Next Century 3rd Party Cable Sub Metering Solutions User Guide
- June 5, 2024
- Next Century
Table of Contents
Next Century 3rd Party Cable Sub Metering Solutions
Upgrade to NextCentury
Follow these simple steps to properly connect 3 Party Data Receivers to your new NextCentury Gateway.
-
Locate Connected Receiver(s)
Receivers are typically mounted on a wall in the same room as the network equipment. -
Disconnect the Power Supply
Unplug the data collector from power, keeping all devices powered off until the installation is complete. -
Remove Old Cable
The old wires connecting to the receiver are no longer needed and should be completely disconnected and set aside.
**Connect 3 rd Party Cable
**
Connect the 3 Party Cable to your Gateway, and attach the other end of the
cable to the 4-pin connector on your 3-party receiver. Ensure the text “This
Side Up” is viewable when connected. Use the included adhesive tab to secure
the connection. For dual receiver systems, repeat this step on the second
receiver.
Power-On the Gateway
Power is now supplied to the 3 party receiver from the Gateway. You may now proceed to program the property.
Programming the Property
Installation and 3-party programming resources can be found at: products.nextcenturymeters.com/upgrade.
Contact Information
- Phone: 844.538.8203 opt. 2
- Email: support@nextcenturymeters.com.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>