PITCO 45C Plus Gas Fryers Instruction Manual

August 14, 2024
PITCO

This Owner’s Manual is provided and hosted by Appliance Factory Parts.
PITCO 45C+
Owner’s Manual
Shop genuine replacement parts for PITCO 45C+

Find Your PITCO Deep Fryer Parts – Select From 19 Models
——– Manual continues below ——–

45C Plus Gas Fryers

Installation, Operation, and Maintenance Manual
For Gas Fryers
Covering Models
45C+, 35C+

Pitco Frialator, Inc.,
P.O. Box 501, Jct I-89 & I-93 Concord, NH 03302-0501 • 509 Route 3A, Bow, NH 03304
800-258-3708603-225-6684 • FAX 603-225-8497
L20-072 Rev 5 (11/03)

NOTICES
There are three different types of notices that you should be familiar with, a NOTICE, CAUTION, and WARNING. A NOTICE is a special note used to call attention to a particularly important point.
CAUTION is used to point out a procedure or operation which may cause equipment damage. The WARNING notice is the most important of the three because it warns of an operation that may cause personal injury. Please familiarize yourself with your new cooker before operating it and heed the notices throughout this manual. The WARNINGS are listed below and on the following page for your review prior to operating the unit.

FOR YOUR SAFETY

DO NOT store or use gasoline or other flammable vapors or liquids in the vicinity of this or any other appliance.
WARNING: Improper installation, adjustment, alteration, service or maintenance can cause property damage, injury or death. Read the installation, operating and maintenance instructions thoroughly before installing or servicing this equipment.
TO THE PURCHASER
POST IN A PROMINENT LOCATION INSTRUCTIONS TO BE FOLLOWED IN THE EVENT THAT AN OPERATOR SMELLS GAS. OBTAIN THIS INFORMATION FROM YOUR LOCAL GAS SUPPLIER.
THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE

WARNING
The cooker must be electrically grounded in accordance with local codes. If local codes do not apply, follow the requirements of National Code ANSI/NFPA 70-1990.
WARNING
This cooker is equipped with a three prong safety plug. This safety plug protects operators from electrical shock in the event of an equipment malfunction.
DO NOT remove the grounding (third) prong from this plug.
WARNING
DO NOT use an open flame to check for gas leaks!
WARNING
A cooker that is equipped with casters and a flexible power cord must be connected to the gas supply with a Quick-Disconnect device. This quick disconnect must comply with ANSI Z24.41-1989. A restraining cable must be installed to limit the movement of the cooker.
WARNING
There is an open gas flame inside the cooker. The unit may get hot enough to set nearby materials on fire. Keep the area around the cooker free from combustible materials.
WARNING
Ensure that the cooker can get enough air to keep the flame burning correctly.
If the flame is starved for air it can give off dangerous carbon monoxide.
Carbon Monoxide is a clear odorless gas that can cause suffocation and death.
WARNING
Be sure the burner tubes are COMPLETELY covered with water before lighting the pilot or main burners. If the tubes are exposed, the cooker may overheat, causing damage to the kettle, creating a fire hazard, and voiding the warranty.
WARNING
Carbon monoxide can build up if the flue is blocked. Blocking the flue will also cause the cooker to overheat. Ensure that minimum clearances specified in the installation instructions are maintained. DO NOT obstruct the flow of combustion/ventilation or air opening around the Noodle Cooker. Adequate clearance around the cooker is necessary for servicing and proper burner operation. Ensure that you meet the minimum clearances specified in the installation instructions.
WARNING
The power supply must be disconnected before servicing or cleaning the appliance.
WARNING
For gas cookers, DO NOT supply the cooker with a gas that is not listed on the data plate. If you need to convert the cooker to another type of fuel, contact your dealer.
WARNING
For gas cookers, WAIT five (5) minutes before attempting to relight the pilot.
This allows time for any gas remaining in the cooker to dissipate.

THIS MANUAL MUST BE RETAINED FOR FUTURE REFERENCE

Chapter 1: General Information and Installation

Congratulations on the purchase of your new Pitco Frialator universal fryer. This unit will give you many years of reliable service if you follow the simple operation and maintenance procedures in this manual. Contained in this manual are the general installation, operation, and maintenance procedures for the universal fryer Models 45C+, 35C+ and 40C+.

1.1 WHICH FRYER DO I HAVE?
There are two models of this gas fryer available. Each fryer has its own model number. To find out which model you have, look inside the door at the equipment identification plate. This plate has a lot of useful information, but to identify which fryer you have, look at the model number block. The model number identifies which fryer you have. A brief description of each model is provided inTable 1-1.

Table 1-1 Fryer Model Information

Model Number Description Features
45C+ This Byer can cook up to 85 lbs. of potatoes per hour. Frying Area: 14″

x 14″ Oil Capacity: 42 lbs. BTU Input: 122,000
35C+| This fryer can cook up to 63 lbs. of potatoes per hour.| Frying Area: 14″ x 14″ Oil Capacity: 35 lbs. BTU Input: 90,000
| |

1.2 CHECKING YOUR NEW FRYER
Your new fryer has been carefully packed into one crate. Every effort has been made to ensure that your fryer is delivered to you in perfect condition. As you unpack your new fryer, inspect each of the pieces for damage. If something is damaged, DO NOT sign the bill of lading. Contact the shipper immediately, the shipper is only responsible for 15 days after delivery. Check the packing list enclosed with your fryer to ensure that you have received all of the parts to the fryer. If you are missing any parts, contact the dealer from whom the fryer was purchased. As you unpack the fryer and it’s accessories be careful to keep the weight of the fryer evenly distributed.

CAUTION
To prevent equipment damage, don’t tilt the fryer onto any two of it’s casters or pull the unit by the flue vents.

Locate your Pitco Frialator warranty and fill in the serial number of the fryer and the date received. You will find the serial number on the plate inside the door. Put your warranty card in a safe place for future reference. DO NOT return the card to Pitco Frialator.
1.2.1 Check Your Order
The crate containing the fryer unit will also contain the following:
(2) Pitco Cleaner Sample
(1) Drain Clean Out Rod

1.3 ASSEMBLY AND LEVELING
When you receive your fryer, it is completely assembled with the possible exception of the legs (or casters) and the heat shield. In some cases, if you have purchased a multi-fryer unit, you may need to assemble the system.
1.3.1 Leg/Caster Installation and Adjustment
Installing the legs and leveling the fryer is done with a 7/16″ wrench, socket, and a large pair of water pump pliers. The legs/casters must be installed to provide the necessary height to meet sanitation requirements and assure adequate air supply to the burner. Attach the legs by performing the following procedure.

a. Lay the fryer on its side being careful not to damage the flue by pulling on it. Protect the outside of the fryer with cardboard or a drop cloth when laying it down.
b. Attach each leg/caster with the hex head cap screws supplied with the fryer. Each leg/caster requires four 1/4-20 x 5/8″ cap screws.
c. Mount the screws from the inside of the fryer with the nut on the outside. The nuts have lock washers attached to them, therefore it is not necessary to use lock washers.
d. When all four legs/casters are mounted, stand the unit up being careful not to put too much weight on any one leg/ caster. Adjust the height and level the fryer by adjusting the leveling devices on the leg/caster with the water pump pliers.
e. On units with casters, move the fryer to the desired location and lock the wheels using the locking devices on the sides of the casters.

1.3.2 Assembling Multi Fryer Systems
If you purchased a multi-fryer unit, it could be shipped in more than one piece. To assemble the unit follow the instructions below.
a. Unpack the units and move them close together. Remove the front panels and both heat shields from the fryers.
b. There are five joining strips to be attached to the units to make them into one system. These strips are attached in the rear, front, upper front, and the forward and rear caster mount. Use the screws supplied with your system to attach the strips. Secure them tightly to each unit.
c. Replace the heat shield and front panels to complete the system assembly.

1.4 INSTALLATION
Although it is possible for you to install and set up your new fryer, it is STRONGLY recommended that you have it done by qualified professionals. The professionals that install your new fryer will know the local building codes and ensure that your installation is safe.

WARNING
The fryer must be properly restrained to prevent movement or tipping. This restraint must prevent the fryer from movements that would splash hot liquids on personnel. This restraint may be any means (alcove installation, adequate ties, or battery installation).

1.4.1 Installation Clearances
The fryer needs clearance around it for proper operation. Adequate clearances allow for servicing and proper burner operation. The clearances shown below are for cooker installation in combustible and non-combustible construction.

| Combustible Construction| Non-Combustible Construction
---|---|---
Back| 6″| 0″
Sides| 6″| 0″
Floor – Combustible| 6″| 6″

1.4.2 Gas Connection
Your fryer will give you peak performance when the gas supply line is of sufficient size to provide the correct gas flow. The gas line must be installed to meet the local building codes or National Fuel Gas Code (NFPA 54-Latest Edition) and ANSI Z223.1-Latest Edition Latest Edition. In Canada, install the fryer in accordance with CAN/CGA-B149.1 or .2 and local codes. Gas line sizing requirements can be determined by your local gas company by referring to National Fuel Gas Code, Appendix C, Table C-4 (natural gas) and Table C-16 (propane). The gas line needs to be large enough to supply the necessary amount of fuel to all appliances without losing pressure to any appliance. Other factors that are used to determine the piping requirements are BTU requirements of the appliances being connected and the length of pipe between the meter (main shut off) and the appliances.

WARNING
NEVER supply the fryer with a gas that is not indicated on the data plate. Using the incorrect gas type will cause improper operation. If you need to convert the fryer to another type of fuel, contact your dealer.
1.4.2.1 Fuel Types – Each fryer is equipped to work with one type of fuel. The type of fuel with which the appliance is intended to operate is stamped on the data plate attached to the inside of the door.

WARNING
DO NOT use an open flame to check for gas leaks!
1.4.2.2 Gas Line Connection – Connect the fryer to the gas supply line with a connector that complies with the Standard for Connectors for Movable Gas Appliances (ANSI Z21.69-Latest Edition). If you are installing a fryer with casters use a quick disconnect refer to the Quick Disconnect installation instruction, 1.4.2.3. Connect the gas line to the fryer using a pipe joint sealant that is resistant to liquefied petroleum. If the fryer was disconnected during the fuel line testing, use a solution of soap and water to leak test the new connection.

NOTICE
NEVER use an adaptor to make a smaller gas supply line fit the cooker connection. This may not allow proper gas flow for optimum burner operation, resulting in poor cooker performance.
1.4.2.3 Quick Disconnect Gas Connection – Gas fryers equipped with casters must be installed with connectors that comply with the Standard for Connectors for Movable Gas Appliances, ANSI Z21.69-Latest Edition, and Addenda Z21.69A- Latest Edition. This connection should include a quick disconnect device that complies with the Standard for Quick Disconnect Devices for Use With Gas Fuel , ANSI Z21.41-Latest Edition. When installing a quick disconnect you must also install a means for limiting the movement of the fryer. This device will prevent the gas line or the quick disconnect from being strained. The restraining device should be attached to the cooker on the back panel as shown in the illustration. The quick disconnect, hose, and restraining device can be obtained from your dealer.
1.4.2.4 Fuel Supply Line Leak and Pressure Testing – The fuel supply system must be tested before the fryer is used. If the fuel line is going to be tested at a pressure greater than (>)1/2 PSIG (3.45 kPa), make sure that the fryer is disconnected from the fuel line. If the fuel line is to be tested at a pressure equal to or less than (<) 1/2 PSIG (3.45 kPa), the fryer can be connected but the unit’s gas valve must be shut. Test all gas line connections for leaks with a solution of soap and water when pressure is applied.

1.4.3 Ventilation and Fire Safety Systems
Your new fryer must have proper ventilation to function safely and properly. Exhaust gas temperatures can reach as high as 1200°F. Therefore, it is very important to install a fire safety system. Your ventilation system should be designed to allow for easy  cleaning. Frequent cleaning of the ventilation system and the fryer will reduce the chances of fire. Table 1-2 provides a list of reference documents that provide guidance on ventilation and fire safety systems. This table is not necessarily complete.
Additional information can be obtained from the American Gas Association, 8501 East Pleasant Valley Road, Cleveland, OH 44131.
Excessive ventilation causes drafts, which will interfere with the proper operation of the pilot and the burner. Leave at least 18 inches of open space between the fryer’s flue vent opening and the intake of the exhaust hood.

CAUTION
Ensure that your ventilation system does not cause a down draft at the fryer’s flue opening. Down drafts will not allow the fryer to exhaust properly and will cause overheating which may cause permanent damage. Damage caused by down drafts will not be covered under equipment warranty. NEVER allow anything to obstruct the flow of combustibles or ventilation exiting from the fryer flue. DO NOT put anything on top of the flue area.
NOTICE
NEVER connect the blower directly to the flue openings. The direct flow of air will cause poor temperature recovery, poor ignition, inefficient operation of the fryer, and could extinguish the pilot.

1.5 INITIAL ADJUSTMENTS
After your fryer has been installed as described in section 1.4, it needs to be adjusted to ensure that it will perform as designed. These adjustments must be performed by a qualified person. To perform these adjustment the following tools will be needed:

  • Manometer (low pressure gauge)
  • DC Millivolt Meter
  • Digital Thermometer (Temperature probe)

1.5.1 Visual Checks
After the fryer is in its permanent location, lock the casters and check for levelness. Any additional leveling that is necessary can be performed as described in section 1.3.

1.5.2 Burner Ignition Systems
CAUTION
Before going any further, fill the fryer with WATER. Water is used for the installation adjustments because the temperature will never exceed 212°F (100°C) thereby allowing plenty of adjustment time. Never let the water level go below the MIN LEVEL mark on the rear of the tank.
WARNING
There is an open flame inside the fryer. The unit may get hot enough to set near by materials on fire. Keep the area around the fryer free from combustibles.

Table 1-2. Ventilation and Fire Safety References

Topic Underwriters Laboratory Document National Fuel Gas Code Document

Grease Extractor
Ventilation Hood| ANSI/UL 710-Latest Edition
ANSI/UL 705-Latest Edition| ANSI/NFPA 96-Latest Edition
ANSI/NFPA 96-Latest Edition
Type of Fire Extinguishers
and Detection Equipment
CO2
Dry Chemical
Water
Foam
Sprinklers
Smoke Detectors
Fire Detection Thermostats| ANSI/UL 154-Latest Edition
ANSI/UL 299-Latest Edition
ANSI/UL 626-Latest Edition
ANSI/UL 199-Latest Edition
ANSI/UL 268-Latest Edition
ANSI/UL 521-Latest Edition| ANSI/NFPA 12-Latest Edition
ANSI/NFPA 17-Latest Edition
ANSI/NFPA 13-Latest Edition
ANSI/NFPA 11-Latest Edition
ANSI/NFPA 13-Latest Edition
ANSI/FPA 72B-Latest Edition
ANSI/FPA 72B-Latest Edition

To light the pilot light, refer to these instructions.

WARNING
Wait 5 minutes before attempting to relight the pilot to allow for any gas in the fryer to dissipate.
a. Open the gas supply valves to the fryer.
b. Open the fryer’s door to gain access to the controls. Turn the thermostat control knob counterclockwise to the OFF position.
c. Turn the Unitrol valve knob to the PILOT position and push in on the knob. Hold the knob in for approximately one minute to purge the air out of the line. Hold a flame to the pilot light until the pilot ignites. This may take a little while the first time you light the fryer because of air in the lines. Once lit, hold the knob in for approximately 60 seconds and then release.

d. If the pilot goes out wait 5 minutes and repeat step c. If after three tries the pilot will not remain lit, refer to the operator troubleshooting section of this manual.
e. Turn the Unitrol valve knob counterclockwise to the ON position.
f. Set the thermostat control knob to the desired temperature setting.
g. The main burner will light and be controlled by the thermostat.
h. To completely shut down the fryer, turn the Unitrol valve knob to pilot, push in and continue turning to OFF.

1.5.2.1 Pilot Flame Adjustment – The pilot flame should be adjusted to produce the proper millivolt output from the pilot sensing device. Millivolt output for the thermopile should be between 300 and 500 millivolts. This procedure is only necessary on the  manual pilot ignition system. Figure 1-1 shows the pilot assembly with examples of the incorrect and correct pilot size. Example A illustrates a pilot flame size that is too small to produce sufficient millivolt output. Example B is the correct size for proper millivolt output.

a. This test requires a DC millivolt meter set to a scale of 0-1000mv.
b. Locate the thermopile wires coming from the thermostat/High Limit box going to the gas shut off valve. The wire insulation size decreases near the gas valve connections.
c. Connect the negative (-) test probe to pilot bracket.
d. Connect the positive (+) test probe to to one of the High Limit terminal connections
e. Remove the pilot flame adjustment cover.
f. Turning the flame adjusting screw clockwise lowers the flame and the millivolt output.
Turning the screw counterclockwise increases flame size and millivolt output.
g. Rotate the screw in the direction to achieve a reading of 400 ±50 mv for thermopiles.
NOTICE
Allow 3 to 5 minutes between flame adjustments to allow the reading to settle.
h. Replace the pilot flame adjusting screw cover.

1.5.3 Main Burner System
For the burners to work, the gas supply valve must be open. The main burner receives gas from the main gas supply through the thermostatically controlled valve. When the thermostat is turned up the gas control valve opens. The pilot ignites the burners. The burner flame should be adjusted at the air collar (at the bottom of the burner) so the the flame are a soft blue color without lifting off the face of the burner.
1.5.3.1 Gas Line Requirements – A properly installed gas supply system will deliver 7.0 ±2.0″ w.c. natural gas (12.0 ±2.0″ w.c. LP) to all appliances connected to the line, operating at full demand.
1.5.3.2 Burner Adjustment – The burners must be adjusted to deliver optimum flame. Adjust the burner flame using the following procedure.

a. Ensure that the Unitrol valve knob is in the OFF position. Remove the manifold pressure tap plug and connect an accurate pressure gauge (range of 0-16″ w.c. in 0.1″ increments) or manometer.
b. Light the pilot burner (see 1.5.2) for the unit being tested and adjust the thermostat to light the main burners.
c. The installed pressure gauge reading should be the same, ±0.1″, as that marked on the data plate inside the door. If the pressure is correct go to step e, if not, adjust the pressure.
d. To adjust the pressure, remove the regulator adjustment screw cover (see Figure 1-3). Use a flat tip screwdriver to adjust the screw until the proper pressure is reached. Turning the screw clockwise will increase the pressure, counterclockwise will decrease the pressure.
e. When the pressure is correct, install the regulator adjustment screw cover.
f. To remove the pressure gauge, turn gas control valve to OFF. Remove the gauge and install the pressure tap plug.
g. Now that the pressure is set for proper operation, set the main burner flame. Unlock the air collars by loosening the set screw for the collars. See Figure 5. Turn the Unitrol valve knob to ON and turn thermostat to light the main burners.
h. Adjust the shape and size by raising or lowering the air collars to achieve a soft blue flame with well defined inner cones.
i. When the flames have been properly adjusted, lock the collars in place with the set screw provided.

1.5.4 Initial Cleaning
When the fryer is shipped, many of its parts are covered with a thin coat of oil for protection. Before the fryer is ready for cooking it must be cleaned. This will remove the oil coating and any foreign matter that may have accumulated during storage and shipment. Perform the cleaning as described below.

Figure 1-2 Gas Valve Showing Location of the Pressure Regulator and Pilot Adjusters

a. Fill the tank with water and add one packet of Pitco fryer cleaner or a mild detergent.
b. Turn the fryer on and set the thermostat to 200°F. Allow the fryer to heat for 15 minutes.
NOTICE
Do not leave the fryer unattended during cleaning. Never let the water level go below the “Min Level” mark on the back of the tank.
c. Using the fryer cleaning brush, scrub the inside of the fryer to remove protective coating.
d. When cleaning is complete, turn off the fryer main burners and turn the Unitrol valve knob to the PILOT position. Drain the water into a container suitable for hot water and dispose of it.
e. When the tank has cooled, rinse it thoroughly with cool water. Continue to rinse the tank until the cleaner has been rinsed, thoroughly from the tank.
f. Using a clean dry cloth, wipe out all of the water. Be very thorough removing the water, because any residual water will cause hot oil to splatter out of the fryer.
CAUTION
Mild steel tanks must be wiped down/coated with oil to keep the tank from rusting.
g. Now that the tank is clean, you are ready to fill and operate the fryer. Refer to 2.1 for instructions on adding shortening to the fryer.

1.5.5 Thermostat Calibration Check
NOTICE
Thermostat calibration requires that the temperature of the fryer be raised above boiling. Therefore, you will need to drain the water from the fryer and fill it with oil. Before removing the water, perform the initial cleaning of the fryer.
Cleaning the fryer now will prevent you from having to drain the oil and refill with water later.
Filling the fryer with oil is described in 2.1. To perform the calibration check detailed below you will need a digital thermometer.
a. Place the tip of the thermometer in the shortening approximately 1″ above the temperature sensors.
b. Set the thermostat at 325°F and wait for the temperature reading on the thermometer to rise.
As the temperature rises toward 325°F watch the thermometer closely.
c. If the shortening temperature reaches 350°F and the burners DO NOT turn off, turn the thermostat down. Keep lowering the thermostat setting until the burners go out.
CAUTION
If the burners do not turn off at the lowest thermostat setting, the thermostat could be defective. Contact your representative immediately.
d. Let the fryer cycle 4 to 6 times before checking the temperature. Compare the thermometer temperature against the thermostat setting. If the values are more than 5°F apart, calibrate the thermostat using the appropriate calibration procedure in this manual.

1.5.6 Thermostat Calibration
a. Place the tip of the thermometer in the shortening approximately 1″ above the temperature sensors.
b. Set the Thermostat to 325°F and wait for the temperature reading on the thermometer to rise.
c. Let the fryer cycle 4 to 6 times to ensure that the temperature has stabilized. Compare the thermometer temperature against the thermostat setting. If the values are more than 5°F apart, calibrate the thermostat using the appropriate calibration procedure.

Chapter 2: Operating Instructions

This chapter describes how to operate your fryer to obtain the best performance. Included in this chapter are filling, operating, and cleaning instructions for gas fryers.
2.1 FILLING THE FRYER
Both liquid and solid shortening can be used in the fryer, but liquid is preferred. To melt solid shortening, carefully follow the instruction in section 2.2.2.
2.1.1 Filling the Fryer With Liquid Shortening
a. Make sure the drain valve is completely closed.
b. Fill the fryer with oil to the “Oil Level” line marked on the back of the tank.
2.1.2 Filling the Fryer With Solid Shortening

WARNING
Never melt blocks of solid shortening on top of the burner tubes. This will cause a fire and will void your warranty.

a. Make sure the drain valve is completely closed.
b. Remove the screen covering the tubes.
c. Cut the shortening into cubes no larger than 1″.
ALWAYS pack the shortening below, between, and on top of the burner tubes. DO NOT leave any large air gaps. Use care when packing the solid shortening in the tank. DO NOT bend or break the temperature sensor probes. If these are damaged the fryer will not function properly.
d. Once the fryer is packed with shortening, the shortening must be melted. To melt the shortening, refer to
Fryer Start-Up, section 2.2.1, and Melting Solid Shortening, section 2.2.2.

2.2 OPERATING INSTRUCTIONS
To ensure the food always comes out the very best, follow the preparation instructions for the food you are cooking. Using the best shortening makes the best fried foods. The best shortening will last longer than lower grade shortening and save you money. When not in use the shortening should be cooled and covered to prevent contamination.

CAUTION
The fryer has been installed using restraining devices to prevent accidental tipping or movement. Do not attempt to move the fryer when it has hot liquid in it. Splashing hot liquids can cause severe burns.
WARNING
Water and shortening DO NOT mix. Keep liquids away from hot shortening.
Dropping liquid frozen food into the hot shortening will cause violent boiling.

2.2.1 Fryer Start-Up
DO NOT START FRYER WITHOUT FILLING WITH OIL!
a. Light the pilot light as described in section 1.5.2.
b. Turn the temperature control knob (thermostat) to the desired temperature setting. This knob is located behind the front doors or on the front control panel.
c. The main burners will light.

2.2.2 Melting Solid Shortening
NOTICE
The melting procedure below requires cycling of the fryer. Watch carefully for smoke. If smoke is noticed, the shortening is scorching. To prevent this, decrease the time you leave the burners on.
a. Place the Unitrol valve in ON position.
b. Set thermostat to 150°F.
c. Allow main burners to fire for approximately four (4) seconds.
d. Turn thermostat down until main burners go out.
e. Wait 30 seconds.
f. Repeat steps c. through e. until the shortening is melted.
g. Set thermostat to normal operating temperature. The burners will remain on constantly until the shortening temperature reaches the thermostat setting.
h. Once at temperature, the fryer is now operating normally and ready to use.

2.2.3 Fryer Shut-Down
There are two shutdown modes of fryer operation, STANDBY and COMPLETE. The standby mode removes the ability for the fryer’s main burners to cycle. Complete shutdown turns off the gas supply to the fryer. Shut down the fryer by:

STANDBY Turn the thermostat to OFF. Turn the gas valve clockwise to the PILOT position. The cooker is now in Standby and can remain this way for only brief periods of time. NEVER leave the cooker in standby overnight. COMPLETE To completely shut down the cooker, push and turn the gas valve counterclockwise to the OFF position. The fryer is now completely shut down and can be cleaned and filtered.

2.3 DAILY CLEANING
Your fryer should be cleaned every day to maintain peak performance and appearance. Perform the procedures below every day.
a. Wipe up any shortening that spills onto the exterior of the fryer. This should be done with
a clean soft cloth while the oil is still warm.
b. Use warm water with a mild detergent to clean surfaces. Be careful not to get water in the shortening and to remove any detergent from the fry tank.
c. Use a non-abrasive scouring powder or pad to clean stains if necessary.
d. Perform the weekly boil out cleaning of your fryer described in section 3.2.

Chapter 3: Owner Maintenance and Adjustments

This chapter provides you with the information and procedures necessary to perform basic fryer maintenance and adjustments. If, after performing maintenance on your fryer, it does not perform properly, contact your authorized service center.

3.1 WEEKLY FRYER CLEANING (BOIL OUT)
The fryer should be thoroughly cleaned once a week. This cleaning should include a complete draining of the fryer and a boil out.
a. You will need a container large enough to hold 1 1/2 times the oil in one tank. This container should also be able to withstand boiling water temperatures.
CAUTION
Completely shut down the fryer when the oil is to be replaced by water, and when the heating portion of the cleaning is complete. This will prevent the heating system from coming on during the oil draining and water filling procedure.
b. Drain the oil from the fryer and discard or save for reuse. Remove tube rack/mesh tube screens and remove any large debris from the bottom of the fry tank. Once clean, return tube rack/mesh screens to the fry tank. Close the drain valve and fill the fry tank with water and noncaustic detergent. For best results, use Pitco Fryer Cleaner, part number P6071397.
c. Restart your fryer as described in 2.3 and set the thermostat to 200°F and bring the water to a slow boil. DO NOT allow water to boil because excessive foaming will occur. Once the water is at a slow boil turn off the fryer.
d. Allow the fryer to soak for 20 minutes to soften shortening deposits and carbon. Use the fryer brush to remove any residue from tank, heating tubes, and side walls. Perform the daily cleaning procedure described in section 2.6.
e. Wipe the tank dry with clean cloth wipes. Close the drain valve and remove the large container.
f. Refer to section 2.1 to refill the fryer.

3.2 FLUE INSPECTION
It is recommended that once every six months, with the cooker cooled down, you examine the flue area. Check for corrosion or blockage of the flue. Ensure that the cooker is shutdown and do not turn it on during the examination. Examination of the flue area during cooking may cause bodily injury.

3.3 TROUBLESHOOTING
This section is provided to aid you in the event of fryer or filter troubles. If these troubleshooting procedures do not correct your problem contact a qualified technician or the factory. The troubleshooting procedures are in a flowchart format.

In the event of problems with or questions about you order, please contact the Pitco Frialator factory, from 8:00 a.m. – 5:00 p.m., Eastern Standard Time, Monday through Friday, toll-free at: (800)258-3708 US and Canada only or (603)225-6684 World Wide
In the event of problems with or questions about you equipment, please contact the Pitco Frialator Authorized Service and Parts representative (ASAP) covering you area, through Pitco Frialator, Inc.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals