CHESTERTON 3000 Soot Blower Packing Instruction Manual
- June 4, 2024
- CHESTERTON
Table of Contents
MECHANICAL PACKING INSTALLATION INSTRUCTIONS
3000 Soot Blower Packing
Installation Instructions
System should be shut down, depressurized, drained, and cool before repacking. Observe all safety requirements.
-
Unbolt the packing gland, pull back the packing gland, and tie it back if necessary to provide a sufficient working area.
-
Remove old packing with a flexible packing extractor and proceed carefully so as not to damage the tube.
The stuffing box must be free of any previous packing. -
Clean all components including stuffing box and gland. Use an approved cleaner if necessary.
-
Inspect tube and stuffing box for excessive pits, nicks, burrs, cuts, and scratches, which may act as a path of leakage. Repair or replace parts as necessary.
-
Install bottom ring around tube by twisting slightly. Never open rings with a hinge-like action (See Figure 1).
Use a tamping tool to seat the ring to the bottom of the stuffing box.
FIG. 1
-
Repeat step 5 until all sealing rings are installed including the top ring (See Figure 2). Be sure to install rings in the correct sequence. Seat each ring individually with a tamping tool. Stagger joints 90° apart.
CAUTION: Care should be taken to avoid damaging ring lips -
Reinstall the packing gland until finger tight. Take up gland nuts one full turn to properly spread lips and establish a seal. Adjust packing gland nuts as necessary. After several operations, readjustment of gland nuts may be required.
FIG. 2
Chesterton ISO certificates available at www.chesterton.com/corporate/iso
860 Salem Street
Groveland, MA 01834 USA
Telephone: 781-438-7000 Fax:
978-469-6528
chesterton.com
© 2022 A.W. Chesterton Company.
® Registered trademark owned by A.W. Chesterton Company
in USA and other countries, unless otherwise noted.
ENGLISH/ITALIAN/GERMAN/SWEDISH/JAPANESE/SPANISH/FRENCH
072039
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>