BFT STOPPY B 115 500 Automatic Retractable Bollard Instruction Manual
- June 3, 2024
- BFT
Table of Contents
STOPPY B 115/500
STOPPY B 200/700 INSTRUCTIONS FOR INSTALLATION,
USE AND MAINTENANCE
AUTOMATIC BOLLARD
GENERAL
The deterrent bollard is the ideal solution for managing vehicle traffi c in compliance with modern urban furnishing requirements. It can be used to contol entrances or tosafeguard private areas in total safety.
TECHNICAL SPECIFICATIONS
Motor……………………….230V±10% 50÷60Hz 300W 10uF 1,4 A
Working frequency……………………………………………………500/24h
Protection level…………………………………………………………………IP67
Control unit……………………………….PERSEO CBD / PERSEO CBE
Working temperature……………………………………-40 +60 °C
Working time…………………………..6 s. ** (STOPPY B 115/500) 9 s. (STOPPY B
200/700)
Net weight…………………………………..57 kg (STOPPY B 115/500) 103 kg (STOPPY B 200/700)
Gross weight………………………………60 kg (STOPPY B 115/500) 115 kg (STOPPY B 200/700)
** With integrated heater active (PERSEO CBE)
*** At 25 °C ambient temperature
OVERALL SIZE DIMENSIONS
WIRING NOTE
1 | Single-phase line – | HO5VV2 x 1,5 +T |
---|---|---|
2 | Receiver | 4x 0,5 |
3 | Push button panel | 4x 0,5 |
4 | Flasher | 2x 0,5 |
5 | Key selector | 2x 0,5 |
6 | STOPPY B 115/500 | |
STOPPY B 200/700 | Cables supplied by us 10m | |
7 | Magnetic detector – | RG58 |
8 | Trasmitter photocell | 2x 0,5 |
9 | Receiver photocell | 4x 0,5 |
10 | Traffic light | 3×0,5+T |
LAYOUT
A | Road surface |
---|---|
B | Cement |
C | Sheathing 050 – |
D | Compact sand |
E | Fine sand |
F | Pebble gravel |
G | Drainage 0125 |
I | Connection to the sewer network |
FOUNDATION
DRAINAGE
P | STOPPY B 115/500 | 970 mm |
---|---|---|
STOPPY B 200/700 | 1180 mm |
4 – STOPPY B 115/500 – STOPPY B 200/700
** Ensure that the soil has a adequate water absorption by entering about
40 liters of water and checking that the emptying takes place in less than 30
minutes; otherwise realize the drainage of water through pipes connected to
every single manhole and connected to a drainage pipe, or a collecting sump
with a drainage system of water.
FIT THE BOLLARD**
Running direction
FILL WITH SAND TO ~200 MM FROM THE ROAD SURFACE
Protect with tape the opening where the cables are fed
LAY THE ELECTROWELDED MESH AND FILL WITH CONCRETE
FLOORING COMPLETION
ELECTRICAL CONNECTIONS
-
PERSEO CBD
**** Isolate unused cable
Consult the PERSEO CBD control unit’s installation and operating manual. -
PERSEO CBE Isolate unused cable
Consult the PERSEO CBE control unit’s installation and operating manual.
STARTING THE DEVICE
EMERGENCY RELEASE,
INSTALLER——-
DATE———————
www.bft-automation.com
BFT Spa
Via Lago di Vico, 44 ITALY 36015 Schio (VI)
T +39 0445 69 65 11
F +39 0445 69 65 22
UNITED KINGDOM
BFT AUTOMATION UK LTD
Unit C2-C3 The Embankment Business Park,
Vale Road Heaton Mersey Stockport Cheshire SK4 3GLUnited Kingdom
BFT AUTOMATION (SOUTH) LTD Enterprise House Murdock Road, Dorcan,
Swindon, England, SN3 SHY
Caution! Read “Warnings” inside carefully!
AZIENDA CON
SISTEMA DI GESTIONE
CERTIFICATO DA DNV GL
= ISO 9001=
= ISO 14001=
Documents / Resources
| BFT
STOPPY B 115 500 Automatic Retractable
Bollard
[pdf] Instruction Manual
STOPPY B 115 500, Automatic Retractable Bollard, STOPPY B 115 500 Automatic
Retractable Bollard, Retractable Bollard, Bollard
---|---