Landis Gyr Ultrawater W370, W270 Ultrasonic Water Meter Installation Guide
- July 27, 2024
- Landis Gyr
Table of Contents
- Landis Gyr Ultrawater W370, W270 Ultrasonic Water Meter
- General information
- Safety information
- Scope of delivery
- Additional elements
- Installation conditions
- Installation
- Backflow preventer
- Sealing
- Interface and Communication
- Parameterization via UltraConnect
- Automatic Commissioning
- Display
- Error messages
- Technical Data
- Specifications
- FAQ
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Landis Gyr Ultrawater W370, W270 Ultrasonic Water Meter
Note: In the following text, the term meter refers to both the cold-water meter and the hot-water meter.
General information
- The meter left the factory in a faultless condition where safety and hygiene are concerned.
- Calibration-relevant security seals on the meter must not be damaged or removed. Otherwise, the guarantee and calibration validity of the meter will lapse.
- Further technical support will be provided by the manufacturer on request.
Safety information
- The meter may only be used in building service engineering systems and only for the applications described.
- The local regulations (installation etc.) must be adhered to.
- Adhere to the operating conditions according to the dial plate during use. Non-adherence can cause hazards and the guarantee will lapse.
- In no case do any welding, drilling, or soldering near the meter.
- Do not lift the meter by the electronic unit.
- Protect the meter against damage from shocks or vibrations at the mounting place.
- Only personnel trained in the installation and operation of meters in building service engineering sys-tems, may install or remove the meter.
- The meter is suitable for drinking water. Take necessary hygiene measures during installation:
- Only remove the meter from its packaging at the mounting place.
- Wear disposable gloves.
- Clean and sanitize the relevant tools before installing the meter.
- Protect the measuring tube and thread surfaces from dirt and contact.
- Be aware of sharp edges on the thread, flange, and measuring tube.
- After installing the meter, check the leak-tightness of the system.
- As far as disposal is concerned, the meter is a waste electronic appliance in the sense of European Di-rective 2012/19/EU (WEEE) and it must not be disposed of as domestic waste. The relevant national, legal regulations must be observed as the appliance must be disposed of via the channels provided for this purpose. The local and currently valid legislation must be observed.
- You can return the lithium batteries to the manufacturer for appropriate disposal following use. When shipping please observe legal regulations, in particular, those governing the labeling and packaging of hazardous goods.
- Do not open the batteries. Do not bring batteries into contact with water or expose them to temperatures above 80 °C.
- The meter does not have any lightning protection. Ensure lightning protection via in-house installation.
Scope of delivery
- Water meter
- Operating and Installation Instructions
- 2 flat seals
- Optional backflow preventer
Additional elements
- Sealing clamp DN15
- Sealing clamp DN20
- Backflow preventer DN15
- Backflow preventer DN20
- Flat seal DN15
- Flat seal DN 20
- Meter bolting DN 15 lead-free
- Meter bolting DN 20 lead-free
Installation conditions
- Pressure class Installation position Inlet and outlet section
- MAP 16 (up to 16 bar) Optional, horizontal, or vertical U0D0 (not necessary)
- Water temperature Cold water meter T50
- 0.1…50 °C
- Water temperature Hot water meter T30/70
- 30…70 °C
Environmental conditions
- Environmental class
- O (OIML R49) for outdoor installa-tion
- Mechanical class
- M2 (MID)
- Electromagnetic class
- E1 (MID)
- Protection class
- IP68
- Max. height
- 2000 m above NN
- Operating tempera-ture
- -10 … 65 °C (with flow)
- Storage temperature
- -20 … +70 °C
- UV protection
- Stabilized
Installation
- Note: During installation, adhere to the notes from chapters 1 and 2.
- Note: Observe the dimensions of the meter and check whether there is sufficient space available.
- Note: The meter must not be exposed to stress or forces caused by pipes or fittings. If this cannot be guaranteed permanently, improve the installation site or fix the pipes, e.g. with suitable connection brackets.
To install the meter, proceed as follows:
- Close all valves before and after the mounting place.
- If necessary, remove the old meter. Collect the excess water in a suitable container.
- Remove the old sealings and residues of teflon tape and hemp.
- Clean the union nuts thread and the sealing surfaces at the screw connections.
- Install the provided sealing at the threaded connector of the meter. Check if the sealing is properly positioned and is free of damage.
- When using a backflow preventer, check its correct placement at the meter (see Chapter 7).
- Fit the meter horizontally or vertically so that the arrow on the housing and the flow direction match.
- Tighten the screw connections. Note and use the tightening torques specified in the following table and the corresponding angle from the contact of the union nut with the gasket:
Flat gasket| Novapress basic
---|---
Meter thread| ¾‘‘| 1‘‘
Tightening torque| 10 – 15 Nm| 25 – 30 Nm
Angle from contact| 45 – 60°| 45 – 60° - Pay attention to the correct placement of the union nut.
- Ensure that all connectors are tightened securely and that tthe meteris properly installed.
- Open all valves before and after mounting place andpreventt theinstallation.
- Check the installation for leakage.
- Seal the screw connection to protect it against manipulation(see chapter 8).
Backflow preventer
Sealing
Interface and Communication
The meter is equipped with an NFC interface according to ISO/IEC 14443 standards.
Parameterization via UltraConnect
The meter can be read out and parameterized via the UltraConnect App. Further information can be found in the meter‘s Technical Description.
Automatic Commissioning
Note: The meter can be activated manually via the UltraConnect app. Further information can be provided on request.
- The meter automatically starts measuring and communicating when the measuring tube is filled with water.
- The display SLEEP changes to a regular display.
- With the display indicates the correct flow direction, and the flow display shows the current flow rate.
Display
Note: To prevent reading errors, the decimal places of the values displayed are superscripted.
Error messages
The meter continuously runs a self-diagnosis and can thus recognize and display various error messages.
Technical Data
Note: The information on the meter must be observed!
Metrology
- Measuring accuracy Class 2 (OIML R49)
- Measuring range R250 (optional: R400, R160)
- Temperature class T50 (cold water), T30/70 (warm water)
- Measure interval 1 Hz
Installation
- Pressure class MAP 16 (bis 16 bar)
- Installation position Optional, horizontal, or vertical
- Filter Standard
- Backflow preventer Optional
Environmental Conditions
- Environmental class O (OIML R49) for outdoor installa-tion
- Mechanical class M2 (MID)
- Electromagnetic class W270 E1 (MID); W370 E2 (MID)
- Safety class IP68
- Max. height 2000 m above NN
- Ambient temperature -10 … 65 °C (with running water)
- Storage temperature -20 … +70 °C
- UV protection Stabilized
Power supply
- Power supply type Battery for 15 years (+2 years storage time)
- Battery type D-cell Lithium
- Lithium content 5 g per battery
- Number of batteries 1
Communication
- Available Communication type LoRa ®/wM-Bus or NB-IoT
- App Support Yes (Service Software App, Info Finder App)
Specifications
- Pressure class : MAP 16 (up to 16 bar)
- Installation position : Optional, horizontal, or vertical
- Cold water meter : T50
- Hot water meter : T30/70
- Environmental class: O (OIML R49) for outdoor installation
- Mechanical class : M2 (MID)
- Electromagnetic class: E1 (MID)
- Protection class : IP68
- Max. height: 2000 m above NN
- UV protection: Stabilized
FAQ
Q: Can the meter be disposed of as domestic waste?
A: No, the meter is considered a waste electronic appliance and must be
disposed of following relevant national, legal regulations for electronic
waste disposal.
Q: What should be done with the lithium batteries used in the meter?
A: The lithium batteries can be returned to the manufacturer for
appropriate disposal following use. When shipping, observe legal regulations
for hazardous goods packaging and labeling.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>