PITCO 45C Plus Gas Fryers Instruction Manual
- August 14, 2024
- PITCO
Table of Contents
This Owner’s Manual is provided and hosted by Appliance Factory
Parts.
PITCO 45C+
Owner’s Manual
Shop genuine replacement parts for PITCO
45C+
Find Your PITCO Deep Fryer Parts – Select From 19
Models
——– Manual continues below ——–
45C Plus Gas Fryers
Installation, Operation, and Maintenance Manual
For Gas Fryers
Covering Models
45C+, 35C+
Pitco Frialator, Inc.,
P.O. Box 501, Jct I-89 & I-93 Concord, NH 03302-0501 • 509 Route 3A, Bow, NH
03304
800-258-3708 •
603-225-6684 • FAX
603-225-8497
L20-072 Rev 5 (11/03)
NOTICES
There are three different types of notices that you should be familiar with, a
NOTICE, CAUTION, and WARNING. A NOTICE is a special note used to call
attention to a particularly important point.
CAUTION is used to point out a procedure or operation which may cause
equipment damage. The WARNING notice is the most important of the three
because it warns of an operation that may cause personal injury. Please
familiarize yourself with your new cooker before operating it and heed the
notices throughout this manual. The WARNINGS are listed below and on the
following page for your review prior to operating the unit.
FOR YOUR SAFETY
DO NOT store or use gasoline or other flammable vapors or liquids in the
vicinity of this or any other appliance.
WARNING: Improper installation, adjustment, alteration, service or maintenance
can cause property damage, injury or death. Read the installation, operating
and maintenance instructions thoroughly before installing or servicing this
equipment.
TO THE PURCHASER
POST IN A PROMINENT LOCATION INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THAT AN
OPERATOR SMELLS GAS. OBTAIN THIS INFORMATION FROM YOUR LOCAL GAS SUPPLIER.
THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE
WARNING
The cooker must be electrically grounded in accordance with local codes. If
local codes do not apply, follow the requirements of National Code ANSI/NFPA
70-1990.
WARNING
This cooker is equipped with a three prong safety plug. This safety plug
protects operators from electrical shock in the event of an equipment
malfunction.
DO NOT remove the grounding (third) prong from this plug.
WARNING
DO NOT use an open flame to check for gas leaks!
WARNING
A cooker that is equipped with casters and a flexible power cord must be
connected to the gas supply with a Quick-Disconnect device. This quick
disconnect must comply with ANSI Z24.41-1989. A restraining cable must be
installed to limit the movement of the cooker.
WARNING
There is an open gas flame inside the cooker. The unit may get hot enough to
set nearby materials on fire. Keep the area around the cooker free from
combustible materials.
WARNING
Ensure that the cooker can get enough air to keep the flame burning correctly.
If the flame is starved for air it can give off dangerous carbon monoxide.
Carbon Monoxide is a clear odorless gas that can cause suffocation and death.
WARNING
Be sure the burner tubes are COMPLETELY covered with water before lighting the
pilot or main burners. If the tubes are exposed, the cooker may overheat,
causing damage to the kettle, creating a fire hazard, and voiding the
warranty.
WARNING
Carbon monoxide can build up if the flue is blocked. Blocking the flue will
also cause the cooker to overheat. Ensure that minimum clearances specified in
the installation instructions are maintained. DO NOT obstruct the flow of
combustion/ventilation or air opening around the Noodle Cooker. Adequate
clearance around the cooker is necessary for servicing and proper burner
operation. Ensure that you meet the minimum clearances specified in the
installation instructions.
WARNING
The power supply must be disconnected before servicing or cleaning the
appliance.
WARNING
For gas cookers, DO NOT supply the cooker with a gas that is not listed on the
data plate. If you need to convert the cooker to another type of fuel, contact
your dealer.
WARNING
For gas cookers, WAIT five (5) minutes before attempting to relight the pilot.
This allows time for any gas remaining in the cooker to dissipate.
THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE
Chapter 1: General Information and Installation
Congratulations on the purchase of your new Pitco Frialator universal fryer. This unit will give you many years of reliable service if you follow the simple operation and maintenance procedures in this manual. Contained in this manual are the general installation, operation, and maintenance procedures for the universal fryer Models 45C+, 35C+ and 40C+.
1.1 WHICH FRYER DO I HAVE?
There are two models of this gas fryer available. Each fryer has its own model
number. To find out which model you have, look inside the door at the
equipment identification plate. This plate has a lot of useful information,
but to identify which fryer you have, look at the model number block. The
model number identifies which fryer you have. A brief description of each
model is provided inTable 1-1.
Table 1-1 Fryer Model Information
Model Number | Description | Features |
---|---|---|
45C+ | This Byer can cook up to 85 lbs. of potatoes per hour. | Frying Area: 14″ |
x 14″ Oil Capacity: 42 lbs. BTU Input: 122,000
35C+| This fryer can cook up to 63 lbs. of potatoes per hour.| Frying Area:
14″ x 14″ Oil Capacity: 35 lbs. BTU Input: 90,000
| |
1.2 CHECKING YOUR NEW FRYER
Your new fryer has been carefully packed into one crate. Every effort has been
made to ensure that your fryer is delivered to you in perfect condition. As
you unpack your new fryer, inspect each of the pieces for damage. If something
is damaged, DO NOT sign the bill of lading. Contact the shipper immediately,
the shipper is only responsible for 15 days after delivery. Check the packing
list enclosed with your fryer to ensure that you have received all of the
parts to the fryer. If you are missing any parts, contact the dealer from whom
the fryer was purchased. As you unpack the fryer and it’s accessories be
careful to keep the weight of the fryer evenly distributed.
CAUTION
To prevent equipment damage, don’t tilt the fryer onto any two of it’s casters
or pull the unit by the flue vents.
Locate your Pitco Frialator warranty and fill in the serial number of the
fryer and the date received. You will find the serial number on the plate
inside the door. Put your warranty card in a safe place for future reference.
DO NOT return the card to Pitco Frialator.
1.2.1 Check Your Order
The crate containing the fryer unit will also contain the following:
(2) Pitco Cleaner Sample
(1) Drain Clean Out Rod
1.3 ASSEMBLY AND LEVELING
When you receive your fryer, it is completely assembled with the possible
exception of the legs (or casters) and the heat shield. In some cases, if you
have purchased a multi-fryer unit, you may need to assemble the system.
1.3.1 Leg/Caster Installation and Adjustment
Installing the legs and leveling the fryer is done with a 7/16″ wrench,
socket, and a large pair of water pump pliers. The legs/casters must be
installed to provide the necessary height to meet sanitation requirements and
assure adequate air supply to the burner. Attach the legs by performing the
following procedure.
a. Lay the fryer on its side being careful not to damage the flue by pulling
on it. Protect the outside of the fryer with cardboard or a drop cloth when
laying it down.
b. Attach each leg/caster with the hex head cap screws supplied with the
fryer. Each leg/caster requires four 1/4-20 x 5/8″ cap screws.
c. Mount the screws from the inside of the fryer with the nut on the outside.
The nuts have lock washers attached to them, therefore it is not necessary to
use lock washers.
d. When all four legs/casters are mounted, stand the unit up being careful not
to put too much weight on any one leg/ caster. Adjust the height and level the
fryer by adjusting the leveling devices on the leg/caster with the water pump
pliers.
e. On units with casters, move the fryer to the desired location and lock the
wheels using the locking devices on the sides of the casters.
1.3.2 Assembling Multi Fryer Systems
If you purchased a multi-fryer unit, it could be shipped in more than one
piece. To assemble the unit follow the instructions below.
a. Unpack the units and move them close together. Remove the front panels and
both heat shields from the fryers.
b. There are five joining strips to be attached to the units to make them into
one system. These strips are attached in the rear, front, upper front, and the
forward and rear caster mount. Use the screws supplied with your system to
attach the strips. Secure them tightly to each unit.
c. Replace the heat shield and front panels to complete the system assembly.
1.4 INSTALLATION
Although it is possible for you to install and set up your new fryer, it is
STRONGLY recommended that you have it done by qualified professionals. The
professionals that install your new fryer will know the local building codes
and ensure that your installation is safe.
WARNING
The fryer must be properly restrained to prevent movement or tipping. This
restraint must prevent the fryer from movements that would splash hot liquids
on personnel. This restraint may be any means (alcove installation, adequate
ties, or battery installation).
1.4.1 Installation Clearances
The fryer needs clearance around it for proper operation. Adequate clearances
allow for servicing and proper burner operation. The clearances shown below
are for cooker installation in combustible and non-combustible construction.
| Combustible Construction| Non-Combustible Construction
---|---|---
Back| 6″| 0″
Sides| 6″| 0″
Floor – Combustible| 6″| 6″
1.4.2 Gas Connection
Your fryer will give you peak performance when the gas supply line is of
sufficient size to provide the correct gas flow. The gas line must be
installed to meet the local building codes or National Fuel Gas Code (NFPA
54-Latest Edition) and ANSI Z223.1-Latest Edition Latest Edition. In Canada,
install the fryer in accordance with CAN/CGA-B149.1 or .2 and local codes. Gas
line sizing requirements can be determined by your local gas company by
referring to National Fuel Gas Code, Appendix C, Table C-4 (natural gas) and
Table C-16 (propane). The gas line needs to be large enough to supply the
necessary amount of fuel to all appliances without losing pressure to any
appliance. Other factors that are used to determine the piping requirements
are BTU requirements of the appliances being connected and the length of pipe
between the meter (main shut off) and the appliances.
WARNING
NEVER supply the fryer with a gas that is not indicated on the data plate.
Using the incorrect gas type will cause improper operation. If you need to
convert the fryer to another type of fuel, contact your dealer.
1.4.2.1 Fuel Types – Each fryer is equipped to work with one type of fuel. The
type of fuel with which the appliance is intended to operate is stamped on the
data plate attached to the inside of the door.
WARNING
DO NOT use an open flame to check for gas leaks!
1.4.2.2 Gas Line Connection – Connect the fryer to the gas supply line with a
connector that complies with the Standard for Connectors for Movable Gas
Appliances (ANSI Z21.69-Latest Edition). If you are installing a fryer with
casters use a quick disconnect refer to the Quick Disconnect installation
instruction, 1.4.2.3. Connect the gas line to the fryer using a pipe joint
sealant that is resistant to liquefied petroleum. If the fryer was
disconnected during the fuel line testing, use a solution of soap and water to
leak test the new connection.
NOTICE
NEVER use an adaptor to make a smaller gas supply line fit the cooker
connection. This may not allow proper gas flow for optimum burner operation,
resulting in poor cooker performance.
1.4.2.3 Quick Disconnect Gas Connection – Gas fryers equipped with casters
must be installed with connectors that comply with the Standard for Connectors
for Movable Gas Appliances, ANSI Z21.69-Latest Edition, and Addenda Z21.69A-
Latest Edition. This connection should include a quick disconnect device that
complies with the Standard for Quick Disconnect Devices for Use With Gas Fuel
, ANSI Z21.41-Latest Edition. When installing a quick disconnect you must also
install a means for limiting the movement of the fryer. This device will
prevent the gas line or the quick disconnect from being strained. The
restraining device should be attached to the cooker on the back panel as shown
in the illustration. The quick disconnect, hose, and restraining device can be
obtained from your dealer.
1.4.2.4 Fuel Supply Line Leak and Pressure Testing – The fuel supply system
must be tested before the fryer is used. If the fuel line is going to be
tested at a pressure greater than (>)1/2 PSIG (3.45 kPa), make sure that the
fryer is disconnected from the fuel line. If the fuel line is to be tested at
a pressure equal to or less than (<) 1/2 PSIG (3.45 kPa), the fryer can be
connected but the unit’s gas valve must be shut. Test all gas line connections
for leaks with a solution of soap and water when pressure is applied.
1.4.3 Ventilation and Fire Safety Systems
Your new fryer must have proper ventilation to function safely and properly.
Exhaust gas temperatures can reach as high as 1200°F. Therefore, it is very
important to install a fire safety system. Your ventilation system should be
designed to allow for easy cleaning. Frequent cleaning of the ventilation
system and the fryer will reduce the chances of fire. Table 1-2 provides a
list of reference documents that provide guidance on ventilation and fire
safety systems. This table is not necessarily complete.
Additional information can be obtained from the American Gas Association, 8501
East Pleasant Valley Road, Cleveland, OH 44131.
Excessive ventilation causes drafts, which will interfere with the proper
operation of the pilot and the burner. Leave at least 18 inches of open space
between the fryer’s flue vent opening and the intake of the exhaust hood.
CAUTION
Ensure that your ventilation system does not cause a down draft at the fryer’s
flue opening. Down drafts will not allow the fryer to exhaust properly and
will cause overheating which may cause permanent damage. Damage caused by down
drafts will not be covered under equipment warranty. NEVER allow anything to
obstruct the flow of combustibles or ventilation exiting from the fryer flue.
DO NOT put anything on top of the flue area.
NOTICE
NEVER connect the blower directly to the flue openings. The direct flow of air
will cause poor temperature recovery, poor ignition, inefficient operation of
the fryer, and could extinguish the pilot.
1.5 INITIAL ADJUSTMENTS
After your fryer has been installed as described in section 1.4, it needs to
be adjusted to ensure that it will perform as designed. These adjustments must
be performed by a qualified person. To perform these adjustment the following
tools will be needed:
- Manometer (low pressure gauge)
- DC Millivolt Meter
- Digital Thermometer (Temperature probe)
1.5.1 Visual Checks
After the fryer is in its permanent location, lock the casters and check for
levelness. Any additional leveling that is necessary can be performed as
described in section 1.3.
1.5.2 Burner Ignition Systems
CAUTION
Before going any further, fill the fryer with WATER. Water is used for the
installation adjustments because the temperature will never exceed 212°F
(100°C) thereby allowing plenty of adjustment time. Never let the water level
go below the MIN LEVEL mark on the rear of the tank.
WARNING
There is an open flame inside the fryer. The unit may get hot enough to set
near by materials on fire. Keep the area around the fryer free from
combustibles.
Table 1-2. Ventilation and Fire Safety References
Topic | Underwriters Laboratory Document | National Fuel Gas Code Document |
---|
Grease Extractor
Ventilation Hood| ANSI/UL 710-Latest Edition
ANSI/UL 705-Latest Edition| ANSI/NFPA 96-Latest Edition
ANSI/NFPA 96-Latest Edition
Type of Fire Extinguishers
and Detection Equipment
CO2
Dry Chemical
Water
Foam
Sprinklers
Smoke Detectors
Fire Detection Thermostats| ANSI/UL 154-Latest Edition
ANSI/UL 299-Latest Edition
ANSI/UL 626-Latest Edition
ANSI/UL 199-Latest Edition
ANSI/UL 268-Latest Edition
ANSI/UL 521-Latest Edition| ANSI/NFPA 12-Latest Edition
ANSI/NFPA 17-Latest Edition
ANSI/NFPA 13-Latest Edition
ANSI/NFPA 11-Latest Edition
ANSI/NFPA 13-Latest Edition
ANSI/FPA 72B-Latest Edition
ANSI/FPA 72B-Latest Edition
To light the pilot light, refer to these instructions.
WARNING
Wait 5 minutes before attempting to relight the pilot to allow for any gas in
the fryer to dissipate.
a. Open the gas supply valves to the fryer.
b. Open the fryer’s door to gain access to the controls. Turn the thermostat
control knob counterclockwise to the OFF position.
c. Turn the Unitrol valve knob to the PILOT position and push in on the knob.
Hold the knob in for approximately one minute to purge the air out of the
line. Hold a flame to the pilot light until the pilot ignites. This may take a
little while the first time you light the fryer because of air in the lines.
Once lit, hold the knob in for approximately 60 seconds and then release.
d. If the pilot goes out wait 5 minutes and repeat step c. If after three
tries the pilot will not remain lit, refer to the operator troubleshooting
section of this manual.
e. Turn the Unitrol valve knob counterclockwise to the ON position.
f. Set the thermostat control knob to the desired temperature setting.
g. The main burner will light and be controlled by the thermostat.
h. To completely shut down the fryer, turn the Unitrol valve knob to pilot,
push in and continue turning to OFF.
1.5.2.1 Pilot Flame Adjustment – The pilot flame should be adjusted to produce the proper millivolt output from the pilot sensing device. Millivolt output for the thermopile should be between 300 and 500 millivolts. This procedure is only necessary on the manual pilot ignition system. Figure 1-1 shows the pilot assembly with examples of the incorrect and correct pilot size. Example A illustrates a pilot flame size that is too small to produce sufficient millivolt output. Example B is the correct size for proper millivolt output.
a. This test requires a DC millivolt meter set to a scale of 0-1000mv.
b. Locate the thermopile wires coming from the thermostat/High Limit box going
to the gas shut off valve. The wire insulation size decreases near the gas
valve connections.
c. Connect the negative (-) test probe to pilot bracket.
d. Connect the positive (+) test probe to to one of the High Limit terminal
connections
e. Remove the pilot flame adjustment cover.
f. Turning the flame adjusting screw clockwise lowers the flame and the
millivolt output.
Turning the screw counterclockwise increases flame size and millivolt output.
g. Rotate the screw in the direction to achieve a reading of 400 ±50 mv for
thermopiles.
NOTICE
Allow 3 to 5 minutes between flame adjustments to allow the reading to settle.
h. Replace the pilot flame adjusting screw cover.
1.5.3 Main Burner System
For the burners to work, the gas supply valve must be open. The main burner
receives gas from the main gas supply through the thermostatically controlled
valve. When the thermostat is turned up the gas control valve opens. The pilot
ignites the burners. The burner flame should be adjusted at the air collar (at
the bottom of the burner) so the the flame are a soft blue color without
lifting off the face of the burner.
1.5.3.1 Gas Line Requirements – A properly installed gas supply system will
deliver 7.0 ±2.0″ w.c. natural gas (12.0 ±2.0″ w.c. LP) to all appliances
connected to the line, operating at full demand.
1.5.3.2 Burner Adjustment – The burners must be adjusted to deliver optimum
flame. Adjust the burner flame using the following procedure.
a. Ensure that the Unitrol valve knob is in the OFF position. Remove the
manifold pressure tap plug and connect an accurate pressure gauge (range of
0-16″ w.c. in 0.1″ increments) or manometer.
b. Light the pilot burner (see 1.5.2) for the unit being tested and adjust the
thermostat to light the main burners.
c. The installed pressure gauge reading should be the same, ±0.1″, as that
marked on the data plate inside the door. If the pressure is correct go to
step e, if not, adjust the pressure.
d. To adjust the pressure, remove the regulator adjustment screw cover (see
Figure 1-3). Use a flat tip screwdriver to adjust the screw until the proper
pressure is reached. Turning the screw clockwise will increase the pressure,
counterclockwise will decrease the pressure.
e. When the pressure is correct, install the regulator adjustment screw cover.
f. To remove the pressure gauge, turn gas control valve to OFF. Remove the
gauge and install the pressure tap plug.
g. Now that the pressure is set for proper operation, set the main burner
flame. Unlock the air collars by loosening the set screw for the collars. See
Figure 5. Turn the Unitrol valve knob to ON and turn thermostat to light the
main burners.
h. Adjust the shape and size by raising or lowering the air collars to achieve
a soft blue flame with well defined inner cones.
i. When the flames have been properly adjusted, lock the collars in place with
the set screw provided.
1.5.4 Initial Cleaning
When the fryer is shipped, many of its parts are covered with a thin coat of
oil for protection. Before the fryer is ready for cooking it must be cleaned.
This will remove the oil coating and any foreign matter that may have
accumulated during storage and shipment. Perform the cleaning as described
below.
Figure 1-2 Gas Valve Showing Location of the Pressure Regulator and Pilot Adjusters
a. Fill the tank with water and add one packet of Pitco fryer cleaner or a
mild detergent.
b. Turn the fryer on and set the thermostat to 200°F. Allow the fryer to heat
for 15 minutes.
NOTICE
Do not leave the fryer unattended during cleaning. Never let the water level
go below the “Min Level” mark on the back of the tank.
c. Using the fryer cleaning brush, scrub the inside of the fryer to remove
protective coating.
d. When cleaning is complete, turn off the fryer main burners and turn the
Unitrol valve knob to the PILOT position. Drain the water into a container
suitable for hot water and dispose of it.
e. When the tank has cooled, rinse it thoroughly with cool water. Continue to
rinse the tank until the cleaner has been rinsed, thoroughly from the tank.
f. Using a clean dry cloth, wipe out all of the water. Be very thorough
removing the water, because any residual water will cause hot oil to splatter
out of the fryer.
CAUTION
Mild steel tanks must be wiped down/coated with oil to keep the tank from
rusting.
g. Now that the tank is clean, you are ready to fill and operate the fryer.
Refer to 2.1 for instructions on adding shortening to the fryer.
1.5.5 Thermostat Calibration Check
NOTICE
Thermostat calibration requires that the temperature of the fryer be raised
above boiling. Therefore, you will need to drain the water from the fryer and
fill it with oil. Before removing the water, perform the initial cleaning of
the fryer.
Cleaning the fryer now will prevent you from having to drain the oil and
refill with water later.
Filling the fryer with oil is described in 2.1. To perform the calibration
check detailed below you will need a digital thermometer.
a. Place the tip of the thermometer in the shortening approximately 1″ above
the temperature sensors.
b. Set the thermostat at 325°F and wait for the temperature reading on the
thermometer to rise.
As the temperature rises toward 325°F watch the thermometer closely.
c. If the shortening temperature reaches 350°F and the burners DO NOT turn
off, turn the thermostat down. Keep lowering the thermostat setting until the
burners go out.
CAUTION
If the burners do not turn off at the lowest thermostat setting, the
thermostat could be defective. Contact your representative immediately.
d. Let the fryer cycle 4 to 6 times before checking the temperature. Compare
the thermometer temperature against the thermostat setting. If the values are
more than 5°F apart, calibrate the thermostat using the appropriate
calibration procedure in this manual.
1.5.6 Thermostat Calibration
a. Place the tip of the thermometer in the shortening approximately 1″ above
the temperature sensors.
b. Set the Thermostat to 325°F and wait for the temperature reading on the
thermometer to rise.
c. Let the fryer cycle 4 to 6 times to ensure that the temperature has
stabilized. Compare the thermometer temperature against the thermostat
setting. If the values are more than 5°F apart, calibrate the thermostat using
the appropriate calibration procedure.
Chapter 2: Operating Instructions
This chapter describes how to operate your fryer to obtain the best
performance. Included in this chapter are filling, operating, and cleaning
instructions for gas fryers.
2.1 FILLING THE FRYER
Both liquid and solid shortening can be used in the fryer, but liquid is
preferred. To melt solid shortening, carefully follow the instruction in
section 2.2.2.
2.1.1 Filling the Fryer With Liquid Shortening
a. Make sure the drain valve is completely closed.
b. Fill the fryer with oil to the “Oil Level” line marked on the back of the
tank.
2.1.2 Filling the Fryer With Solid Shortening
WARNING
Never melt blocks of solid shortening on top of the burner tubes. This will
cause a fire and will void your warranty.
a. Make sure the drain valve is completely closed.
b. Remove the screen covering the tubes.
c. Cut the shortening into cubes no larger than 1″.
ALWAYS pack the shortening below, between, and on top of the burner tubes. DO
NOT leave any large air gaps. Use care when packing the solid shortening in
the tank. DO NOT bend or break the temperature sensor probes. If these are
damaged the fryer will not function properly.
d. Once the fryer is packed with shortening, the shortening must be melted. To
melt the shortening, refer to
Fryer Start-Up, section 2.2.1, and Melting Solid Shortening, section 2.2.2.
2.2 OPERATING INSTRUCTIONS
To ensure the food always comes out the very best, follow the preparation
instructions for the food you are cooking. Using the best shortening makes the
best fried foods. The best shortening will last longer than lower grade
shortening and save you money. When not in use the shortening should be cooled
and covered to prevent contamination.
CAUTION
The fryer has been installed using restraining devices to prevent accidental
tipping or movement. Do not attempt to move the fryer when it has hot liquid
in it. Splashing hot liquids can cause severe burns.
WARNING
Water and shortening DO NOT mix. Keep liquids away from hot shortening.
Dropping liquid frozen food into the hot shortening will cause violent
boiling.
2.2.1 Fryer Start-Up
DO NOT START FRYER WITHOUT FILLING WITH OIL!
a. Light the pilot light as described in section 1.5.2.
b. Turn the temperature control knob (thermostat) to the desired temperature
setting. This knob is located behind the front doors or on the front control
panel.
c. The main burners will light.
2.2.2 Melting Solid Shortening
NOTICE
The melting procedure below requires cycling of the fryer. Watch carefully for
smoke. If smoke is noticed, the shortening is scorching. To prevent this,
decrease the time you leave the burners on.
a. Place the Unitrol valve in ON position.
b. Set thermostat to 150°F.
c. Allow main burners to fire for approximately four (4) seconds.
d. Turn thermostat down until main burners go out.
e. Wait 30 seconds.
f. Repeat steps c. through e. until the shortening is melted.
g. Set thermostat to normal operating temperature. The burners will remain on
constantly until the shortening temperature reaches the thermostat setting.
h. Once at temperature, the fryer is now operating normally and ready to use.
2.2.3 Fryer Shut-Down
There are two shutdown modes of fryer operation, STANDBY and COMPLETE. The
standby mode removes the ability for the fryer’s main burners to cycle.
Complete shutdown turns off the gas supply to the fryer. Shut down the fryer
by:
STANDBY Turn the thermostat to OFF. Turn the gas valve clockwise to the PILOT position. The cooker is now in Standby and can remain this way for only brief periods of time. NEVER leave the cooker in standby overnight. COMPLETE To completely shut down the cooker, push and turn the gas valve counterclockwise to the OFF position. The fryer is now completely shut down and can be cleaned and filtered.
2.3 DAILY CLEANING
Your fryer should be cleaned every day to maintain peak performance and
appearance. Perform the procedures below every day.
a. Wipe up any shortening that spills onto the exterior of the fryer. This
should be done with
a clean soft cloth while the oil is still warm.
b. Use warm water with a mild detergent to clean surfaces. Be careful not to
get water in the shortening and to remove any detergent from the fry tank.
c. Use a non-abrasive scouring powder or pad to clean stains if necessary.
d. Perform the weekly boil out cleaning of your fryer described in section
3.2.
Chapter 3: Owner Maintenance and Adjustments
This chapter provides you with the information and procedures necessary to perform basic fryer maintenance and adjustments. If, after performing maintenance on your fryer, it does not perform properly, contact your authorized service center.
3.1 WEEKLY FRYER CLEANING (BOIL OUT)
The fryer should be thoroughly cleaned once a week. This cleaning should
include a complete draining of the fryer and a boil out.
a. You will need a container large enough to hold 1 1/2 times the oil in one
tank. This container should also be able to withstand boiling water
temperatures.
CAUTION
Completely shut down the fryer when the oil is to be replaced by water, and
when the heating portion of the cleaning is complete. This will prevent the
heating system from coming on during the oil draining and water filling
procedure.
b. Drain the oil from the fryer and discard or save for reuse. Remove tube
rack/mesh tube screens and remove any large debris from the bottom of the fry
tank. Once clean, return tube rack/mesh screens to the fry tank. Close the
drain valve and fill the fry tank with water and noncaustic detergent. For
best results, use Pitco Fryer Cleaner, part number P6071397.
c. Restart your fryer as described in 2.3 and set the thermostat to 200°F and
bring the water to a slow boil. DO NOT allow water to boil because excessive
foaming will occur. Once the water is at a slow boil turn off the fryer.
d. Allow the fryer to soak for 20 minutes to soften shortening deposits and
carbon. Use the fryer brush to remove any residue from tank, heating tubes,
and side walls. Perform the daily cleaning procedure described in section 2.6.
e. Wipe the tank dry with clean cloth wipes. Close the drain valve and remove
the large container.
f. Refer to section 2.1 to refill the fryer.
3.2 FLUE INSPECTION
It is recommended that once every six months, with the cooker cooled down, you
examine the flue area. Check for corrosion or blockage of the flue. Ensure
that the cooker is shutdown and do not turn it on during the examination.
Examination of the flue area during cooking may cause bodily injury.
3.3 TROUBLESHOOTING
This section is provided to aid you in the event of fryer or filter troubles.
If these troubleshooting procedures do not correct your problem contact a
qualified technician or the factory. The troubleshooting procedures are in a
flowchart format.
In the event of problems with or questions about you order, please contact the
Pitco Frialator factory, from 8:00 a.m. – 5:00 p.m., Eastern Standard Time,
Monday through Friday, toll-free at: (800)258-3708 US and Canada only or
(603)225-6684 World Wide
In the event of problems with or questions about you equipment, please contact
the Pitco Frialator Authorized Service and Parts representative (ASAP)
covering you area, through Pitco Frialator, Inc.
References
- Repair Your Grill: Shop Replacement Parts for 24,880 Models
- Pitco Deep Fryer Parts - Select From 19 Models
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>