EMERSON Rosemount Ultrasonic Flow Meters Instruction Manual
- June 4, 2024
- Emerson
Table of Contents
EMERSON Rosemount Ultrasonic Flow Meters
Safety and approval information
- This Rosemount product complies with all applicable European directives when properly installed in accordance with the instructions in this manual. Refer to the EU declaration of conformity for directives that apply to this product. The EU declaration of conformity, with all applicable European directives, and the complete ATEX Installation Drawings and Instructions are available on the internet at www.emerson.com or through your local Emerson support center.
- Information affixed to equipment that complies with the Pressure Equipment Directive, can be found on the internet at http://www.emerson.com.
- For hazardous installations in Europe, refer to standard EN 60079-14 if national standards do not apply.
Other information
Full product specifications can be found in the product data sheet.
Troubleshooting information can be found in the user manual. Product data
sheets and manuals are available from the Emerson website at
http://www.emerson.com.
Return policy
Follow Emerson procedures when returning equipment. These procedures ensure
legal compliance with government transportation agencies and help provide a
safe working environment for Emerson employees. Emerson will not accept your
returned equipment if you fail to follow Emerson procedures. Return procedures
and forms are available on our web support site at Emerson.com, or by phoning
the Emerson Customer Service department.
Emerson Flow customer service
- Email:
- Worldwide: http://flow.support@emerson.com
- Asia-Pacific: http://APflow.support@emerson.com
- ****Telephone:
North and South America | Europe and Middle East | Asia Pacific |
---|---|---|
United States | 800 522 6277 | U.K. |
Canada | +1 303 527 5200 | The Netherlands |
099 128 804
Mexico| +41 (0) 41 7686 111| France| 0800 917 901| India| 800 440 1468
Argentina| +54 11 4837 7000| Germany| 0800 182 5347| Pakistan| 888 550 2682
Brazil| +55 15 3413 8000| Italy| 8008 77334| China| +86 21 2892 9000
| | Central & Eastern| +41 (0) 41 7686 111| Japan| +81 3 5769 6803
Russia/CIS| +7 495 981 9811| South Korea| +82 2 3438 4600
Egypt| 0800 000 0015| Singapore| +65 6 777 8211
Oman| 800 70101| Thailand| 001 800 441 6426
Qatar| 431 0044| Malaysia| 800 814 008
Kuwait| 663 299 01| |
South Africa| 800 991 390
Saudi Arabia| 800 844 9564
UAE| 800 0444 0684
Introduction
Purpose
This document shall identify specific installation and operation instructions
necessary to ensure compliance with the Essential Safety Requirements (ESR) of
the European Economic Area Pressure Equipment Directive (PED) 2014/68/EU and
the UK Pressure Equipment (Safety) Regulations 2016.
Scope
Document scope
This document applies to Rosemount Ultrasonic Flow Meters designed by Micro
Motion, Inc. of Boulder, Colarado, USA, and manufactured by Emerson or an
authorized agent.
Installation
Meter installation
Rosemount Ultrasonic Flow Meters are supplied as components to be installed in
the end user’s piping system. It is the responsibility of the end user of the
equipment to ensure compliance with the Essential Safety Requirements of the
Directive and Regulations quoted in Purpose of this document. Relevant parts
of the directive ESR are listed below.
PED ESR reference | ESR requirement | Compliance requirement |
---|---|---|
2.3 | Provisions to ensure safe handling and operation: |
• The method of operation specified for pressure equipment must be such as to preclude any reasonably foreseen risk in the operation of the equipment. Particular attention must be paid, where appropriate, to the following.
|
PED ESR reference| ESR requirement| Compliance requirement
---|---|---
| Closures and openings| Rosemount Gas Ultrasonic Flow Meters:
• During removal and replacement of transducers the end user shall ensure that the meter has been properly isolated and the internal pressure has been safely vented.
• If changing the transducers under line pressure by means of the Rosemount supplied extractor tool; the instructions for use given in the manual supplied with each extractor tool must be strictly complied with.
Rosemount Liquid Ultrasonic Flow Meters:
• Refer to the Rosemount Ultrasonic Flow Meter Installation, Maintenance and Troubleshooting manuals for detailed procedures.
• Rosemount Liquid Ultrasonic Flow Meters are supplied with transducers which are extractable while the line is pressurized.
PED ESR reference | ESR requirement | Compliance requirement |
---|---|---|
• Devices to prevent physical access while pressure or a vacuum exists. |
• Surface temperature
• Decomposition of unstable fluids
| • The end user shall ensure that the meters are installed in a properly designed system with access limitation in place if required.
• It is the responsibility of the end user to assess the expected surface temperature in service, and if necessary, take the necessary precautions to avoid personnel coming into contact with the equipment.
• It is not envisaged that, for the designed service, the equipment shall come into contact with unstable fluids. However, the end user should assess the risk and take any steps considered necessary.
2.4| Means of examination:
• Pressure equipment must be designed and constructed so that all necessary examinations to ensure safety can be carried out.
| • Rosemount Ultrasonic Flow Meters are designed so that all critical
parts can be examined without the need to remove the unit from service. The
end user should refer to the operations and maintenance instructions supplied
with each meter. It is not considered that the process medium for which the
equipment is designed will give rise to severe corrosion/erosion problems. It
is the end user’s responsibility to monitor any change in the process medium
that may cause concern.
2.5| Means of draining and venting:
• To avoid harmful effects such as water hammer, vacuum collapse, corrosion and uncontrolled chemical reactions.
| • It is the responsibility of the end user to ensure that the equipment
is installed in a well-designed piping system to avoid such hazards.
PED ESR reference| ESR requirement| Compliance requirement
---|---|---
2.6| Corrosion or other chemical attack| • It is not expected that the
process medium for which the meters are designed will give rise to severe
corrosion problems. It is the end user’s responsibility to monitor any change
in the process medium that may cause concern.
2.7| Wear| • It is not expected that the use of the meter for fluid
measurement will give rise to any abnormal wear problems. It is the
responsibility of the end user to install any necessary filtration upstream of
the meter to maintain the condition of the process medium.
2.10| Protection against exceeding the allowable limits of the pressure
equipment| • The Rosemount Ultrasonic Flow Meters must be installed in a
well-designed piping system with adequate protection against excessive
pressure.
2.12| External fire| • The Rosemount Ultrasonic Flow Meters have no special
accessories for fire damage limitation. It is the responsibility of the end
user to provide adequate fire-fighting facilities on- site.
7.3| Pressure limiting devices, particularly for pressure vessels| • The
Rosemount Ultrasonic Flow Meters are not pressure vessels and have no integral
pressure limiting devices. It is the responsibility of the end user to ensure
that the meters are installed in a well-designed system so that momentary
pressure surges are limited to under 10% of the meters maximum allowable
pressure.
ABOUT COMPANY
- For more information: Emerson.com
- ©2022 Emerson. All rights reserved.
- Emerson Terms and Conditions of Sale are available upon request. The Emerson logo is a trademark and service mark of Emerson Electric Co. Rosemount is a mark of one of the Emerson family of companies. All other marks are the property of their respective owners.
References
- Emerson Global | Emerson
- Emerson Global | Emerson
- Rosemount | Emerson US
- Emerson Global | Emerson
- Emerson Global | Emerson
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>