R AND R MANUFACTURING NC000MAM Plastic Mailbox Installation Guide
- July 25, 2024
- R AND R MANUFACTURING
Table of Contents
R AND R MANUFACTURING NC000MAM Plastic Mailbox Installation Guide
Installation Instructions
Buy it.
No holes to dig, no cement, and no special tools.
Place it.
Find a 30″ diameter area of relatively flat space and place your mailbox.
Create a flat surface if needed.
Fill it.
Open the mailbox door and remove the plastic bottom. Use a cup to fill the
hollow pedestal with approximately 80 pounds of ballast. We recommend using
sand or gravel. DO NOT use water.
Adjust it.
Fill the ballast to the white line in the picture above and adjust the
placement of your mailbox if needed.
260-244-5621 | R&R Manufacturing | info@rrmailboxes.com
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>