the trap will remain in the factory position except for a counterflow when the installer desires the drain to exit the right side. All furnace models installed horizontally require the trap to be relocated. Many drain hoses have a built­in grommet which will provide a cabinet seal when installed. See instructions below for your model and installation position.

Acceptable area for
drain hole.
12″

Side Cut-Out

3″

Right side shown.

Figure 24

NOTE: Both sides of the drain trap must be primed prior to initial furnace start up

Field Supplied Drain Drain the furnace and air conditioning coil if applicable, in compliance with code requirements. In horizontal or counterflow installations, a field installed rubber coupling will allow the drain trap to be removed for cleaning. The drain trap must be primed before initial furnace start up. When an air conditioning coil drain is connected to the field supplied furnace drain, it must be vented, with an open tee installed at a height no higher than the bottom of the furnace collector box to prevent air conditioning condensate from backing up into the furnace if the common drain was blocked.
Upflow Model Installed Vertically The trap and factory installed hoses remain as shipped. The furnace drain may exit either the right or left side of the furnace cabinet. Both sides of the cabinet have two .875″ diameter holes which can be used interchangeably for drain and low voltage wiring purposes. If a higher drain exit is needed, a .875″ diameter hole may be added in the area shown in Figure 22. Any unused cabinet opening must be sealed. Do not allow drain hose to sag or trap water.
Drain Exiting Right Side 1. Locate and Install the 45º pipe / hose drain coupling from the outside of the cabinet (barbed end goes in the cabinet) through hole in the right side of the cabinet and secure with two field supplied #8 selftapping screws (see Figure 23). 2. Locate the long drain hose

3 and cut at line “A”. 3. Install large end of hose #3 to trap outlet and

secure with 1.25″ clamp.

Hose #1 Hose #2

45 degree
barb-pipe adapter

45 degree
barb-pipe adapter

Installer selects right or left side drain and installs this hose accordingly.
Figure 25
Drain Exiting Left Side 1. Install the 45 degree pipe / hose drain coupling from the outside of the cabinet (barbed end goes in the cabinet) through the hole in the left side of the cabinet and secure with two field supplied #8 self-tapping screws (see Figure 23). 2. Locate the long drain hose #3 and cut at “B” line for a 17.5″ cabinet; cut at line “C” for a 21″ cabinet; do not cut for a “D” width cabinet. 3. Install large end of hose #3 to trap outlet and secure with 1.25″ clamp. 4. Install smaller end of hose #3 on 45º elbow and secure with 1″ clamp. 5. Refer to Field Supplied Drain section for instructions on field supplied / installed drain on outlet of furnace trap.

18

Upflow Model Installed Horizontally with Right Side Down Minimum 5 ½” clearance is required for the drain trap beneath the furnace.

Upflow Model Installed Horizontally with Left Side Down Minimum 5 ½” clearance is required for the drain trap beneath the furnace. *Also see Front Cover Pressure Switch Tube Location on page 10.

Hose #11

Hose #2

Figure 26
1. Remove the clamps from both ends of the drain hoses.
2. Remove the two screws holding the drain trap to the blower deck.
3. Remove the trap and two hoses from the blower deck 4. Remove the two plugs from the right side of the
cabinet and install them in the blower deck. 5. (Draining the Vent Elbow) Locate hose #2 (factory
installed) and cut 1″ away from the 45 degree bend, discard the 45 degree section. Insert hose #2 from outside the cabinet through the cabinet drain hole nearest the top. Secure it to the barbed fitting in the elbow with a red clamp. 6. (Draining the Collector Box) Install the non-grommet end of hose #11 from outside the cabinet in the bottom drain hole. Install on collector box and secure with a silver clamp. 7. Use two silver clamps and secure the hoses to drain trap. The trap outlet faces the front of the furnace. Secure the trap to the cabinet using two screws removed in step 2 by inserting the two screws through the large set of holes in the top mounting tabs of the trap into the two predrilled holes in the side of the cabinet. 8. Refer to Field Supplied Drain section for instructions on field supplied/installed drain on outlet of furnace trap.

Hose #6 Hose #5

Hose #11

Figure 27
1. Remove the clamps from the two drain tubes on the trap.
2. Remove the two screws holding the drain trap to the
blower deck. 3. Remove the trap and hoses from the blower deck . 4. Remove the two plugs from the left side of the cabinet
and install them in the blower deck. 5. (Draining the Vent Elbow) Locate hose

6. Measuring

from the non-grommet end; cut off and discard 1 ½” for a “D” width cabinet, 5″ for a “C” width cabinet, 8 ½” for a “B” width cabinet. 6. Remove the rubber plug from vent ­ drain elbow side port. Place hose #6 on the vent ­ drain elbow side port and secure with a silver clamp .
7. Unused vent-drain elbow drip leg port must be sealed to prevent flue gases from escaping. Insert the rubber plug removed in Step 6 into the unused elbow drain port; Inserting a blunt tool such as a 3/16″ Allen wrench into the center of the rubber plug will stretch the plug and allow complete insertion.
8. Locate hose #5 and cut 3″ from the non-grommet end. Discard the section without the grommet.
9. Insert the cut end of tube #5 through the lower cabinet drain hole.
10. Connect hose #6 & hose #5 using 100º elbow and secure with two red clamps
11. (Draining the Collector Box) Remove cap from left
side collector box drain port (bottom in horizontal left position) and install it on the right side (top) collector
box drain port. 12. Install the non-grommet end of hose #11 from outside
the cabinet in the upper drain hole. Install on collector box and secure with a silver clamp.

19

13. Use two silver clamps and secure the hoses to drain trap. The trap outlet faces the front of the furnace. Secure the trap to the cabinet using two screws removed in step 2 by inserting the two screws through the large set of holes in the top mounting tabs of the trap into the two predrilled holes in the side of the cabinet.
14. Refer to Field Supplied Drain section for instructions on field supplied / installed drain on outlet of furnace trap.
Upflow Model Installed Horizontally With Left Side Down – Alternate * Also see the Front Cover Pressure Switch Tube Location.
Insert flange. Cut 2 ½” long.
RF000142

9. Install the non-grommet end of hose #11 from outside
the cabinet in the upper drain hole. Install on collector box and secure with a silver clamp. 10. Use two silver clamps and secure the hoses to drain trap. The trap outlet faces the front of the furnace.
Secure the trap to the cabinet using two screws removed in step 2 by inserting the two screws through the large set of holes in the top mounting tabs of the trap into the two predrilled holes in the side of the
cabinet.

Figure 28
1. (Draining the RF000142 Coupling) Locate hose #2 (factory installed). Cut off and discard the 45°radius end.
2. Install 90°radius end of hose #2 on RF000142 drain outlet and secure with a red clamp.
3. Insert coupling in hose #2 and secure with a red clamp.
4. Locate hose #5 and cut 3″ from the non-grommet end. Discard the section without the grommet.
5. Insert the cut end of tube #5 through the lower cabinet drain hole.
6. Insert 100 degree elbow in the cut end of hose #5. 7. Locate hose #6. Using red clamps, connect between
the coupling and 100 degree elbow, cutting off excess tubing. 8. (Draining the Collector Box) Remove cap from left side collector box drain port (bottom in horizontal left position) and install it on right side (top) collector box drain port.

Hose #4 x 3

Hose #5

Figure 29
Counterflow Model Installed Vertically The furnace drain may exit the right or left side of the furnace cabinet (left side preferred). Trap and factory installed hoses remain as shipped if the drain will exit the left side of the cabinet. Draining from the right side requires re-location of the trap to outside the cabinet.
Drain Exiting Left Side 1. Install a field supplied rubber coupling secured with a 1 1/4″ clamp to enable removing the trap for future cleaning. Alternately, a PVC fitting may be glued on the trap outlet. 2. Install drain per local and National codes.

20

Drain Exiting Right Side

Counterflow Model Installed Horizontally with Right Side Down Minimum 5 ½” clearance is required for the drain trap beneath the furnace.
NOTE: For horizontal installations, some of the required hoses are found in the factory-installed hose assemblies. Remove the hose clamps to obtain the respective hoses needed for installation, and install per the following directions.

Figure 30
1. Remove hose clamps and hoses from trap. 2. Remove trap. 3. (Draining the Vent Elbow) Insert the non-grommet end
hose #10 into the cabinet back drain hole. Insert a coupling into the drip leg of the vent-drain elbow and secure with a silver clamp. Secure hose #10 on ventdrain elbow barb fitting with a silver clamp. 4. (Draining the Collector Box) Insert non-grommet end of hose #9 into the cabinet front drain hole and secure on collector box drain port with a silver clamp. 5. Mate the drain trap inlets to the hoses and secure with silver clamps. 6. Line up the trap mounting holes with the pre-drilled holes in the furnace and secure with 2 screws removed in step 2. 7. Refer to Field Supplied Drain section for instructions on field supplied / installed drain on outlet of furnace trap.

Figure 31
1. Remove the drain trap and factory installed drain tube assemblies.
2. Remove two 1″ plugs from right side of cabinet 3. (Draining the Collector Box) From outside the cabinet,
insert the non-grommet end hose #7 into the back drain hole and secure to collector box drain port using a silver clamp. 4. (Draining the Vent Elbow) Insert the straight barbed coupling into the vent ­ drain elbow drip leg and secure with a red clamp. 5. From outside the cabinet, insert the non-grommet end of hose #8 into the front cabinet drain hole and secure on the vent – drain elbow barb fitting using a red clamp. 6. Using the two sheet metal screws provided in the cabinet, secure the trap to the furnace. 7. Refer to Field Supplied Drain section for instructions on field supplied / installed drain on outlet of furnace trap.

21

Counterflow Model Installed Horizontally with Left Side Down * Also see Front Cover Pressure Switch Tube Location on page 10. Minimum 5 ½” clearance is required for the drain trap beneath the furnace.
Hose #4

14. Connect the 4″ straight section of hose #4 to the 100º elbow and the PVC pipe and secure with red clamps.
15. Connect the hoses to the trap inlets and secure
with silver clamps, drain trap outlet must point to the
original bottom of the furnace. 16. Using the two sheet metal screws provided in the
cabinet, secure the trap to the furnace. 17. Refer to Field Supplied Drain section for instructions
on field supplied / installed drain on outlet of furnace trap.

CAUTION
To prevent unreliable operation or equipment damage, the inlet gas supply pressure must be as specified on the unit rating plate with all other household gas fired appliances operating.

Hose #4 Hose #5

Hose #2

Figure 32
1. Remove the factory installed drain trap and hose assemblies. Leave the 100° elbow inserted and clamped in the vent-drain elbow.
2. Remove two 1″plugs from left side of cabinet 3. Drain the Collector Box. Remove the cap from the
left side of the collector box drain port (bottom in horizontal left position) and install it on right side drain
port.
4. Place radius end of hose #4 (factory installed) on the collector box drain port and secure with a silver clamp.
5. Insert hose #2 from outside the cabinet in the front drain hole.
6. Connect hose #4 & hose #2 together using a straight barbed coupling and two gold clamps (factory installed).
7. (Draining the Vent Elbow) Remove rubber plug from vent ­ drain elbow side port.
8. The un-used vent-drain elbow drip leg port must be plugged to prevent flue gases from escaping. Insert rubber plug removed in step 7 into the 100° elbow. (Inserting a blunt tool such as a 3/16″ Allen wrench into the center of the rubber plug will stretch the plug and allow complete insertion).
9. Place radius end of hose #4 on the side port of vent ­ drain elbow and secure with a gold clamp.
10. Insert a ½” diameter PVC pipe (factory installed) into hose #4 and secure with a gold clamp.
11. Insert the non-grommet end of hose #5 (factory installed) from outside the cabinet in the back drain hole.
12. Insert 100º elbow in hose #5 and secure with a red clamp.
13. Locate hose #4 and cut a cut off a 4″ straight section and discard the radius end.

INLET GAS SUPPLY PRESSURE Natural Gas Minimum: 4.5″ w.c. Maximum: 10.0″ w.c. Propane Gas Minimum: 11.0″ w.c. Maximum: 13.0″ w.c.

GAS SUPPLY AND PIPING
The furnace rating plate includes the approved furnace gas input rating and gas types. The furnace must be equipped to operate on the type of gas applied. This includes any conversion kits required for alternate fuels and/or high altitude.
Inlet gas supply pressures must be maintained within the ranges specified in the following table. The supply pressure must be constant and available with all other household gas fired appliances operating. The minimum gas supply pressure must be maintained to prevent unreliable ignition. The maximum must not be exceeded to prevent unit overfiring.
PROPANE GAS/HIGH ALTITUDE INSTALLATIONS

Gas Altitude Kit

Orifice

Manifold Pressure

High Stage

Low Stage

Pressure Switch Change

Natural Propane

None 0-7000 LPM-08*1

45 1.25mm

3.5″ w.c. 1.9″ w.c. 10.0″ w.c. 6.0″ w.c.

None None

1 LPM-08* supports both Honeywell and White-Rodgers 2-stage valves NOTE: In Canada, gas furnaces are only certified to 4500 feet.

This furnace is shipped from the factory configured for natural gas at standard altitude. Propane gas installations
require an orifice change to compensate for the energy content difference between natural and propane gas.

22

For furnaces being converted to LP gas, it is strongly recommended that a LPLP03 kit also be installed. The use of this kit will prevent the furnace from firing when the LP gas supply pressure is too low to support proper combustion.
High altitude installations may require both a pressure switch and an orifice/spring change. These changes are necessary to compensate for the natural reduction in the density of both the gas fuel and the combustion air at higher altitude.
For installations above 7000 feet, please refer to the furnace Specification Sheets for required kit(s).
High altitude kits are purchased according to the installation altitude and usage of either natural or propane gas. The indicated kits must be used to insure safe and proper furnace operation. All conversions must be performed by a qualified installer, or service agency.
The high altitude, kit will provide the proper design certified input rate within the specified altitude range.
Do not derate the furnace by adjusting the manifold pressure to a lower pressure than specified on the furnace rating plate. The combination of the lower air density and a lower manifold pressure will prohibit the burner orifice from drawing the proper amount of air into the burner. This may cause incomplete combustion, flashback, and possible yellow tipping.
In some areas the gas supplier may artificially derate the gas in an effort to compensate for the effects of altitude. If the gas is artificially derated, the appropriate orifice size must be determined based upon the BTU/ft3 content of the derated gas and the altitude. Refer to the National Fuel Gas Code, NFPA 54/ANSI Z223.1 or CAN/CSA B149.1-15 in Canada, and information provided by the gas supplier to determine the proper orifice size.

Gas Valve This unit is equipped with a 24 volt gas valve controlled during furnace operation by the integrated control module. As shipped, the valve is configured for natural gas. The valve is field convertible for use with propane gas by replacing the regulator spring with a propane gas spring from an appropriate manufacturer’s propane gas conversion kit. Taps for measuring the gas supply pressure and manifold pressure are provided on the valve.
The gas valve has a manual ON/OFF control located on the valve itself. This control may be set only to the “ON” or “OFF” position. Refer to the lighting instructions label or Startup Procedure & Adjustment for use of this control during start up and shut down periods.

WARNING
To avoid possible unsatisfactory operation of equipment damage due to underfiring or equipment, use the proper size of natural/propane gas piping needed when running pipe from the meter/tank to the furnace.

Gas Piping Connections

Natural Gas Capacity of Pipe

In Cubic Feet of Gas Per Hour (CFH)

Length of

Pipe in Feet

½”

Nominal Black Pipe Size

¾”

1″

1¼”

1 ½”

10

132

278

520

1050

1600

20

92

190

350

730

1100

30

73

152

285

590

980

40

63

130

245

500

760

50

56

115

215

440

670

60

50

105

195

400

610

70

46

96

180

370

560

80

43

90

170

350

530

90

40

84

160

320

490

100

38

79

150

305

460

(Pressure 0.5 psig or less and pressure drop of 0.3″ W.C.; Based on

0.60 Specific gravity Gas)

Propane Gas Conversion
WARNING
Possible property damage, personal injury or death may occur if the correct conversion kits are not installed. The appropriate kits must be applied to ensure safe and proper furnace operation. All conversions must be performed by a qualified installer or service agency.

CFH = BTUH Furnace Input ____ Heating Value of Gas (BTU/Cubic Foot)
The gas piping supplying the furnace must be properly sized based on the gas flow required, specific gravity of the gas, and length of the run. The gas line installation must comply with local codes, or in their absence, with the latest edition of the National Fuel Gas Code, NFPA 54/ANSI Z223.1 or CAN/CSA B149.1-15.

This unit is configured for natural gas. The appropriate manufacturer’s propane gas conversion kit, must be applied for propane gas installations. Refer to the Propane Gas and/or High Altitude Installations for details.
Consult the furnace Specification Sheet for a listing of appropriate kits. The indicated kits must be used to insure safe and proper furnace operation. All conversions must be performed by a qualified installer, or service agency.

To connect the furnace to the building’s gas piping, the installer must supply a ground joint union, drip leg, manual shutoff valve, and line and fittings to connect to gas valve. In some cases, the installer may also need to supply a transition piece from 1/2″ pipe to a larger pipe size.
The following stipulations apply when connecting gas piping. Refer to Gas Piping Connections figure for typical gas line connections to the furnace.

23

· Gas piping must be supported external to the furnace cabinet so that the weight of the gas line does not distort the burner rack, manifold or gas valve.
· Use black iron or steel pipe and fittings for building piping. Where possible, use new pipe that is properly chamfered, reamed, and free of burrs and chips. If old pipe is used, be sure it is clean and free of rust, scale, burrs, chips, and old pipe joint compound.
· Use pipe joint compound on male threads ONLY. Always use pipe joint compound (pipe dope) that
is APPROVED FOR ALL GASES. DO NOT apply
compound to the first two threads. · Use ground joint unions. · Install a drip leg to trap dirt and moisture before it can
enter the gas valve. The drip leg must be a minimum of three inches long.
· Install a 1/8″ NPT pipe plug fitting, accessible for test gage connection, immediately upstream of the gas
supply connection to the furnace.
· Always use a back-up wrench when making the connection to the gas valve to keep it from turning.
The orientation of the gas valve on the manifold must
be maintained as shipped from the factory. Maximum torque for the gas valve connection is 375 in-lbs; excessive over-tightening may damage the gas valve.
· Install a manual shutoff valve between the gas meter and unit within six feet of the unit. If a union
is installed, the union must be downstream of the manual shutoff valve, between the shutoff valve and the furnace.
· Tighten all joints securely.
· Connection method must be in compliance with all local and national codes. US: National Fuel Gas Code (NFGC) NFPA 54-2015 / ANSI Z223.1-2015 and the
Installation Standards, Warm Air Heating and Air
Conditioning Systems ANSI / NFPA 90B
In Canada, CANADA: National Standard of Canada, Natural Gas and Propane Installation Code
(NSCNGPIC) CAN/CSA B149.1-15
· Connect the furnace to the building piping by one of the following methods: ­ Rigid metallic pipe and fittings. ­ Semi-rigid metallic tubing and metallic fittings. Aluminum alloy tubing must not be used in exterior locations. In order to seal the grommet cabinet penetration, rigid pipe must be used to reach the outside of the cabinet. A semi-rigid connector to the gas piping may be used from there.
· Use listed gas appliance connectors in accordance with their instructions. Connectors must be fully in the same room as the furnace.
· Protect connectors and semirigid tubing against physical and thermal damage when installed. Ensure
aluminum-alloy tubing and connectors are coated to protect against external corrosion when in contact
with masonry, plaster, or insulation, or subjected to repeated wetting by liquids such as water (except rain water), detergents, or sewage.

The gas piping may enter the left or right side of the
furnace cabinet. The installer must supply rigid pipe long enough to reach the outside of the cabinet to seal the grommet cabinet penetration. A semi-rigid connector to the gas piping can be used outside the cabinet per local codes. 1/2″ NPT pipe and fittings are required. For models with an “L” shaped manifold, a 4 1/2″ long nipple is required. For models with a hook shaped manifold, a 2″ long nipple is required.

A semi-rigid connector to the gas piping can be used outside the cabinet per local codes. From the elbow, the length of pipe and the fittings required will vary by the side chosen, location of union and cabinet width. The union may be placed inside or outside of the cabinet.

Alternate Gas Line Location

Manifold

Burners

Manual Shut Off Valve (upstream from ground joint
pipe union)

Gas Valve
*Ground Joint Pipe Union

*Ground Joint Pipe Union
Drip Leg
Grommet in Standard Gas Line Hole

*NOTE: Union may be inside furnace cabinet where allowed by local codes.
Figure 33
Manual Shut Off Valve (upstream from ground joint pipe union)
Alternate Gas Line Location

*Ground Joint
Pipe Union
Grommet in Standard
Gas Line Hole
Drip Leg

*Ground Joint Pipe Union
Plug in Alternate Gas Line Hole
Gas Valve

Burners
*NOTE: Union may be inside furnace cabinet where allowed b y local codes.
Figure 34

24

Alternate Union Location
Grommet in Standard Gas Line Hole
Burners

Manual Shut Off Valve (upstream from ground joint pipe union)
Drip Leg Plug in Alternate Gas Line Hole

Manifold

Gas Valve

Plug in Main Gas Line Hole

Drain Trap

Figure 35

Manual Shut Off Valve (upstream from ground joint pipe union)

Disconnect this unit and shutoff valve from the gas supply piping system before pressure testing the supply piping system with pressures in excess of 1/2 psig (3.48 kPa).
Isolate this unit from the gas supply piping system by closing its external manual gas shutoff valve before pressure testing supply piping system with test pressures equal to or less than 1/2 psig (3.48 kPA).
Propane Gas Tanks and Piping
WARNING
If the gas furnace is installed in a basement, an excavated area or confined space, it is strongly recommended to contact a propane supplier to install a gas detecting warning device in case of a gas leak.
· Since propane gas is heavier than air, any leaking gas can settle in any low areas or confined spaces.
· Propane gas odorant may fade, making gas undetectable except with a warning device.

First Stage Regulator

5 to 15 PSIG (20 PSIG Max.)

Continuous 11″ W.C.

200 PSIG Maximum

Second Stage Regulator

Propane Gas Installation (Typ.) Figure 37

Figure 36

A gas detecting warning system is the only reliable way to detect a propane gas leak. Rust can reduce the level of
odorant in propane gas. Do not rely on your sense of smell.
Contact a local propane gas supplier about installing a gas detecting warning system. If the presence of gas is suspected, follow the instructions listed in the Safety Considerations section of this manual.

Gas Piping Checks

CAUTION

All propane gas equipment must conform to the safety
standards of the National Board of Fire Underwriters, NBFU Manual 58.

To avoid the possibility of explosion or fire, never use a match or open flame to test for leaks.

CANADA: National Standard of Canada, Natural Gas and Propane Installation Code (NSCNGPIC) CAN/CSA B149.1-
15.

Before placing unit in operation, leak test the unit and gas connections.

For satisfactory operation, propane gas pressure must be 10″ WC at the furnace manifold with all gas appliances in

Check for leaks using an approved chloride-free soap and
water solution, an electronic combustible gas detector, or other approved testing methods.

operation. Maintaining proper gas pressure depends on three main factors:
1. Vaporization rate, depending on temperature of the liquid, and “wetted surface” area of the container or

NOTE: Never exceed specified pressures for testing. Higher pressure may damage the gas valve and cause subsequent overfiring, resulting in heat

containers. 2. Proper pressure regulation (Two-stage regulation is
recommended for both cost and efficiency).

exchanger failure.

25

3. Pressure drop in lines between regulators, and between second stage regulator and the appliance. Pipe size will depend on length of pipe run and total load of all appliances.
Complete information regarding tank sizing for vaporization, recommended regulator settings, and pipe sizing is available from most regulator manufacturers and propane gas suppliers.

plate from the end on the coil; drilling a test hole in it and reinstalling the block off plate. Take a duct static reading at the test hole. Tape up the test hole after your test is complete. The negative pressure must be read between the filter and the furnace blower.
Too much external static pressure will result in insufficient air that can cause excessive temperature rise. This can cause limit switch tripping and heat exchanger failure.

Always use a pipe thread sealant approved for all gases.
DUCT WORK
Duct systems and register sizes must be properly designed for the CFM and external static pressure rating of the furnace. Design the ductwork in accordance with the recommended methods of “Air Conditioning Contractors of America” Manual D.
Install the duct system in accordance with Standards of the National Board of Fire Underwriters for the Installation of Air Conditioning, Warm Air Heating and Ventilating Systems. Pamphlets No. 90A and 90B.

To determine total external duct static pressure, proceed as follows:
1. With clean filters in the furnace, use a manometer to measure the static pressure of the return duct at the inlet of the furnace. (Negative Pressure)
2. Measure the static pressure of the supply duct. (Positive Pressure)
3. The difference between the two numbers is .4″ w.c.

For example:

Difference is .4

A closed return duct system must be used, with the return duct connected to the furnace. NOTE: Ductwork must never be attached to the back of the furnace. For upflow installations requiring 1800 CFM or more, use either two side returns or bottom return or a combination of side / bottom. Flexible joints may be used for supply and return connections to reduce noise transmission. To prevent the blower from interfering with combustion air or draft when a central return is used, a connecting duct must be installed between the unit and the utility room wall. Never use a room, closet, or alcove as a return air chamber.
When furnace duct(s) supply air outside the space containing the furnace, a return air duct must terminate in the same space as the supply duct and be sealed to the furnace casing.
Checking Duct Static
WARNING

-.1

..0

.1

.2

.3

Static reading from return duct = -.1″ w.c. Static reading from supply duct = .3″ w.c. Total external static pressure on this system =.4″ w.c.

NOTE: Both readings may be taken simultaneously and read directly on the manometer if so desired. If an air conditioner coil or Electronic Air Cleaner is used in conjunction with the furnace, the readings must also include theses components, as shown in the following drawing.

4. Consult the proper tables for the quantity of air.

If the total external static pressure exceeds the maximum listed on the furnace rating plate, check for closed dampers, registers, undersized and/or oversized poorly laid out duct work.

Never allow the products of combustion, including carbon monoxide, to enter the return duct work or circulation air supply.
Refer to your furnace rating plate for the maximum ESP (external duct static) rating.
Total external static refers to everything external to the furnace cabinet. Cooling coils, filters, ducts, grilles, registers must all be considered when reading your total external static pressure. The supply duct pressure must be read between the furnace and the cooling coil. This reading is usually taken by removing the “A” shaped block off

NOTE: The temperature rise of the furnace must be within the temperature rise range listed on the furnace rating plate.
Bottom Return Air Opening [Upflow Models] The bottom return air opening on upflow models utilizes a “lance and cut” method to remove sheet metal from the duct opening in the base pan. To remove, simply press out the lanced sections by hand to expose the metal strips retaining the sheet metal over the duct opening. Using tin snips, cut the metal strips and remove the sheet metal covering the duct opening. In the corners of the opening,

26

cut the sheet metal along the scribe lines to free the duct flanges. Using the scribe line along the duct flange as a guide, unfold the duct flanges around the perimeter of the opening using a pair of seamer pliers or seamer tongs.
NOTE: Airflow area will be reduced by approximately 18% if duct flanges are left in factory position. This could cause performance issues and noise issues.

When the furnace is heating, the temperature of the return air entering the furnace must be between 55°F and 100°F.
Filters – Read This Section Before Installing The Return Air Duct
CUT USING TIN SNIPS

SUPPLY AIR

CUTAWAY OF DUCTWORK TO EXPOSE COIL

DIGITAL MANOMETER

.

RETURN

Mode

AIR

Dual Flange Cut Outs Figure 39

SCRIBE LINES OUTLINING DUCT FLANGES

Filters must be used with this furnace. Discuss filter maintenance with the building owner. Filters do not ship with this furnace, but must be provided, sized and installed externally by the installer. Filters must comply with UL900 or CAN/ULCS111 standards. Damage or repairs due to the installation of the furnace without filters is not covered under the warranty.

Figure 38
When the furnace is used in connection with a cooling unit, the furnace should be installed in parallel with or on the upstream side of the cooling unit to avoid condensation in the heating element. With a parallel flow arrangement, the dampers or other means used to control the flow of air must be adequate to prevent chilled air from entering the furnace and, if manually operated, must be equipped with means to prevent operation of either unit unless the damper is in the full heat or cool position.
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a precaution when removing sheet metal from return air openings.
When the furnace is installed without a cooling coil, it is recommended that a removable access panel be provided in the outlet air duct. This opening shall be accessible when the furnace is installed and shall be of such a size that the heat exchanger can be viewed for visual light inspection or such that a sampling probe can be inserted into the airstream. The access panel must be made to prevent air leaks when the furnace is in operation.

On upflow units, guide dimples locate the side return cutout locations. Use a straight edge to scribe lines connecting the dimples. Cut out the opening on these lines.
NOTE: An undersized opening will cause reduced airflow.
Horizontal Installations Filters must be installed in either the central return register or in the return air duct work.
Upright Installations Depending on the installation and/or customer preference, differing filter arrangements can be applied. Filters can be installed in the central return register or a side panel external filter rack kit (upflows). As an alternative a media air filter or electronic air cleaner can be used as the requested filter. Consider installing an air cleaner with deep-pleated media filter at the time of furnace installation. A deep-pleated filter with a MERV rating of 8 (minimum) will often provide better filtration to protect equipment and the air distribution system than a standard 1″ filter and often has lower static pressure loss than a 1″ filter. Also a deep-pleated filter will typically require less frequent replacement intervals. Avoid using highly restrictive 1″ filters which produce static pressure loss greater than .25″ W.C. In some installations the minimum filter size required will not lend itself to a filter installation on the side of the furnace. The installation of a centrally installed air cleaner cabinet or a return duct filter installation may offer more practicality.

27

Clean ComfortTM brand MERV 11 air cleaners have 5¼” media filters and are available in the following configurations. Consult your distributor for information on our complete line of IAQ Clean ComfortTM products.

Model MVC960403BN MVC960603BN MVC960803BN MVC960804CN MVC961005CN MVC961005DN MVC961205DN

Minimum Recommended Filter Size^ 1 – 16 X 25 Side or Bottom 1 – 16 X 25 Side or Bottom 1 – 16 X 25 Side or Bottom 1 – 16 X 25 Side or Bottom
1 – 20 X 25 Bottom or 2 – 16 X 25 Side Return 1 – 20 X 25 Bottom or 2 – 16 X 25 Side Return 1 – 20 X 25 Bottom or 2 – 16 X 25 Side Return

CVC960403BN

2 – 10 X 20 or 1 – 16 X 25 Top Return

CVC960603BN

2 – 10 X 20 or 1 – 16 X 25 Top Return

CVC960804CN

2 – 10 X 20 or 1 – 16 X 25 Top Return

CVC961005CN

2 – 14 X 20 or 1 – 20 X 25 Top Return

CVC961205DN

2 – 14 X 20 or 1 – 20 X 25 Top Return

^ Larger filters may be used, filters may also be centrally located

Figure 44

The following figures show possible filter locations.

CENTRAL RETURN GRILLE

AIR FLOW

SIDE RETURN EXTERNAL FILTER
RACK KIT (EITHER SIDE)

FILTER FILTER

Possible Upright Upflow Figure 45

Figure 40

Figure 41

FILTER SUPPORT BRACKET
(Field Supplied)

CENTRAL RETURN GRILLE

Figure 42

Figure 43

AIR FLOW Possible Upright Counterflow Filter Locations
Figure 46
28

ELECTRICAL CONNECTIONS
WARNING
High voltage! To avoid the risk of electrical shock, wiring to the unit must be polarized and grounded.
WARNING
High voltage! To avoid personal injury or death due to electrical shock, disconnect electrical power before servicing or changing any electrical wiring.
CAUTION
Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing.
Wiring Harness The wiring harness is an integral part of this furnace. Field alteration to comply with electrical codes should not be required. Wires are color coded for identification purposes. Refer to the wiring diagram for wire routings. If any of the original wire as supplied with the furnace must be replaced, it must be replaced with wiring material having a temperature rating of at least 105°C. Any replacement wiring must be a copper conductor.
115 Volt Line Connections Before proceeding with electrical connections, ensure that the supply voltage, frequency, and phase correspond to that specified on the unit rating plate. Power supply to the furnace must be NEC Class 1, and must comply with all applicable codes. The furnace must be electrically grounded in accordance with local codes or, in their absence, with the latest edition of The National Electric Code, ANSI NFPA 70 and/or The Canadian Electric Code CSA C22.1.
Use a separate fused branch electrical circuit containing properly sized wire, and fuse or circuit breaker. The fuse or circuit breaker must be sized in accordance with the maximum overcurrent protection specified on the unit rating plate. An electrical disconnect must be provided at the furnace location.
Connect hot, neutral, and ground wires as shown in the wiring diagram located on the unit’s blower door. Metal conduit is not considered a substitute for an actual ground wire to the unit.

Line polarity must be observed when making field connections. Line voltage connections can be made through either the right or left side panel. The furnace is shipped configured for a right side electrical connection with the junction box located inside the burner compartment (blower compartment for downflows). To make electrical connections through the opposite side of the furnace, the junction box must be relocated to the other side of the burner (or blower) compartment prior to making electrical connections. To relocate the junction box, follow the steps shown below.
NOTE: Wire routing must not to interfere with circulator blower operation, filter removal, or routine maintenance.
Junction Box Relocation
WARNING
Edges of sheet metal holes may be sharp. Use gloves as a precaution when removing hole plugs.
WARNING
To prevent personal injury or death due to electric shock, disconnect electrical power before installing or servicing this unit.
Line voltage connections can be made through either the right or left side panel. The furnace is shipped configured for a left side electrical connection. To make electrical connections through the opposite side of the furnace, the junction box must be relocated to the right side prior to making electrical connections. To relocate the junction box, perform the following steps.
1. Remove the burner compartment door. 2. Remove and save the two screws securing the
junction box to the side panel. 3. Remove and save the two screws securing the
junction box to the side panel. 4. Relocate junction box and associated plugs and
grommets to opposite side panel. Secure with screws removed in step 2.
To ensure proper unit grounding, the ground wire should run from the furnace ground screw located inside the furnace junction box all the way back to the electrical panel. NOTE: Do not use gas piping as an electrical ground. To confirm proper unit grounding, turn off the electrical power and perform the following check.
1. Measure resistance between the neutral (white) connection and one of the burners.
2. Resistance should measure 10 ohms or less.
This furnace is equipped with a blower door interlock switch which interrupts unit voltage when the blower door is opened for servicing. Do not defeat this switch.

29

CoolCloudTM HVAC Phone Application Actual screens may look different based on the mobile device being used.
Figure 47
Figure 48
Figure 49
This furnace is Bluetooth ready and functions with the CoolCloud HVAC phone application designed to improve the contractor’s setup / diagnostic experience. Users can see specific model information, review active diagnostic

error codes, observe system status during operation, make system menu adjustments, add site visit notes and
run system testing of all operational modes (heat / cool /
fan) directly from the phone. The phone application is also
capable of directly updating the furnace software anytime updates are available. The application will automatically notify the user if updates are available.

NOTE: The software update may take up to 20 minutes to complete.

Quick Start Guide For Communicating Outdoor Units EXTREMELY IMPORTANT: For all cooling calls the system only requires a single Y input from the thermostat. For all
heating calls (including dual fuel applications) the system
only requires a single W input from the thermostat. Internal
algorithms will control all available cooling and heating stages including dual fuel operation based on these inputs. Any single-stage 24VAC thermostat can be used. For proper operation the thermostat must be setup to control a single-stage AC outdoor unit and to control a single stage
gas furnace. The control board does not accommodate an O wire thermostat input (reversing valve signal). If a heat
pump is installed, the thermostat should be setup as stated above. Setting the thermostat for the heat pump control or multi stage control may result in incorrect performance.
1. Connect all necessary thermostat wires to the
thermostat connector on the furnace control as
instructed by the applicable wiring diagrams shown in this section.
2. Connect the 1 & 2 wires between the indoor and outdoor unit for communicating operation.
NOTE: Verify two stage outdoor units include a 24 VAC transformer (for outdoor control board power) Two stage outdoor units may not behave properly without this 24 VAC transformer.

INDOOR BOARD TERMINAL
CONNECTIONS
1 2

OUTDOOR BOARD TERMINAL
CONNECTIONS

1

2

OUTDOOR TRANSFORMER

C

C

R

R

C

Optional

C

G

Optional

G

Y

Y

Optional if feature
supported by thermostat
Communicating Two Stage Air Conditioner or Heat Pump Figure 50

30

INDOOR BOARD TERMINAL
CONNECTIONS
1 2

OUTDOOR BOARD TERMINAL
CONNECTIONS
1 2

2. Two-stage outdoor units using the CoolCloud HVAC application: a. Charge the outdoor unit as required using the
charging information provided with the outdoor
equipment.

C

C

24 VAC

Thermostat

R

R

C

Optional

C

G

Optional

G

Y

Y

Optional
Communicating Inverter Air Conditioner or Heat Pump Figure 51

3. Download the CoolCloud HVAC phone application for charging and to configure/test system operations.
4. Confirm thermostat heating and cooling calls function properly with equipment.

NOTE: When new versions of Bluetooth Communication Software and Furnace Control Software are available, the phone application notifies the user. Software updates are classified as either optional or mandatory and installed by using the phone application. Ensure all mandatory software updates have been installed. Review notes for optional software updates and install if necessary.
NOTE: If an E11 code exists for the inverter system immediately after line voltage is applied (code shown in the CoolCloud HVAC phone application or displayed on the inverter control), the System Verification Test needs to be completed before any other operation. See the following procedure.
1. Allow the system to remain Idle for 5 minutes. 2. Turn the system verification test on either by using
the phone application, or by entering the SUt menu through the furnace push buttons. 3. Wait for the test to complete.

Charging 1. Inverter units using the CoolCloud HVAC phone application or control board push button: a. Inverter units are charged by setting the CR9 menu (Charge Mode) to ON through
the furnace control board push buttons or through the CoolCloud HVAC phone application.
b. The System will remain in charge mode (high speed) for 60 minutes before timing out.
c. The installer must manually shut off charge mode once complete.

Gas Furnace Testing 1. Two-stage Operation using the CoolCloud HVAC application: a. Select the gas heat icon after entering the furnace menus. b. Select any value less than 50% for low stage operation and any value greater than 50% for high stage operation.
Quick Start Guide For Non-Communicating Outdoor Units EXTREMELY IMPORTANT: For two-stage gas heating, the system only needs a single W input. Internal algorithms will control staging of the gas furnace automatically based on the single W input. For non-communicating outdoor unit wiring see instructions below.
1. Use the wiring diagrams below to connect low voltage thermostat wires.
NOTE: When installing the furnace with a non communicating heat pump wire directly from the “O” terminal on the thermostat to the reversing valve “O” terminal on the non communicating heat pump. See Figure 53 for single stage and Figure 54 for the two stage diagrams.
INDOOR BOARD TERMINAL
CONNECTIONS
1
2

C
24 VAC Thermostat

R

R

C

Optional

C

G

Optional

G

Y

Y

Remote Condensing Unit (Single-Stage Cooling)
C Y

Optional
Non-communicating Single Stage A/C Figure 52

31

INDOOR BOARD TERMINAL
CONNECTIONS
1 2

C
24 VAC Thermostat

R

R

C

Optional

C

G

Optional

G

Y

Y

Remote Condensing Unit (Two-Stage Cooling)
C Y
Y2

Non-communicating Two Stage A/C Figure 53
INDOOR BOARD TERMINAL
CONNECTIONS
1 2

C
24 VAC Thermostat

R

R

C

Optional

C

G

Optional

G

Y

Y

Optional

Heat Pump
R C
Y

Non-Communicating Single Stage Heat Pump Figure 54
INDOOR BOARD TERMINAL
CONNECTIONS
1 2

C
24 VAC Thermostat

R

R

C

Optional

C

G

Optional

G

Y

Y

Y2

Two Stage Heat Pump
R C
Y
Y2

Non-Communicating Two Stage Heat Pump Figure 55

2. Download the CoolCloud HVAC phone application. NOTE: When new versions of Bluetooth Communication Software and Furnace Control Software are available, the phone application notifies the user. Software updates are classified as either optional or mandatory and installed by using the phone application. Ensure all mandatory software updates have been installed. Review notes for optional software updates and install if necessary.
3. Select the Non-Comm Outdoor Setting menu (OdS) using the on board push buttons or the CoolCloud HVAC phone application. Select 1 AC for single stage Air Conditioners, 1HP for single stage heat pumps, 2 AC for two stage air conditioners and 2 HP for two stage Heat Pumps.
4. Go to the tonnage units menu (ton) and select the tonnage value that corresponds to the desired airflow for the outdoor unit. See the following table.

32

NOTE: The arrow next to the display windows refers to the correct orientation for reading characters on the display.

6. Confirm thermostat heating and cooling calls function properly with equipment.

Quick Start Guide for Gas Heat Only Setup (No Outdoor Unit) EXTREMELY IMPORTANT: The furnace only requires a single W input for 2 stage gas heat control. Internal algorithms will control staging of the gas furnace automatically.
1. Connect all necessary thermostat wires to the
thermostat connector on the furnace control as shown
in the following diagram.

24 VAC Thermostat

Indoor Board Terminal
Connections

NOTE: For two stage non-communicating outdoor units, system will stage airflow automatically for low stage operation.

Tonnage Selection
1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1 2.2

Airflow
400 440 480 520 560 600 640 680 720 760 800 840 880

Tonnage Selection
2.3 2.4 2.5 2.6 2.7 2.8 2.9 3 3.1 3.2 3.3 3.4 3.5

Airflow
920 960 1000 1040 1080 1120 1160 1200 1240 1280 1320 1360 1400

Tonnage Selection
3.6 3.7 3.8 3.9 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8

Airflow
1440 1480 1520 1560 1600 1640 1680 1720 1760 1800 1840 1880 1920

Tonnage Selection
4.9 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 6

Airflow
1960 2000 2040 2080 2120 2160 2200 2240 2280 2320 2360 2400

R

R

C

C

Optional

G

G

Optional

W

W

Dehum

DH/Y2

NOTE: The system will not provide airflows above the Max Airflow Value.
3 Ton Models = 1,400 CFM 4 Ton Models = 1,760 CFM 5 Ton Models = 2,200 CFM
5. Use the CoolCloud HVAC phone application to configure/test furnace operations.
NOTE: The phone application cannot test a noncommunicating outdoor unit. The thermostat will be required for outdoor unit testing.
Gas Furnace Testing a. Two stage operation using the CoolCloud HVAC application: a. Select the gas heat icon after entering the furnace menus. b. Select any value less than 50% for low stage operation and any value greater than 50% for high stage operation.

Gas Heat Only Figure 56
2. Download the CoolCloud HVAC phone application and use it to configure/test furnace operations.
NOTE: When new versions of Bluetooth Communication Software and Furnace Control Software are available, the phone application notifies the user. Software updates are classified as either optional or mandatory and installed by using the phone application. Ensure all mandatory software updates have been installed. Review notes for optional software updates and install if necessary.
Gas Furnace Testing a. Two-stage Operation using the CoolCloud HVAC application: a. Select the gas heat icon after entering the furnace menus. b. Select any value less than 50% for low stage operation and any value greater than 50% for high stage operation.

33

3. Confirm thermostat heating call functions properly with equipment.
Dehumidification Dehumidification allows the furnace’s circulator blower to operate at a reduced speed during a combined thermostat call for cooling demand with a parallel humidistat. This lower blower speed increases dehumidification of the conditioned air as it passes through the indoor coil. The control board is equipped with a 24 volt dehumidification input (DH) located on the thermostat wiring connector. The terminal can be configured to enable dehumidification when the input is energized or de-energized. When using an external dehumidistat, connect it between the R and DH terminals. If the humidistat closes on humidity rise or the thermostat energizes this terminal when dehumidification is required, set the control board “dHL” (Dehum Logic) menu setting to “HI” using the push buttons or CoolCloud HVAC phone application. If the humidistat opens on humidity rise or the thermostat de- energizes this terminal when dehumidification is required, set the “dHL” (Dehum Logic) menu to “Lo” using the push buttons or CoolCloud HVAC phone application.
Auxiliary Alarm Switch The control is equipped with a 24VAC Aux Alarm to be used for a condensate switch install (designated by CONDENSATE IN/OUT on the control). By default, the connected AUX switch is normally closed and opens when the water level in the evaporator coil base pan reaches an undesirable level. The control responds by displaying an f error code and turning off the outdoor condensing unit. If the AUX switch is detected to be in the closed position for 30 seconds, normal operation resumes and the error message is no longer displayed.

The furnace includes three on-board push buttons allowing users to navigate indoor and outdoor system menus. The Right and Left buttons allow the user to scroll through the main menus and to then scroll through available options within specific menus. The Center button is used to enter into a main menu and to then permanently select options within those menus.
NOTE: After scrolling to the desired option within a menu, that option may be flashing on the 7-segment displays. This indicates the option has not been officially selected. Pressing the Center button two times will select that option. The first press will stop the flashing. The second will make the selection official and return you to the main menu.
ACCESSORIES
Optional Field installed Supply Air & Return Air Temperature Sensors
Optional Supply Air Sensor 0130F00933 & Return Air Sensor 0130F00934 are available for purchase from your distributor.

Control Board

Connection location for RA sensor Connection location for SA sensor

Push Button Menu

LEFT

CENTER
Figure 57

RIGHT

Accessory Control (Ventilators)
If an external humidifier, dehumidifier or ventilator is installed, it may require airflow from the HVAC system to function accordingly.
1. Make sure the installed 24VAC thermostat is capable of controlling the accessory or accessories.
2. Connect the appropriate accessory control wires to the accessory devices from the thermostat (See thermostat manual for connection and setup instructions).
3. If the thermostat is capable of providing a continuous fan call (G signal) during accessory operation: Make sure to connect the thermostat G terminal to the G terminal on the indoor unit. Setup thermostat to ensure G signal is energized during accessory operation.

34

· Profile B (2) ramps up to full cooling demand airflow by first stepping up to 50% of the full demand for 30 seconds. The motor then ramps to 100% of the
required airflow. A one (1) minute OFF delay at 100% of the cooling airflow is provided.

OFF

50% CFM 1/2 min

100% CFM

100% CFM 1 min

OFF

Figure 58
4. Select the appropriate fan only airflow for the accessory using the indoor unit push button menus or the CoolCloud HVAC phone application.
5. Using the thermostat, independently test each accessory in addition to independently testing continuous fan mode.

Figure 60
· Profile C (3) ramps up to 85% of the full cooling demand airflow and operates there for approximately 7 1/2 minutes. The motor then steps up to the full demand airflow. Profile C also has a one (1) minute 100% OFF delay.

OFF

100% CFM

OFF

Optional Low Voltage Humidifier Connection Furnaces produced mid 2019 and later will have a 4″ brown wire on the low fire pressure switch for 24 volt humidifier connection. To connect a 24 volt humidifier:
· Turn off power to the furnace · Strip insulation from the end of the 4″ brown wire. · Refer to connection diagram below and follow
humidifier manufacturer instructions.

Figure 61
· Profile D (4) ramps up to 50% of the demand for 1/2 minute, then ramps to 85% of the full cooling demand airflow and operates there for approximately 7 1/2 minutes. The motor then steps up to the full demand airflow. Profile D has a 1/2 minute at 50% airflow OFF delay.

OFF

OFF

Ramping Profiles The variable-speed circulator offers four different ramping profiles. These profiles may be used to enhance cooling performance and increase comfort level. Select ramping profiles on the user menu.
· Profile A (1) provides only an OFF delay of one (1) minute at 100% of the cooling demand airflow.

OFF

100% CFM

100% CFM

Figure 59

1 min

OFF

Figure 62
115 Volt Line Connection or Electronic Air Cleaner
WARNING
High voltage! To avoid personal injury or death due to electrical shock, disconnect electrical power before servicing or changing any electrical wiring.

The accessory load specifications are as follows:

EAC

1.0 AMP maximum at 120 VAC

The furnace integrated control module is equipped with a line voltage accessory terminal for controlling power to an optional field supplied electronic air cleaner or any device required to operate in parallel with a circulating fan demand.

35

To connect an electronic air cleaner using the line voltage EAC terminal:
· Turn OFF power to the furnace before installing any accessories.
· Follow the air cleaner manufacturers’ instructions for locating, mounting, grounding, and controlling accessories. Utilize 1/4″ quick connect terminals to make accessory wiring connections to the furnace integrated control module.
· Connect the hot terminal utilized for accessory operation to the EAC terminal and the neutral side of power to NEUTRAL bus on the integrated furnace control or the neutral connection in the furnace junction box.
· All field wiring must conform to applicable codes. · If it is necessary for the installer to supply additional
line voltage wiring to the inside of the furnace, the wiring must conform to all local codes, and have a minimum temperature rating of 105°C. · All line voltage wire splices must be made inside the furnace junction box.
STARTUP PROCEDURE & ADJUSTMENT
Furnace must have a 115 VAC power supply properly connected and grounded. Proper polarity must be maintained for correct operation. In addition to the following start-up and adjustment items, refer to further information in Operational Checks section.
Furnace Cabinet Check that all furnace cabinet sealing components are in place (plugs, grommets, gaskets). NOTE: If the furnace bottom panel has not been removed for a return duct connection, all perforations must be sealed with duct sealant compound or other suitable method to prevent air leakage. For optimal performance verify that all door gaskets are properly in place and replace as needed to prevent air leakage.
Drain Trap Priming The drain trap MUST be primed prior to furnace startup. To prime, fill both sides of the drain trap with water. This ensures proper furnace drainage upon startup and prohibits the possibility of flue gases escaping through the drain system.

Furnace Startup 1. Close the manual gas shutoff valve external to the furnace. 2. Turn off the electrical power to the furnace. 3. Set the room thermostat to the lowest possible setting. 4. Remove the burner compartment door.
NOTE: This furnace is equipped with an ignition device which automatically lights the burner. Do not try to light the burner by hand.
5. Move the furnace gas valve manual control to the OFF position.
6. Wait five minutes then smell for gas. Be sure check near the floor as some types of gas are heavier than air.
7. If you smell gas after five minutes, immediately follow the safety instructions in the Safety Considerations on page 3 of this manual. If you do not smell gas after five minutes, move the furnace gas valve manual control to the ON position.
8. Replace the burner compartment door. 9. Open the manual gas shutoff valve external to the
furnace. 10. Turn on the electrical power to the furnace. 11. Adjust the thermostat to a setting above room
temperature. 12. After the burners are lit, set the thermostat to desired
temperature.
Furnace Shutdown Set the thermostat to the lowest setting. The integrated control will close the gas valve and extinguish flame. Following a 15 second delay, the induced draft blower will be de-energized. After the blower off delay time expires, the blower de-energizes.
13. Remove the burner compartment door and move the furnace gas valve manual control to the OFF position.
14. Close the manual gas shutoff valve external to the furnace.
15. Replace the burner compartment door.
Gas Supply Pressure Measurement

Furnace Operation Purge gas lines of air prior to startup. Be sure not purge
lines into an enclosed burner compartment. Follow NFPA 54, National Fuel Gas Code for proper purging methods.
In Canada, follow approved purging methods in CAN/CSA
B149.1-15.

Check for leaks using an approved chloride-free soap and water solution, an electronic combustible gas detector, or other approved method. Verify that all required kits (propane gas, high altitude, etc.) have been appropriately installed.
36

White-Rodgers Model 36J54 (Two-Stage) Figure 63A

Manometer Hose
3.5
Mode

High Fire Regulator Adjust Regulator Vent

Manometer

High Fire Coil Terminal (HI)

Coaxial Coil Terminal (M)

On/Off Switch

Common

Terminal(C)

White-Rodgers Model 36J54 Connected to Manometer Figure 63B

INLET GAS SUPPLY PRESSURE Natural Gas Minimum: 4.5″ w.c. Maximum: 10.0″ w.c. Propane Gas Minimum: 11.0″ w.c. Maximum: 13.0″ w.c.

CAUTION
To prevent unreliable operation or equipment damage, the inlet gas supply pressure must be as specified on the unit rating plate with all other household gas fired appliances operating.
The line pressure supplied to the gas valve must be within the range specified below. The supply pressure can be measured at the gas valve inlet pressure tap or at a hose fitting installed in the gas piping drip leg. The supply pressure must be measured with the burners operating. To measure the gas supply pressure, use the following procedure.
1. Turn OFF gas to furnace at the manual gas shutoff valve external to the furnace.
2. Connect a calibrated manometer (or appropriate gas pressure gauge) at either the gas valve inlet pressure tap or the gas piping drip leg. See White- Rodgers 36J54 gas valve (Figure 43B) to locate the inlet pressure tap.
NOTE: If using the inlet pressure tap on the WhiteRodgers 36J54 gas valve, then use the 36G/J Valve Pressure Check Kit, Part No. 0151K00000S.
3. Turn ON the gas supply and operate the furnace and all other gas consuming appliances on the same gas supply line.
4. Measure furnace gas supply pressure with burners firing. Supply pressure must be within the range specified in the Inlet Gas Supply Pressure table.

If supply pressure differs from table, make the necessary adjustments to pressure regulator, gas piping size, etc., and/or consult with local gas utility.
5. Turn OFF gas to furnace at the manual shutoff valve and disconnect manometer. Reinstall plug before turning on gas to furnace.
6. Turn OFF any unnecessary gas appliances stated in step three.
Gas Manifold Pressure Measurement and Adjustment
CAUTION
To prevent unreliable operation or equipment damage, the gas manifold pressure must be as specified on the unit rating plate. Only minor adjustments should be made by adjusting the gas valve pressure regulator.
Only small variations in gas pressure should be made by adjusting the gas valve pressure regulator. The manifold pressure must be measured with the burners operating. To measure and adjust the manifold pressure, use the following procedure.
1. Turn OFF gas to furnace at the manual gas shutoff valve external to the furnace.
2. Turn off all electrical power to the system. 3. Outlet pressure tap connections:
White-Rodgers 36J54 valve: Back outlet pressure test screw (inlet/outlet pressure tap) out one turn (counterclockwise, not more than one turn). 4. Attach a hose and manometer to outlet pressure tap . 5. Turn ON the gas supply.
NOTE: Follow this procedure to test the gas valve pressure at 100% firing rate.
Run High Fire NOTE: The Cool Cloud phone application be used to assist with all functional tests. See the quick start guide section for details.
The furnace should be inspected by a qualified installer, or service agency at least once per year. This check should be performed at the beginning of the heating season. This will ensure that all furnace components are in proper working order and that the heating system functions appropriately. Pay particular attention to the following items. Repair or service as necessary.

37

10.0
Mode

Measuring Inlet Gas Pressure (alt. method) Figure 64
NOTE: When converting from natural gas to L.P. consult your distributor for proper conversion kit.

Manifold Gas Pressure

Gas

Range

Natural

Low Stage 1.6 – 2.2″ w .c. High Stage 3.2 – 3.8″ w .c.

Propane

Low Stage 5.7 – 6.3″ w .c. High Stage 9.7 – 10.3″ w .c.

Nom inal 1.9″ w .c. 3.5″ w .c. 6.0″ w .c. 10.0″ w .c.

Gas Input Rate Measurement (Natural Gas Only) The actual gas input rate to the furnace must never be greater than that specified on the unit rating plate. To measure natural gas input using the gas meter, use the
following procedure.
1. Turn OFF the gas supply to all other gas-burning appliances except the furnace.

2. While the furnace is operating at high fire rate, time and record one complete revolution of the gas meter dial, measuring the smallest quantity, usually the dial that indicates 1/2 cu. ft. per revolution. You will use this number to calculate the quantity of gas in cubic ft. if the furnace would consume if it ran steadily for one hour (3600 seconds).
3. If the 1/2 cu. ft. dial was used, multiply your number by two. EXAMPLE: If it takes 23 seconds to complete one revolution of the 1/2 ft. dial (23 x 2 = 46).
This tells us that at this rate, it would take 46 seconds to consume one cu. ft. of gas. 3600 / 46 = 78.
This tells us that in one hour, the furnace would consume 78 cu. ft. of gas. The typical value range for 1 cu. ft. of natural gas is around 1000 BTU. Check with your gas utility, if possible. In this example, the furnace is consuming 78,000 BTUH.
NOTE: The final manifold pressure cannot vary by more than ± 0.3″ w.c. for Natural and + 0.5″ for LP from the specified setting. Consult your local gas supplier if additional input rate adjustment is required.
4. Turn ON gas to and relight all other appliances turned off in step 1. Be certain that all appliances are functioning properly and that all pilot burners are operating.
Temperature Rise Temperature rise must be within the range specified on the unit rating plate. An incorrect temperature rise may result in condensing in or overheating of the heat exchanger. An airflow and temperature rise table is provided in the Specification Sheet applicable to your model. Determine and adjust temperature rise as follows:
1. Operate furnace with burners firing for approximately ten minutes. Ensure all registers are open and all duct dampers are in their final (fully or partially open) position.
2. Place thermometers in the return and supply ducts as close to the furnace as possible. Thermometers must not be influenced by radiant heat by being able to “see” the heat exchanger.
3. Subtract the return air temperature from the supply air temperature to determine the air temperature rise. Allow adequate time for thermometer readings to stabilize.
4. Adjust temperature rise by adjusting the circulator blower speed. Increase blower speed to reduce temperature rise. Decrease blower speed to increase temperature rise. Refer to Startup Procedure and Adjustment – Circulator Blower Speeds for speed changing details.

38

SUPPLY AIR
RETURN AIR
Temperature Rise Measurement Figure 65
Diagnostics Accessing the furnace’s diagnostic menu provides access to the last six faults detected by the furnace. Faults are stored most recent to least recent. Any consecutively repeated fault is stored a maximum of three times.
EXAMPLE: A clogged return air filter causes the furnace limit to trip repeatedly. The control will only store this fault the first three consecutive times the fault occurs.
NOTE: It is highly recommended that the fault history be cleared when performing maintenance or servicing the furnace.
NORMAL SEQUENCE OF OPERATION
Power Up The normal power up sequence is as follows:
· 115 VAC power applied to furnace. · Integrated control module performs internal checks. · Integrated control module monitors safety circuits
continuously. · The furnace enters a three minute power up delay to
make sure the system is setup properly. During this time thermostat calls will not be recognized. · Furnace awaits call from thermostat. 7-segment LED’s display while awaiting call from thermostat.
Heating Mode The normal operational sequence in heating mode is as follows:
· W thermostat contact closes, initiating a call for heat. · Integrated control module performs safety circuit
checks. · Induced draft blower is energized on high speed for a
15-second prepurge.

· Induced draft blower steps to low speed following prepurge. Low stage pressure switch contacts are
closed.
· Igniter warm up begins upon Inducer draft blower step to low speed and presence of closed low stage
pressure switch contacts.
· Gas valve opens at end of igniter warm up period,
delivering gas to burners and establishing flame. · Integrated control module monitors flame presence.
Gas valve will remain open only if flame is detected. · Based on the furnace internal control algorithms the
gas valve and induced draft blower may continue operating on low stage or both will change to high stage. After a power cycle, the first gas heat call will result in high stage operation.
· Circulator blower is energized on heat speed following the selected blower on delay and will begin to ramp up. Electronic air cleaner terminal is energized with
circulator blower. · Furnace is now operating on the specified stage
determined by the internal control algorithm. · Furnace runs, integrated control module monitors
safety circuits continuously.
· If the internal algorithm changes the call from low
heat to high heat, the integrated control module
will immediately switch the induced draft blower, gas valve, and circulator blower to their high stage settings.
· If the internal algorithm changes the call from high
heat to low heat, the control will immediately switch
the induced draft blower and gas valve to their low stage settings. The circulator blower remains on high heating speed for 30 seconds before switching to the low heat circulating speed.
· The W terminal thermostat contacts open, which ends
the call for heat.
· The gas valve closes, extinguishing the flame. · Induced draft blower is de- energized following a 15
second post purge.
· Circulator blower continues running for the selected heat off delay period. The blower speed during this period depends on the last heat call provided by the thermostat. If the last call for heat was a call for low
heat, the air circulator motor will run on low heat
speed for the duration of the heat off delay period. If the last call for heat was a call for high heat, the air
circulating motor will run on low heat speed for the
duration of the heat off delay period. If the last call for heat was a call for high heat, the air circulating
motor will run on the high heating speed for thirty (30)
seconds and then switch to the low heating speed for
the reminder of the heat off delay period. · Circulator blower and electronic air cleaner terminal
are de-energized.
· Circulator blower shuts off after the heat off delay period expires.
· Furnace awaits next call from thermostat.

39

Operational Checks The burner flames should be inspected with the burner compartment door installed. Flames should be stable, quiet, soft, and blue (dust may cause orange tips but they must not be yellow). Flames should extend directly outward from the burners without curling, floating, or lifting off. Flames must not impinge on the sides of the heat exchanger firing tubes.
SAFETY CIRCUIT DESCRIPTION

the induced draft blower and the coil front cover. These switches guard against insufficient airflow (combustion air and flue products) through the heat exchanger and/or blocked condensate drain conditions.
Flame Sensor The flame sensor is a probe mounted to the burner/ manifold assembly which uses the principle of flame rectification to determine the presence or absence of flame.

WARNING
Do not bypass safety devices.

A number of safety circuits are employed to ensure safe and proper furnace operation. These circuits serve to control any potential safety hazards and serve as inputs in the monitoring and diagnosis of abnormal function. These circuits are continuously monitored during furnace operation by the integrated control module.
Integrated Control Module The integrated control module is an electronic device which, if a potential safety concern is detected, will take the necessary precautions and provide diagnostic information through an LED.
Primary Limit The primary limit control is located on the partition panel and monitors heat exchanger compartment temperatures. It is a normally-closed (electrically), automatic reset, temperature-activated sensor. The limit guards against overheating as a result of insufficient conditioned air passing over the heat exchanger.
Auxiliary Limit The auxiliary limit controls are located on or near the circulator blower and monitors blower compartment temperatures. They are a normally-closed (electrically), manual-reset sensors. These limits guard against overheating as a result of insufficient conditioned air passing over the heat exchanger.
Rollout Limit The rollout limit controls are mounted on the burner/ manifold assembly and monitor the burner flame. They are normally-closed (electrically), manual-reset sensors. These limits guard against burner flames not being properly drawn into the heat exchanger.
Pressure Switches The pressure switches are normally-open (closed during operation) negative air pressure-activated switches. They monitor the airflow (combustion air and flue products) through the heat exchanger via pressure taps located on

Burner Flame Figure 65
TROUBLESHOOTING
Electrostatic Discharge (ESD) Precautions NOTE: Discharge body’s static electricity before touching unit. An electrostatic discharge can adversely affect electrical components.
Use the following precautions during furnace installation and servicing to protect the integrated control module from damage. By putting the furnace, the control, and the person at the same electrostatic potential, these steps will help avoid exposing the integrated control module to electrostatic discharge. This procedure is applicable to both installed and uninstalled (ungrounded) furnaces.
1. Disconnect all power to the furnace. Do not touch the integrated control modul

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals