V-TAC 5KW Single Phase Inverter Instruction Manual

August 2, 2024
V TAC

V-TAC 5KW Single Phase Inverter

Product Information

Specifications:

  • Product: Zero-Injection Port for Single-Phase 5KW Inverter
  • Power: 5KW
  • Compatibility: Single-Phase Inverters
  • Installation Method: Manual Installation
  • Components: Zero-Injection Port, Screws, Seal

Product Usage Instructions

Safety Precautions:
To ensure safety during installation, follow these precautions:

  • Turn off all power to the inverter before starting the installation.
  • Work on an anti-static foam-covered platform to prevent electric shock.

Installation Steps:

  1. Cover your working platform with anti-static foam.
  2. Place the inverter face down on the platform and unscrew all 14 screws in an anti-clockwise direction using a cross-screwdriver.
  3. Turn the inverter face up and lift the cover board carefully, ensuring not to lift it more than 20 centimeters to avoid damaging cables.

Additional Connections:
Ensure to reconnect any additional components like RJ45 HMI and WIFI securely after installing the zero-injection port.

FAQs

  • Q: What is the purpose of installing a zero-injection port on a single-phase inverter?
    A: The zero-injection port helps prevent power injection back into the grid, ensuring compliance with regulations and reducing potential damage to equipment.

  • Q: Can the zero-injection port be installed on other types of inverters?
    A: The zero-injection port mentioned in this manual is specifically designed for single-phase 5KW inverters. It is recommended to use compatible ports for other types of inverters.

Installing Zero-Injection Port

To avoid any electric shock, cut off all power of the inverter before you commence the installation.

  1. Cover your working platform with anti-static foam and put the inverter face down on it. Using a cross-screwdriver to unscrew all 14 screws in anti-clockwise.
  2. Then put the inverter face up and lift the cover board up. Attention, you should not lift it more than 20 centimeters in case breaking cables.
  3. Disconnecting all cables in cover board and take down the cover board. Taking down the seal in CON port and install a zero-injection port on it.
  4. Re-connecting all cables.
  5. Put the inverter face-down and secure all screws. Do not crush any cable on the edge.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals