ARMADILLO COMPOSITE DECKING 93312 Mesa Composite Universal Rail
STOP – Must Read Guidelines
Failure to install Armadillo Composite Decking products in accordance with local building codes and the following guidelines will void the product warranty.
Avon Plastics, Inc. Disclaimer: Armadillo deck boards must be supported by a code compliant substructure and CANNOT be installed on top of existing deck boards. All installations are unique and should be reviewed by a licensed architect, engineer or local building official before installation begins. Avon Plastics does not accept liability or responsibility for any improperly installed decks or docks.
The Basics:
- Do NOT use nails with Armadillo Composite Deck boards. Use only approved TurboClip Hidden Deck Fasteners and/or Starborn color matched screws.
- Install Armadillo deck boards with the embossed side up.
- As with all polymer decking products, limiting the amount of build up of dust, dirt, sand, etc. from products such as concrete, masonry products, paver blocks, etc. is essential to protecting the deck surface from unnecessary scratching. Immediate removal of such materials is necessary or risk the potential damage of the deck’s surface. Scratching is not covered by the warranty.
- If this is a new build, a good practice would be to install the deck boards after all other exterior construction activities (roofing, painting, siding etc.) are completed.
- Do Not use the composite deck as a work surface.
- Always check to make sure the factory end cuts are square before installing. There can be some variations.
- Inspect your material before installation. In the unlikely event you receive defective materials, you will save time and money if discovered before installing.
- All composite products will expand and contract with changes in temperature. It is a best practice to avoid butt joints and design and install buffer boards for longer decks reduce the appearance of gapping.
- Low-emissivity (Low-E) glass reflects more sunlight. The extra reflectivity resulting from the concavity in the glass can act like a mirror, concentrating sunlight onto the decking. The result can be an extreme increase in the amount of heat concentrated on areas of the decking surface and potentially cause damage to the board.
- We recommend that all board ends, including ripped/exposed Armadillo board cores, be sealed using Extreme Moisture Repellant End Board Sealer. Sealer helps prevent moisture absorption and should be applied thick enough to exposed area to provide an even coat.
- Variation or changes in board colors does occur. We recommend laying out your deck boards before installation begins.
Job Site Storage and Handling
Armadillo must be stored flat and level. Adjust support blocks accordingly.
- When stacking Armadillo products, supports should start at each end and be spaced 2′ on center. Supports should line up vertically.
- DO NOT stack Armadillo products higher than 6 bundles or 12′ high.
- Cover materials on site until ready for installation.
Tools Required
SAWS:
Miter Saw
Recommend using a carbide-tipped blade with 60 teeth or more
Jig Saw
Recommend using a carbide-tipped blade for making cuts
DRILLS: Install TurboClip Hidden Deck Fasteners with standard power drills, impact drivers or right-angle drills.
OTHER TOOLS: Chalk Line , Tape Measure, Carpenter Square, Level, Spacing Tools, Rubber Mallet
SAFETY ITEMS: Safety Glasses, Ear Protection, Gloves, Dust Mask, Protective Clothing
Deck Framing Guidelines:
- As joists are installed, run string line frequently to ensure that the tops of the joists are in plane, as Armadillo Decking will conform to the contour of the joists to which it is attached. It may be necessary to shim or plane joists due to size variations in lumber. Be sure to sort and exclude any extremely crowned joists/lumber material.
- Install solid wood blocking between each joist, placed in rows at maximum every 4’ – 6’ within the structure using exterior grade screws. Solid blocking will help reduce up or down movement and/or twisting of joists. Limiting joist movement can help reduce excessive gapping and also ensure a more uniform finished surface of the Armadillo Deck.
- Use of Armadillo Joist Covers can provide excellent protection to the joist substructure, extending its life.
- Prior to installation, check to make sure all joists are level, structurally sound, and there are no nails or screws protruding.
- Proper joist spacing is required for proper installation. Joist spacing should never exceed 16” on center. For a more rigid feel, 12” may be preferred.
Perpendicular Installation Substructure
16” on center maximum joists. (12” on center for commercial applications.
Picture Frame- Perpendicular Installation
Substructure 16” on center maximum joists plus additional support for picture
frame structure. (12” on center for commercial applications.
Diagonal (45 degree) Installation Substructure
12” on center maximum joists. Different angles will require – 60 degrees 14”
on center spacing, 30 degrees 6” on center
Perpendicular Stair
Pattern
10” on center maximum runners.
Gapping (Expansion and Contraction):
When installing Armadillo composite decking, gapping guidelines must be
followed to minimize expansion and contraction issues and allow for proper
drainage and the shrinking of treated wood joists that can happen over time.
- Expansion/contraction is most significant where extreme temperature change may exist.
- Best practice is to fasten the deck boards as soon after cutting as possible. Cutting in the heat of the afternoon and leaving them overnight in the cooler air will cause contraction.
- For better results keep decking as cool as possible during attachment. Direct full sun exposure will increase board temperature and length. If attaching during high heat, larger gapping can be expected. Be sure to keep butt joints, splices or miters tight.
- Be sure to fasten ends of boards, splices, or abutments to building or structure securely into framing using 2 screws. Position the screws at or within ½” of each board end or joint and ¾” from side of deck plank.
- For butt joints, be sure to trim cut factory ends to ensure squareness. Do not scarf cut butt joints. Use nailery boards on either side of joist to properly connect butt joints with two TurboClip fasteners.
Note: It is recommended to avoid butt joints and expansion contractions issues and install a transition board in between lengthy spans.
- Provide a 1/8” to ¼” side to side gap between deck boards.
- End Gapping Chart
Flashing and Joist Cover Installation
Flashing
- Plastic flashing is the perfect solution for directing water away from the house and over the ledger board. By preventing that moisture from seeping into the stud wall and rotting the house frames supporting your deck.
- Simply place the flashing on top of the ledger board with the long side against the house and attach with nails or staples every 16”to the structure.
Joist Cover
- Our low maintenance decking is a smart investment. Protect that investment by guarding its foundation. When leaves and debris get trapped between your deck boards and joists it causes deterioration. Armadillo Joist Covers protect the underlying lumber where moisture collects to prevent rotting. Protect the sub-structure of your deck.
Fasteners:
Hidden Deck Fasteners
- Use only approved, non-evasive, hidden deck fasteners. Armadillo recommends the use of TurboClip Hidden Deck Fasteners and Starter Clips for grooved board installation. Use of any alternative fastener does not void the Armadillo warranty; however, if a decking failure is caused by using one of these alternative fastening methods, any corresponding claims will be denied. See list at end of guide.
- Install two TurboClips to each board per joist.
Insert
Insert the TurboClip Universal Hidden Deck Clip into the groove of the deck
board. Unlike regular deck clips, TurboClip Universal Hidden Deck Clips come
in
“sticks” of 16, so you aren’t continuously reaching for another clip at every
joist.
Drive
Drive the preloaded screw through the Universal Hidden Deck Clip and into the
deck support. TurboClip Universal Hidden Deck Clips come with preloaded,
stainless steel screws.
Snap
Snap off the remaining stick of TurboClip Universal Hidden Deck Clips. To
continue your decking install, simply snap off the clip that you previously
screwed in and continue across the length of the board.
Fasteners:
Face Screws
- Use reverse-threaded composite deck screws.
- Screws must be 3/8″ to 1″ from side of board, 3/8″ to 1″ from end of board.
- Use Starborn Cap-Tor®xd Armadillo color-matched screws for best results. Always pre-drill 9/64” pilot hole.
- Use caution not to overdrive screw.
STARBORN COLOR | ARMADILLO COLOR |
---|---|
Brown (#34) | Campfire |
Chocolate (#71) | Walnut |
Dark Gray (#53) | Smoke |
Dark Slate (#55) | Charcoal |
Gray (#37) | Coyote |
Java (#73) | Bronco, Tortoise |
Mahogany (#82) | Sunset |
Tan-Gray (#31) | Foothills |
White (#39) | White Sand |
- Use Starborn Pro Plug System with color matched Armadillo plugs for Deck & Trim.
- Make sure to pre-drill 7/32” pilot hole. Drill pilot hole only through the deck board. Do not drill pilot hole into framing.
- For proper installation, refer to www.starbornindustries.com for all installation instructions for deck screws and the Pro Plug system.
General Installation Guidelines
SOLID AND GROOVED
- Add a support joist to the outside or inside of the outer joists. Insert the Armadillo flashing so the shorter edge rests over the house ledger wood board and the longer plastic edge is inserted behind the house siding. Add notches in the Armadillo flashing to clear wood joists as needed. Add an additional support joist to the outer edge (prevents stringer movement). For longer spans/runs of decking please add additional support blocks throughout substructure, preventing twisting and adding rigidity.• Start at the end of the deck away from the house. First, place the TurboClip® Starter Clip on the joist 1/4” from the outside edge of the deck frame. Align the screw with the center of the perpendicular joist and secure. Continue across the length of the deck frame using one (1) Starter clip at every cross joist. Be sure to align the starter clips so that the deck boards are installed level across the lineal path.
- Push the first deck board into the starter clip.
- Insert TurboClip® Hidden Deck Clip into the side groove of the board. The arrow on each clip indicates which side to insert. Align the screw with the center of the joist. Drive the screw so that the head is flush with the clip. DO NOT OVERDRIVE SCREW. Overdriving screws will cause clip failure. Pull up, twist and snap off the remaining TurboClip® stick.
- Slide the next deck board into place. Continue across the length of the deck board. Continue to measure the distance to home and adjust accordingly so the last board doesn’t have to be trimmed lengthwise at an angle.
SOLID AND GROOVED
- When sliding the next deck board into place, slightly raise the outer edge of the board being installed and slide it onto the fastener until the board contacts the spacer tab. A rubber mallet can be use to tap the board into place against the spacer tab.
When butt joints are used be sure to follow gapping guidelines shown on pg 6. We recommend picture framing and using a transition board to avoid butt joints. When butt joints are used with lack of picture frame, perimeter screws are required. When installing fascia to cover the ends of the boards, screws are not requiredaroundthe outside deck perimeter.
STAIR INSTALLATION
Stair stringers should be placed 10” on center. Face screw boards on stair stringers. Use solid boards only. A 1/16”minimum edge gap is required between stair treads.
FASCIA/RISER INSTALLATION
- Pre-drill pilot holes starting 1 ¼” in from board end and ¾” from outer edge of fascia/riser board, every 12” on center using a drill bit. Pre-drilled holes should be larger than screw to allow for board movement during expansion and contraction. Screw down the fascia board using the pre-drilled holes with a composite fascia deck screw. DO NOT FULLY TIGHTEN SCREW. We recommend Starboard’s Fascia screw system.
- Drill screws in perpendicular, not at an angle. Do not overdrive, splitting may occur.
- Gapping: A 1/16”minimumgap is required. Failure to use proper gapping will void all warranties and liabilities.
- Fascia/riser may be installed to cover the ends of boards or under the cantilevered deck surface.
- Armadillo fascia/riser boards are not made to be used as deck boards.
CARE AND CLEANING
Armadillo is the ultimate choice for a low maintenance product that requires cleaning at least 2 times a year. Theses periodic cleanings will help to maintain the appearance of the deck boards. Please visit www.armadillodeck.com for additional information.
Problems and Recommended Solutions
DIRT AND DEBRIS
Spray the affected area with a water hose to remove dirt from surface. Use
warm soapy water made with mild dish washing detergent and a soft sponge/rag
to remove any dirt buildup. Thoroughly rinse off with garden hose when
complete.
STICKER ADHESIVE
Apply citrus based cleaning product (such as Zep, Goof Off, Goo Gone, etc.) to
the affected area. Use a soft sponge or rag to gently remove the buildup. Be
sure to thoroughly rinse off the decking surface.
OIL AND GREASE
All oil and grease spills should be cleaned up as quickly as possible. Use
warm, soapy water made with mild dish washing detergent and soft sponge or rag
to remove the spill. Thoroughly rinse off with a garden hose when complete.
The deck surface must be cleaned within one week to maintain the stain portion
of the warranty.
MOLD AND MILDEW
Mold and mildew are commonly found on outdoor building materials. To prevent
pollen and debris buildup, periodic cleaning is best. If mold or mildew is
present, use warm soapy water made with mild dish washing detergent and soft
sponge or rag to remove it. Thoroughly rinse off with a garden hose when
complete.
ICE AND SNOW
Apply calcium chloride or rock salt if needed. Be sure to thoroughly rinse off
deck surface later on to avoid residue buildup. A plastic shovel may be used
to clear snow. Never use a metal shovel or sharp edged tools to remove snow
and ice.
PRESSURE WASHER
We do not recommend the use of a pressure washer as it could damage the deck
surface.
Armadillo Fastener Quick Reference Guide
| | | | | |
Hidden Fasteners for Deck Boards| | | | |
Manufacture| Brand name| Fastener Size| Do Not Recommend| Recommended Good
Best|
Avon Plastics| TurboClip Universal Standard Gap Deck Clip| #8 X 1-3/4″| | | X|
Avon Plastics| TurboClip Universal Narrow Gap Deck Clip| #8 X 1-3/4″| | | X|
| | | | | |
Standard Fasteners for Deck Boards| | | | |
Manufacture| Brand name| Fastener Size| Do Not Recommend| Recommended Good
Best| Pilot Hole Size
Stubborn| Cap-Tor xd Headcote 316| #10 X 2-1/2″| | | X| 9/64″
Stubborn| Cap-Tor xd Headcote 316| #10 X 2-3/4″| | | X| 9/64″
Stubborn| Cap-Tor xd Headcote 305| #10 X 2-1/2″| | | X| 9/64″
Stubborn| Cap-Tor xd Headcote 305| #10 X 2-3/4″| | | X| 9/64″
Stubborn| Cap-Tor xd Epoxy Coated Carbon Steel| #10 X 2-3/4″| | | X| 9/64″
GRK Fasteners| RT Composite Trim Head Screw| #8 X 2-1/2″| | X| | 1/8″
Grip Fast| Composite Cladding Screw| #9 X 2″| | X| | 5/32″
Deck Mate| Star Drive Composite Screws| #9 X 2-1/2″| | X| | 5/32″
Grip Rite| Composite Deck Screw II| #9 X 2-1/2″| | X| | 5/32″
Grip Rite| Composite Deck Screw II| #9 X 3| | X| | 5/32″
Grip Fast| Composite Decking Screws| #10 X 2-3/4″| | X| | 9/64″
Camo| Edge Deck Screws| #7 X 1-7/8″| X| | | 1/8″
Camo| Edge Deck Screws| #7 X 1-7/8″| X| | | 1/8″
Deck Mate| Star Drive Coated Screw| #8 X 2″| X| | | 1/8″
Grip Fast| Stainless Steel Deck Screw| #8 X 2″| X| | | 1/8″
Deck Mate| Star Drive Coated Screw| #9 X 2″| X| | | 5/32″
Deck Mate| Star Drive Coated Screw| #9 X 2-1/2″| X| | | 5/32″
Grip Fast| Triple Coated Deck Screws| #9 X 2-1/2″| X| | | 5/32″
| Note: A pilot hole must be drilled prior to installing any| | | |
| fastener in the Armadillo boards whether or not the| | | |
| fastener company recommends pre-drilling.| | | | |
| | | | | |
Standard Fasteners for Fascia Boards| | | | |
Manufacture| Brand name| Fastener Size| Do Not Recommend| Recommended Good
Best| Pilot Hole Size
Stubborn| Deck fast Fascia Epoxy Coated Carbon Steel| #10 X 1-7/8″| | | X|
5/32″
Stubborn| Deck fast Fascia Stainless| #9 X 1-7/8″| | | X| 5/32″
Grip Fast| Ultra Clip Hidden Fastener System Decking
Screw
| #6 X 1-1/2″| | X| | 3/32″
Grip Rite| Trim Screws| #7 X 1-5/8″| | X| | 1/8″
DeckMate| Star Drive Composite Screws| #8 X 1-5/8″| | X| | 1/8″
Grip Rite| Composite Deck Screw II| #8 X 1-5/8″| | X| | 1/8″
DeckMate| Star Drive Coated Screw| #8 X 1-5/8″| | X| | 1/8″
Grip Fast| Stainless Steel Deck Screw| #8 X 1-5/8″| | X| | 1/8″
| Note: A “pilot” hole must be drilled prior to installing| | | |
| any fastener in the Armadillo fascia whether or not the| | | |
| fastener company recommends pre-drilling.| | | | |
References
- Armadillo Composite Decking Home : Armadillo Deck
- Armadillo Composite Decking Home : Armadillo Deck
- Starborn Industries, Inc.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>