Telbix SEGOVIA PE1-CH Segovia LED Pendant Light Installation Guide
- June 12, 2024
- Telbix
Table of Contents
Telbix SEGOVIA PE1-CH Segovia LED Pendant Light
Installation Instructions
IMPORTANT: Must be installed by a qualified electrical contractor. Install in accordance with AS/NZS3000.
Product Diagram
The diagram presents an electronic device with specific operational steps and indications:
- Section A: Shows an ‘OFF’ position with an arrow pointing downwards towards a series of switches, suggesting that these switches should be in the off position.
- Section B: Displays the internal mechanics of the device, highlighted with red lines and a circle indicating key components or areas for attention during installation or maintenance.
- Section C: Shows an ‘ON’ position with an arrow pointing upwards towards the series of switches, indicating that these switches should be turned on after installation or maintenance is completed.
Specifications
Protection Class | IP20 |
---|
- 240V~50Hz 1x5W LED
FAQ
- Who should install the SEGOVIA PE1?
- The device must be installed by a qualified electrical contractor.
- What standards should the installation comply with?
- Installation must comply with the AS/NZS3000 standards.
- What does IP20 mean in the specifications?
- IP20 is a protection class indicating that the device is protected against solid objects larger than 12mm but not protected against water.
Note: The product diagram also includes some incomprehensible characters “7_)[Y8-&%” which do not seem to convey any meaningful information and could be a misprint or error.
Read User Manual Online (PDF format)
Loading......