AGS SP-100 Defence Battery Centre Instructions
- August 20, 2024
- AGS
Table of Contents
AGS SP-100 Defence Battery Centre
INSTRUCTION MANUAL
1. PROVIDE A 1/2″ NPT “T” WHERE YOU PLAN TO INSTALL THE TEMPERATURE PROBE. IF THE “T” IS > 1/2″ , PROVIDE A REDUCER BUSHING.
2. INSTALL THE COMPRESSION FITTING INTO THE “T”.
DO NOT TIGHTEN THE COMPRESSION NUT UNTIL PROBE IS IN POSITION.
3. SLIDE THE PT100 DOWN THROUGH THE COMPRESSION FITTING.
4. POSITION THE COMPRESSION FITTING SO THAT THE TIP IS IN THE FLOW OF WATER THEN TIGHTEN IT DOWN.
5. WIRE 3-WIRE CABLE BACK INTO PT100 TERMINAL. MATCH COLORS SHOWN.
PROVIDE 3-WIRE 22AWG WIRE AS AN EXTENSION WIRE.
6. BRING 120V TO THE CONTROL TO USE THE 120V VALVE OUTPUT.
7. BRING 24V TO THE CONTROL TO USE THE 24V VALVE OUTPUT.
8. IF THE UNIT IS POWERED WITH 120VAC, THE 24VAC VALVE OUTPUT WILL NOT WORK.
9. IF THE UNIT IS POWERED WITH 24VAC, THE 120VAC VALVE OUTPUT WILL NOT WORK.
INTENTIONALLY BLANK
Specifications:
-
Probe Type: PT100
-
Wire Type: 3-Wire 20-22AWG
-
Power Input: 120VAC or 24VAC
-
Valve Output: 120V or 24VAC
-
-
FAQ:
Q: Can I use any type of wire for extension?
A: Yes, any 3-wire connection will work. Extension wire does not have to be color-coded.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>