GENESIS Irid 300 Gaming PC Case Installation Guide
- October 27, 2023
- Genesis
Table of Contents
Irid300
Quick installation guide
GAMING PC CASE
Specification
Material | SPCC Steel, ABS |
---|---|
Motherboard Support | ATX, micro- ATX, mini-ITX |
3,5″ HDD Bays | 3 |
2,5″ SSD Bays | 2 |
I/O Connctors | USB 3.0 x1, USB 2.0 x2, HD Audio Jack x2, Fan Control |
Expansion Slots | 7 |
Cooling Suport | max. 7 |
Front | 120mm x3 (3x LED installed), 360mm radiator support |
Rear | 120mm x1 (1x LED installed) |
Top | 120mm x3 (optional) |
PSU Mounting / Standard | Bottom, ATX |
Max. CPU Cooler height | 163 mm |
Max. GPU Lenght | 415 mm |
Cable Management | 18mm clearance behind motherboard tray |
Dust Filters | Bottom, Top |
Weight: | 6,3 Kg |
Dimensions (LxWxH) | 466 x 212 x 467mm |
Warranty
2 years limited manufacturer warranty
Safety information
- For intentional purpose only
- Non-authorized repairs or taking the device to pieces make the warranty void and may cause the product damage.
- Avoid to hit or friction with a hard object, otherwise it will lead to grind surface or other hardware damage.
- Do not use the product in low and high temperatures, in strong magnetic felds and in the damp or dusty atmosphere.
- Do not drop, knock, or shake the device. Rough handling can break it.
- Slots and openings in the case are provided for ventilation and should not be obscure. Blocking the vents can cause overheating of the device.
General
- The safe product, conforming to the eu requirements.
- The product is made in accordance with RoHS european standard.
- The WEEE symbol (the crossed-out wheeled bin) using indicates that this product in not home waste. Appropriate waste management aids in avoiding consequences which are harmful for people and environment and result from dangerous materials used in the device, as well as improper storage and processing. Segregated household waste collection aids recycle materials and components of which the device was made. In order to get detailed information about recycling this product please contact your retailer or a local authority.
PACKAGE CONTENTS
Installation
Photo 1-3. Fan Installation: Remove front panel by gently pulling, and unscrew side pannel. Install fans accordingly using screws. Fan airflow orientation as on picture 3.
Photo 4-6. SSD Installation: Put SSD in designated area, then fix it by screws. Side-cover is necessary to be removed.
Photo 7-10. HDD Installation: HDD designated area instalation. Fix 2 supporting screws on left side of HDD. Install HDD in HDD tray. Fix right HDD side by screws.
Photo 11-13 Front panel I/O ports installation: Connect front panel I/O connectors to motherboard according to motherboard manual.
www.genesis-zone.com
product & support information | please scan qrcode |
http://genesis-zone.com/?p=5284
© GENESIS. All rights reserved. GENESIS name and logo, and all related product and service names, design marks and slogans are the trademarks or registered trademarks of GENESIS. All other product and service marks contained herein are the trademarks of their respective owners.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>