Bed Bath and Beyond 38325475 Poplar And Pine Wood California King Size Platform Bed Beige Instruction Manual
- August 24, 2024
- Bed Bath and Beyond
Table of Contents
Bed Bath and Beyond 38325475 Poplar And Pine Wood California King Size
Platform Bed Beige
Product Specifications
- Product: Cal King Bed
- Assembly Required: Yes
- Tools Needed: Screwdriver (not provided)
- Material: Wood
- Color: Brown
- Dimensions: 76″ x 80″ x 12″
- Weight Capacity: 500 lbs
Product Usage Instructions
Assembly Instructions
- Ensure all parts and hardware are present before starting assembly.
- Carefully follow the steps outlined in the manual to assemble the bed.
- Do not fully tighten bolts until all bolts are in place.
- Avoid over-tightening bolts to prevent damage to threads.
- Keep all small parts and hardware out of reach of children.
Step-by-Step Assembly
- Identify and lay out all parts as per the parts list.
- Start with assembling the headboard and footboard to the side rails using the provided screws.
- Attach the center support and legs to provide additional stability.
- Add the bed legs, ensuring they are securely attached.
- Place the slats on the bed frame for mattress support.
Frequently Asked Questions (FAQ)
-
Q: Can I use a power drill for assembly?
A: It is recommended to use a manual screwdriver to prevent over-tightening of bolts. -
Q: What is the weight capacity of the bed?
A: The bed has a weight capacity of 500 lbs. -
Q: How many people are needed for assembly?
A: It is advisable to have at least two people for easier and safer assembly.
ASSEMBLY INSTRUCTIONS
CAL KING BED
THANK YOU FOR PURCHASING THIS QUALITY PRODUCT. READ THESE INSTRUCTIONS
CAREFULLY.
SEE PARTS LIST AND HARDWARE LIST FOR GUIDANCE, BE SURE ALL PARTS ARE PRESENT
PRIOR TO ASSEMBLY.
CAUTIONS:
- DO NOT FULLY TIGHTEN BOLTS UNTIL ALL BOLTS ARE IN PLACE AND READY FOR ASSEMBLY.
- DO NOT OVER-TIGHTEN BOLTS TO AVOID CAUSING DAMAGE TO THE THREADS.
- KEEP ALL PARTS AND HARDWARE OUT TO REACH OF CHILDREN.
TOOLS NEEDED : SCREWDRIVER (NOT PROVIDED)
PARTS LIST
ITEM| DESCRIPTION QTY
A| HEADBOARD (1/2) 1 PC
– B| FOOTBOARD (2/2) 1 PC
C| SIDE RAIL (2/2) 2 PCS
D| CENTER SUPPORT (2/2) 2 PCS
E| CENTER SUPPORT LEG (2/2) 6 PCS
F
G
| BED LEG (STRAIGHT) (2/2) 2 PCS
BED LEG (SHAKER) (2/2) 2 PCS
H| SLATS (1/2) 1 SET
HARDWARE LIST
ITEM DESCRIPTION | QTY |
---|
1
2
| CSK SCREW M4 x 38mm (2/2)| 12 PCS
ALLEN KEY M5 (2/2)| 1 PC
ASSEMBLY STEPS
STEP 2
-
STEP A : Use the ALLEN KEY M5 (2) to turn loose all the JCBB BOLT & WASHER and don’t pull out. Hang the SIDE RAILS (C) to HEADBOARD (A) & FOOTBOARD (B).
-
STEP B : Tighten all the JCBB BOLT & WASHER after assembly the SIDE RAILS (C).
-
When moving bed position, the center support lea levelers must be adjust up right to avoid breakage of the leg and center support
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>