SOUND TOWN SDRK-SDF2 Studio Desk Workstation Instruction Manual
- June 1, 2024
- Sound Town
Table of Contents
SOUND TOWN SDRK-SDF2 Studio Desk Workstation
MODEL:
- SDRK-SDF2 FINISH Golden Oak
- SDRK-SDF2B Weathered Brown
- SDRK-SDF2CB Carbonized Bamboo
IMPORTANT SAFETY INSTRUCTIONS
NOTE: In order to avoid injury or damages, please do not try to assemble your desk alone. It is a massive and heavy desk and requires at least two people to carry out assembly. Please assemble on soft surface to avoid scratches to the lacquer.
OVERVIEW AND DIMENSIONS
IRON BASE SET
Exploded Diagram
IRON BASE SET in the package
WOODEN WORKBENCH SET
Exploded Diagram
Item | Qty | Description | Item | Qty | Description |
---|---|---|---|---|---|
A1 | 1 pc | Main Surface | C1 | 1 pc | Lower Left Panel |
A2 | 1 pc | Pull Out Board | C2 | 1 pc | Lower Right Panel |
A3 | 1 pc | Bottom Board | D | 2 pcs | Hook |
A4 | 1 pc | Top Shelf | E | 4 pcs | Cable Grommet |
A5 | 1 pc | Back Board (Tailgate) |
G
| 30 pcs| G1: Metal Bracket
B1| 1 pc| Upper Left Panel| 60 pcs| G2: M51O Machine Screws
B2| 2 pcs| Divider| L4| 4 pcs| M510 Self-tapping Screws
B3| 1 pc| Upper Right Panel| L5| 48 pcs| M5*18 Screws (For Rail equipment)
®| 2 pcs| N3mm Allen Wrench| | |
WOODEN WORKBENCH SET in the package
ASSEMBLY STEP
- Place the Main Surface (A1) on the ground with the slotted side facing upwards. Fix one end of each of the eight Metal Bracket (G1) to the slots on the A1, using M5x10 Screws (G2). Prepare the C1 & C2 as shown below.
- Insert C1 and C2 vertically into the slots of A1 with the drawer slides facing inwards, which may need to be tightened gently with a rubber hammer. Fix the other end of the eight Metal Bracket (G1) on C1 and C2, using M5x10 Screws (G2).
- Fix one end of each of the four Metal Bracket (G1) to the top of C1 and C2 respectively with M5x10 Screws (G2), as shown below.
- Prepare the Left & Right Leg (1L, 1R), the Center Crossbar (2), the Allen Wrench (3, 4) and the Screws (L1, L2, L3) as shown below.
- Insert the Left Leg (1L) centre protrusion into the Cross- bar (2) as shown below and secure with the M8x12 Screws (L1), then you will get the Left Leg Assembly.
- Flip over the Left Leg Assembly and insert the Crossbar into the hole in C2 & C1 as shown below, aligning the mounting holes in A1, then secure the Left Leg (1L) to A1 with the M6x12 Screws (L2). Fix the Right Leg (1R) to A1 in the same way.
- Use M8x12 Screws (L1) to lock the Crossbar (2) and Right Leg (1R), then use M4x14 Self-tapping Screws (L3) to lock both Left & Right Leg (1L & 1R), Crossbar (2) to the Main Surface (A1).
- Secure Bottom Board (A3) to C1 and C2 with the Metal Bracket (G1) previously installed in step 3, locking with M5x10 Screws (G2). Then flip over the desk to standing position.
- Secure one end of the eight Metal Bracket (G1) to the Main Surface (A1) with M5x10 Screws (G2) as shown below.
- Prepare the B1, B2 and B3 board as shown below.
- Insert B1, B2 & B3 vertically into the slots on A1, make sure the B1 & B3 with the logo facing outwards which may need to be tightened gently with a rubber hammer. Secure one end of the eight Metal Bracket (G1) to the Main Surface (A1) with M5x10 Screws (G2).
- Place the Top Shelf (A4) on the ground with the slotted side facing upwards. Use G2 screws secure the Metal Bracket (G1) on the A4 as shown below.
- Flip over the Top Shelf (A4) and place on top of B1, B2 and B3 as shown below, then secure all G1 with G2 screws.
- Install four Cable Grommets (F) on A4.
- Attach the two Hook (D) to the outside of the C1 and C2 and secure with the M5x10 Screws (L3).
- Secure A5 to A2 with G1 Metal Brackets and G2 Screws as shown below.
- Pull out the drawer slides on C1 and C2, align the left and right side of the A2 with the drawer slide, insert the A2 and push into the very end, pulling back and forth to make sure it can move smoothly.
Congratulations your installation is complete!
How can we help you?
CONTACT OUR US-BASED SUPPORT TEAM
- Simple or complex, your questions are important to us. For service, support or more information, please contact the Sound Town support team:
- Email: support@soundtown.com
Sound Town Inc.
Los Angeles, California, USA
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>