Puig F900GS Touring Screen Instruction Manual

September 25, 2024
Puig

Puig F900GS Touring Screen

Product Usage Instructions

Mounting Instructions:

  1. Ensure you have all the parts listed in the “DESCRIPTION” section of the manual.
  2. Follow the step-by-step “INSTRUCCIONES DE MONTAJE – MOUNTING INSTRUCTIONS – MONTAGEANLEITUNG” provided in the manual.
  3. Use the specified tools and tightening torques as indicated in the manual for secure installation.

Disassembly:

  1. Follow the disassembly steps outlined in the manual to remove any existing components that need to be replaced with the touring screen.

Assembly:

  1. Refer to the assembly steps provided in the manual to correctly install the touring screen on your BMW F900GS ’24-.
  2. Make sure to tighten all screws and components to the specified torque values for a secure fit.

Frequently Asked Questions (FAQ):

  • Q: How long does it take to mount the touring screen?
    A: The estimated mounting time is 15 minutes for one person.

  • Q: Are all components needed for installation included in the package?
    A: Yes, ensure you have all the parts listed in the “DESCRIPTION” section before starting the installation process.

Product Information

PART DESCRIPTION

ID. PART DESCRIPTION QTY. REF.:
1 Touring screen 1 21980W/H/FM3
2 **** M5x9 special screw, Hexagonal lenght 14 (M5x12) 4 TORNI-EC—– 597
3 **** M5 DIN 9021 Ø5,3x Ø15 x1,2 Washer 4 ARAND-PD5—152
4 **** Ø12xØ6×9 Silentblock 4 AROPASACABLES-1
5 **** Ø12xØ6,8×7,3 Bush with flange 4 CASQUI-1A—750
6 **** M5x16 Ø11 ISO 7380 Allen screw 4 TORNI-I7380-493
7 **** M5 ISO 7380 Screw cap 4 TAPON——– 85

Some components are supplied assembled.

MOUNTING INSTRUCTIONS

www.puig.tv
www.puigusa.com
info@puig.tv
info@puigusa.com

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals