DELTA THERM KIT-DSR-DRD Roof Gutter Cables Instructions
- June 6, 2024
- DELTA-THERM
Table of Contents
DELTA THERM KIT-DSR-DRD Roof Gutter Cables
Product Information
Specifications
- Dimensions:
- Length: 1679.6 mm (66 1/8 in)
- Width: 611.3 mm (24 1/16 in)
- Height: 355 mm (14 in)
- Diameter: 1504.8 mm (59 1/4 in)
- Material included:
- A – Half section of the central ring: 2 Qty
- B – Blade: 6 Qty
Product Usage Instructions
Installation Instructions
- Remove all sharp objects from the surface to be heated. Clean and degrease the surface.
- If installing on a roof with gravel, remove the gravel to allow for close application of the KIT-DSR-DRD to the roof.
- Use original Delta-Therm accessories for the heating circuit installation as per Delta-Therm instructions.
- Maintain a minimum bend radius of 1 in. (25 mm) with all cables.
- NEVER turn on damaged heating circuits.
Installation Steps
- Assemble the central ring one side at a time, ensuring proper insertion (a click should be heard).
- Insert the self-regulating heating cable into the first of the 6 blades and secure the cable by bending one edge at a time.
- Perform a round trip with the cable, penetrating at least 12 in. (305 mm) inside the roof drain.
- Bend the edges of the blades to the bottom to stabilize the cable.
CAUTION: Install the roof drain strainer before installing the self- regulating heating cable.
Optional Installation Step
If there is a risk of movement post-installation, secure the KIT-DSR-DRD with a roofing adhesive approved by the membrane manufacturer.
FAQ
Q: What codes must be met during installation?
A: Installation must meet requirements of the Canadian Electrical Code (CSA C22.1 Part 1), National Electrical Code (NFPA 70), and any other applicable local and/or national code.
Q: What should be done if there is a risk of movement post-installation?
A: Secure the KIT-DSR-DRD with a roofing adhesive previously approved by the membrane manufacturer.
INSTRUCTIONS – KIT-DSR-DRD
THE INSTALLATION MUST BE EXECUTED BY A QUALIFIED TECHNICIAN RISK OF ELECTROCUTION
- Read carefully these instructions before installation, and operation of the heater.
- Failure to adhere to the instructions could result in fire, electric shock, serious personal injury, and death or property damage.
- Review frequently for continuing safe operation and instruction of future users, if necessary.
IMPORTANT INSTRUCTIONS
- Where applicable, installation must meet the requirements of the following codes.
- Canadian Electrical Code (CSA C22.1 Part 1)
- National Electrical Code (NFPA 70)
- Any other applicable local and/or national code
- Where required by law, this product must be installed by a qualified person.
- ATTENTION: This product must be installed with a ground fault equipment protector (GFEP).
- Use only listed conduits, fittings and other components.
- Use the self-regulating heating cable according to the instructions available on www.delta-therm.com.
WARRANTY
Please refer to the product sheet at www.delta-therm.com.
Global view
Dimensions
Material included
Item | Description | Qty |
---|---|---|
A | Half section of the central ring | 2 |
B | Blade | 6 |
INSTALLATION INSTRUCTIONS
- Remove all sharp objects from the surface to be heated.
- Clean and degrease the surface.
- For installation on a roof with gravel, remove the gravel so that the KIT-DSR-DRD can be applied as close as possible to the roof.
- Control and accessories: The installation of a heating circuit must be performed using original Delta-Therm accessories, under the Delta-Therm installation instructions.
- Maintain a minimum bend radius of 1 in. (25 mm) with all cables.
- NEVER turn on damaged heating circuits.
- Assemble the central ring one side at a time (Fig. 1) and make sure that each part is properly inserted into the other half-section (normally a click is heard).
- Position the central ring so that it is centred with the roof drain (Fig. 2).
- Take each of the 6 blades and insert them into the male part of the central ring (Fig. 3) and make sure that each blade is properly inserted into the central ring (normally a click is heard).
- Insert the self-regulating heating cable into the first of 6 blades (Fig. 4) and bend one edge at a time to secure the cable (Fig 6). Do not bend the edge all the way to allow for adjustments with the self-regulating heating cable as needed.
- Perform a round trip with the self-regulating heating cable (Fig. 4) and penetrate at least 12 in. (305 mm) inside the roof drain.
- CAUTION: At this step, if you have a roof drain strainer, it must be installed before installing the self-regulating heating cable.
- When the installation of the self-regulating cable in the 6 blades is complete, be sure to bend the edges of the 6 blades to the bottom to stabilize the self-regulating heating cable.
OPTIONAL DURING INSTALLATION
- If you feel that there is a risk that the KIT-DSR-DRD may move after installation, you can secure it with a roofing adhesive previously approved by the membrane manufacturer.
- Delta-Therm can’t be held responsible for any damage that may be caused to a roofing membrane following the installation of KIT-DSR-DRD.
Use the following method after performing steps 1 to 5:
- Lift the outer end of the blade then apply adhesive directly to the roof. Make sure the adhesive is under the blade (Fig. 7).
- Apply sufficient pressure with your hands so that the adhesive is in good contact with the roof surface.
- Repeat this operation on each of the 5 remaining blades (Fig. 8).
- WARNING: Use only roofing adhesive previously approved by the manufacturer of the roof membrane for your installations.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>