Technical specifications

BODENSTECKDOSEN-SYSTEMTECHNIK-76-A-Series-Wall-
Distributor-fig-1

76 A-Series

The 7602A floor socket is shown as an example. The installation principle applies to all floor sockets from the 76 A-Series: 7601A, 7602A, 7604A .BODENSTECKDOSEN-SYSTEMTECHNIK-76-A-Series-Wall-Distributor-
fig-2

Designation:

  •  Lid
  • Device carrier
  •  Frame
  • Housing
  •  Attachment tube (2 Stück/Pieces →Zubehör/Parts)
  •  Cable glands Parts

Assembly Instructions

  • Step 1
    Remove the lid and dismantle the device carrier from the housing. Then attach the cable glands.

  • Step 2 (Preparations)
    Before paving, determine the installation position for the floor socket and lay the flexible cables (L) in the gravel(SP) to this position .BODENSTECKDOSEN-SYSTEMTECHNIK-76-A-Series-Wall-Distributor-
fig-3

  • Step 3
    Lay the floor covering(B) (paving stones) up to the installation position of the floor socket and use the floor socket as a placeholder. Alternatively, cut a polystyrene placeholder in the size of the installation dimensions of the floor socket.BODENSTECKDOSEN-SYSTEMTECHNIK-76-A-Series-Wall-Distributor-
fig-4

  • Step 4
    Then lay the row of paving stones to the end, remove the floor socket/the placeholder and pour a bed of mortar(M) at the installation position on the compacted subsurface (K) (e. g. gravel)BODENSTECKDOSEN-SYSTEMTECHNIK-76-A
-Series-Wall-Distributor-fig-5

  • Step 5
    Then insert the flexible cables (L) through the cable glands into the housing and insert the floor socket into the mortar bed (M).BODENSTECKDOSEN-
SYSTEMTECHNIK-76-A-Series-Wall-Distributor-fig-6

  • Step 6
    Before the mortar (M) hardens, check the position of the floor socket with the spirit level (W).Attention: The height of the mortar bed (M) must be measured so that the floor socket and the covering (B) are flush (are in alignment)

  • Step 7
    After the mortar (M) has hardened, connect the sockets and mount the device carrier in the housing. Then cut the recesses for the flexible cables (L) and forthe cable glands in the stones so that they can be laid flat on the floor socket without damaging the cables (see figure below and opposite view on the right).BODENSTECKDOSEN-SYSTEMTECHNIK-76-A-Series-Wall-Distributor-
fig-8

  • View from the opposite side.BODENSTECKDOSEN-SYSTEMTECHNIK-76-A-Series-Wall-Distributor-fig-9

  • Step 8
    Continue paving. The floor socket is now successfully installed .BODENSTECKDOSEN-SYSTEMTECHNIK-76-A-Series-Wall-Distributor-
fig-10

Instructions for use

  •  Connection, repair or maintenance must be carried out by a trained specialist. During installation and commissioning, gloves must be worn.
  •  For the installation of the floor socket, a solid surface (for example screed, concrete, wooden floorboards) must be present.
  •  When installed on an unpaved (unstable) surface, the product is neither walkable nor accessible.
  •  The connecting cable must have a cross-section in accordance with the VDE regulation. In addition, flexible cables must be used so that the protection class can be guaranteed.
  •  If cable glands are used, they should be suitable for the corresponding cable cross-section and have an appropriate degree of protection (IP68 for outdoor use).
  •  It must not be installed in a recessed area where rainwater could collect.
  •  Care instructions: The product is suitable for wet care. This also includes the use of wet sweepers in which the floor covering is briefly soaked. However, no acid-, chloride-containing or alkaline products may be used for cleaning. Cleaning the floor socket with a high pressure cleaner is not permitted.
  •  The specified protection class can only be guaranteed if the floor socket is in perfect and closed condition.
  •  The attachment tube serves as rain protection. When using the attachment tube, make sure that the tube grips completely into the existing seal when it is screwed in.
  •  Despite manufacturing inspection, sharp edges or corners on housings, lids, or other components may occur during the manufacturing process.
  •  In the case of mechanical damage or other defects (technical/electrical), it is not allowed to be put the product into operation.
  •  The product is in compliance with the national regulations to dispose.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals