Autovent Systems AV Series Vent Opener Control Panel Installation Guide
- September 18, 2024
- Autovent Systems
Table of Contents
AV Series Vent Opener Control Panel
Product Information
AV-AC Series Control Panel
The AV-AC Series Control Panel is designed for controlling
ventilation systems in greenhouses. It includes features for
operating vent openers to regulate airflow and temperature inside
the greenhouse.
Specifications:
- Model: AV-AC Series
- Control Panel Type: Plug-in
- Compatible with: Vent openers
- Material: Durable plastic and metal components
Product Usage Instructions
Control Panel Wiring
-
Follow the wiring diagram provided in the user manual to
connect the control panel to the power source and the vent
openers. -
Ensure proper grounding to avoid electrical hazards.
AV-SCE Vent Opener Installation
-
Attach the fixed brackets to the actuator. Place the opener on
the frame where the arm will attach as close to the center of the
vent as possible, and mark the location of both brackets. -
Unscrew the fixed brackets and place them where marked on the
frame. -
Use the provided Hex head screws to mount the actuator to the
fixed brackets. -
Mount the fixed arm holder on the vent frame and secure it with
Phillips head screws. -
Ensure smooth operation by fully opening and closing the
vent.
NOTE: Apply blue thread locker to the pin
threads to prevent loosening during operation.
Frequently Asked Questions (FAQ)
Q: Can the control panel be used with other greenhouse
brands?
A: The mounting position shown in the instructions is optimized
for Cross Country greenhouses, but it may vary for other brands.
Consult the specific greenhouse manufacturer’s guidelines for best
results.
Q: How do I troubleshoot if the vent opener does not operate
smoothly?
A: Check for any obstructions in the vent mechanism, ensure
proper alignment of components, and lubricate moving parts if
necessary. If issues persist, refer to the troubleshooting section
in the user manual or contact customer support.
Wiring and Installation Guide
AV-AC Series Control Panel Instructions
FORM: D8054
1
Control Panel Wiring
Typical Plug-in Control Setup
2
The wiring method in Figure 3 is commonly used in applications where 4 or less
openers will be installed with less than 40′ of total wiring run. 14 gauge
wire can be used in this scenario. Figure 4 divides the power to the openers
into multiple lines. It is recommended for applications of 4 or more openers
and/or wiring runs over 40′. 14 gauge wire can still be used with this method
for up to 10 openers with a wiring run of 50′ or less (per line). 12 gauge
wire should be used for longer runs. Voltage to each opener should not drop
below 22V DC.
AV-SCE Vent Opener Instructions
3
1
2
3
.
.
.
1. Attach the fixed brackets to the actuator. Place the opener on the frame where the arm will attach as close the center of the vent as possible, and mark the location of both brackets.
2. Unscrew the fixed brackets, and place them where marked on the frame (mounting position shown is for Cross Country greenhouses and optimal position may vary for other brands).
3. Use the provided Hex head screws starting with the center hole. They are self-tapping so no pre-drilling is needed. For Cross Country greenhouses the top hole is not used because the screw will damage the covering / glazing on most models.
4. Mount the actuator to the fixed brackets, and place the fixed arm holder
on the vent where the arm will make contact when extended. Use the Phillips
head screws to attach the fixed arm holder to the vent frame. Press open on
the control panel or remote to move the head of the arm in position to secure
it to the holder with the attached pin (#5 on parts diagram).
NOTE: It is recommended blue thread locker be applied to the threads on the
pin to keep the 5
nut from coming loose during operation.
5. Fully open and close the vent to make sure it operates smoothly. Repeat this process for the rest of the openers.
4
4
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>