JBC RHS-A RHS Rework Hand Support Instruction Manual

September 4, 2024
JBC

RHS-A RHS Rework Hand Support

“`html

Specifications:

  • Product Name: Articulated Hand Rest for PHSEK Preheater
    Set

  • Reference: RHS-A

  • Base Dimension: 410 x 270 mm / 16.14 x 10.63 in

Product Usage Instructions:

Assembly:

  1. Fit the shaft into the base bushing and tighten the headless
    screw.

  2. Assemble the height adjustment flange and then the hand rest
    arm onto the shaft.

Height Adjustment:

Slide the arm to the desired height and secure it by tightening
the knob for stability.

Work Position Adjustment:

Position the arm according to your work needs and tighten the
knobs. Refer to the provided images for correct hand work
position.

Preheater Positioning:

Fit PHSE onto the positioning bolts for proper alignment. Use
the corner guides to help place the heater unit in position. If a
fixed position is not desired, positioning bolts can be removed
with a screwdriver.

FAQ:

Q: Can I use both left and right hand rests

simultaneously?

A: Yes, both HRR (right hand rest) and HRL (left hand rest) can
be used together. Assemble them according to the markings on the
back of the hand rests to keep hand supports at the same level.

Q: What other JBC articles are compatible with HRR and

HRL?

A: HRR and HRL can be combined with RWT Adjustable Rework Arm,
RWS Adjustable Rework Arm for PHSE, and RWB Adjustable Rework Arm
for PHBE.

“`

w w w.j b c to o l s .c o m
INSTRUCTION MANUAL
RHS
Articulated Hand Rest for PHSEK Preheater Set

This manual corresponds to the following reference: RHS-A
Packing List
The following items are included:

Articulated Hand Rest Arm ……………. 1 unit

Height Adj. Flange ……w. 1 unit Ref. 0023991

Shaft ………………………… 1 unit Ref. 0024007

Base PHSE compatible ……………………. 1 unit

Headless Screw ………………………………… 1 unit Ref. 0017057

Allen key …………………………………………….. 1 unit Ref. 0013609
2

Manual ………………………………………………… 1 unit Ref. 0028766

Features
Shaft
Height Adjustment Flange Headless Screw Printed Corner Guides Hand Rest Base

Articulated Hand Rest Arm
ESD Connector (connect to ESD Common Grounding Point) Positioning Bolds

Assembly

Height Adjustment Flange
3

Hand Rest Arm 4

Setting up the Articulated Hand Rest

Shaft

Fit the shaft into the base bushing (1) and tighten the headless screw (2). Then assemble first the height adjustment flange (3) and finally the hand rest arm (4) onto the shaft.

Base Bushing

The hand rest arm position should be as shown in the image. The right hand rest is marked at its bottom side with the letter “R”.

1 2
Headless Screw (at the back)

Right Hand Rest
R
R
Bottom View
3

Height Adjustment
According to your work needs the articulated hand rest allows adjustment for different heights through the vertical axis.
Slide the arm to the appropriate height (1) and secure it by tightening the knob (2) to guarantee stability.

1 2

Arm Knob

Work Position Adjustment
RHN arm allows adjustment for different positions according to your work needs. The articulated arm covers all work areas.

JTT

Position the arm and tighten the knobs. The correct hand work position is shown in the following images:
4

Preheater Positioning
RHS has been designed to work together with PHS Fit PHSE onto the positioning bolts (1) for proper alignment. The four corner guides (2) help to place the heater unit in its position.

Positioning Caps
1 1

Corner Guides
2

If a fixed preheater position is not wanted the positioning
bolts can be removed with a screwdriver.

Positioning Bolds

Note: for each preheater size, there are different articulated hand rests with different base dimensions available.

Preheater PHNE PHSE PHBE

Articulated Hand Rest RHN RHS RHB

Base Dimension 310 x 239 mm / 12.20 x 9.41 in 410 x 270 mm / 16.14 x 10.63 in 550 x 480 mm / 21.65 x 18.90 in

5

Accessories*
If a second hand rest ist needed, Articulated Left Hand Rest HRL is available. HRL also allows adjustment for different positions.
HRL Articulated Left Hand Rest

In the case of using both left and right arms, assemble both as shown in the illustration according to the letters on the back of the hand rest, to keep the hand supports at the same level. The right hand rest should be assembled below the left hand rest.

HRL Articulated Left Hand Rest Bottom View
L

HRR Articulated Right Hand Rest
Mark for right hand rest
R

L
Mark for left hand rest
6

R
Bottom View * Not included, sold separately.

Compatible JBC Articles*

HRR and HRL can be combined with: RWT Adjustable Rework Arm, RWS Adjustable Rework Arm for PHSE and RWB Adjustable Rework Arm for PHBE.

Assemble first the height adjustment flange (1), then the HRR (2) and afterward the HRL (3). Assemble the second height adjustment flange (4) and finally the RWT (5).

Heights Adjustmet Flange (2nd)

RWT Ajustable Rework Arm

HRL Articulated Left Hand Rest

Heights Adjustmet Flange (1st)

Place the preheater set in the area below the hot air tool

HRR Articulated Right Hand Rest
4 different sizes for PCB Supports are available: – PHNS Support for PCBs up to 11×7 cm / 4×3″ – PHSS Support for PCBs up to 13×13 cm / 5×5″ – PHBS Support for PCBs up to 36×28 cm / 14×11″ – PHXLS Support for PCBs up to 51×61 cm / 20×24″

  • Not included, sold separately.
    7

Maintenance
– Check periodically that RHS is clean, especially the sliding parts and the shaft.
– Use a damp cloth when cleaning. Alcohol can only be used to clean the metal parts.
– Replace any defective damaged parts. Use original JBC spare parts only.
Do not leave HRR over the preheater when the preheater is working.

Shaft Sliding Parts

Safety
It is imperative to follow safety guidelines to prevent electric shock, injury, fire or explosions.
– Do not use the equipment for any purpose other than PCB rework. – The temperature of accessible surfaces may remain high after the unit is turned off. Handle with care. – Be careful with the fumes produced when soldering. – Keep your workplace clean and tidy. Wear appropriate protection glasses and gloves when
working to avoid personal harm. – Do not leave up the arms directly above heat surfaces. – Utmost care must be taken with liquid tin waste which can cause burns. – This appliance can be used by children over the age of eight as well as persons with reduced physical,
sensory or mental capabilities or lacking experience provided that they have been given adequate supervision or instruction concerning the use of the appliance and understand the hazards involved. Children must not play with the appliance. – Maintenance must not be carried out by children unless supervised.

8

Notes
9

Notes
10

Notes
11

Specifications

RHS Articulated Hand Rest for PHSEK Preheater Set Ref.: RHS-A

– Base Dimensions: – Total Height: – Arm Height: – Arm Lenght: – ESD Connector

270 x 410 mm / 10.6 x 16.2 in 205 mm / 8.07 in 200 mm / 7.87 in 498 mm / 19.61 in

– Total Net Weight:

5.94 kg / 13.1 lb

– Package Dimension / Weight: 474 x 368 x 195 mm / 7.9 kg

(L x W x H)

18.66 x 14.49 x 7.68 / 17.42 lb

Complies with CE standards ESD Safe

Warranty JBC’s 2 year warranty covers this equipment against all manufacturing defects, including the replacement of defective parts and labour. Warranty does not cover product wear or misuse. In order for the warranty to be valid, equipment must be returned, postage paid, to the dealer where it was purchased.
This product should not be thrown in the garbage. In accordance with the European directive 2012/19/EU, electronic equipment at the end of its life must be collected and returned to an authorized recycling facility.

0028766-230124

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals