betta VEUE | Straight Drop Installation Guide

June 3, 2024
betta

betta VEUE | Straight Drop

betta VEUE Straight Drop-fig1

TOOLS AND ADDITIONAL ITEMS REQUIRED

PART A – TOOLS REQUIRED

  • Saw
  • Saw
  • Drill
  • Screw Driver – Philips Head & Flat Head
  • Jaw Pliers
  • Allen Key Set
  • Mallet
  • Scissors

PART B – ADDITIONAL ITEMS REQUIRED (NOT SUPPLIED)
To install a VEUE | Straight Drop, the following non-stocked items are required:

  • Fixings for Box/Open Brackets/Hardware (ensure appropriate fixings are used to suit application)
  • Trims to conceal packing (if required)

PART C – BLIND ITEMS REQUIRED

betta VEUE Straight Drop-fig2
betta VEUE Straight Drop-fig3

INSTALLATION

PART A – PREPARING INSTALLATION SPACE
  • STEP 1. – CHECK FOR OBSTRUCTIONS
    Check for any obstructions that may interfere in installation.

  • **STEP 2. – CHECK VERTICAL & HORIZONTAL INSTALLATION DIMENSIONS

**betta VEUE Straight Drop-fig4
Check if top of installation space is level. • If H1 ≠ H2, corrective actions may need to be considered prior to installation

PART B – BOX INSTALLATION
  • STEP 1 – INSTALL BOX TO WALL/CEILING

betta VEUE Straight Drop-fig5
NOTE:
Use appropriate fixings to suit application. Ensure Box is Aligned and Level. Ensure 2 fasteners are used per side.

PART C – OPEN BRACKET INSTALLATION

  • STEP 1 – INSTALL BRACKETS TO WALL/CEILING

betta VEUE Straight Drop-fig6
NOTE:

  * Use appropriate fixings to suit application. Ensure Box is Aligned and Level. Ensure 2 fasteners are used per side.
  * Ensure brackets are aligned and level.
  * Measure brackets end to end to confirm measurement is correct.
PART D – BLIND INSTALLATION
  • **STEP 1 – INSERT BLIND INTO BOX

**betta VEUE Straight Drop-fig7
User effort will be required to push the booster head/Idler pin into the adapter, a noticeable “click” will indicate that the component is correctly located.

  • STEP 2 – INSERT RETAINER CLIP MKII ONTO IDLER ADAPTER
    IDLER END **

betta VEUE Straight Drop-fig8

**

  • **STEP 3 – FEED THROUGH MOTOR CABLE (FOR MOTOR ONLY)

**

  • STEP 4 – RUN BLIND DOWN + CENTRE
    • For motor operation, ensure wiring is correct and motor is operating correctly. For gear operation, ensure operation is smooth.
    • Ensure the fabric is centered.
    • Once blind is operating correctly, proceed to the next step.

betta VEUE Straight Drop-fig10

PART E – LOCK OFF SS SADDLES & ATTACH DIAMOND EYE PAD
  • OPTION 1 – CLIP
    • STEP 1 – UNLOCK SADDLES AND SLIDE TO REQUIRED POSITION (SUGGESTED 100MM NOMINAL FROM END CAP), LOCK BOTH SADDLES TO THE BOTTOM RAIL
    • STEP 2 – ATTACH THE DIAMOND EYE PAD DIRECTLY BELOW SWIVEL EYE SHACKEL WITH APPROPRIATE SCREWS

betta VEUE Straight Drop-fig11

PART F – INSERT BOX / COVER
  • **STEP 1 – INSERT BOX 120 COVER AS SHOWN, SUPPORT THE EXTRUSION AS REQUIRED TO ENSURE SMOOTH ENGAGEMENT

**betta VEUE Straight Drop-fig12

  • **STEP 2 – SECURE COVER AT BOTH ENDS


Note:** It is recommended that the Box Cover be fixed to ensure it is not accidentally dislodged.

PART G – INSTALLED STRAIGHT DROP

BOX

OPEN

TROUBLESHOOTING

betta VEUE Straight Drop-fig16

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals