FerdY 56-60W Semi Frameless Shower Door Instruction Manual

June 1, 2024
FerdY

FerdY 56-60W Semi Frameless Shower Door Instruction Manual
FerdY 56-60W Semi Frameless Shower Door

PARTS LIST

Parts List

NO. Description QTY
1 Upper guide rail 1
2 Bottom guide rail 1
3 Wall profile 2
4 Glass door 2
5 Handle 2
6 Roller 4
NO. Description QTY
--- --- ---
7 Wall anchor 6
8 ST3.9*40 6
9 Rubber stopper 6
10 Guide block 3
11 ST3.9*13 4
12 Shim 4

Installing

Step 1
Installing
Step 2
Installing
Step 3
Installing

Attentions:
Showering is banned within 24 hours after silicone; If bad weather such as rainy days or in winter, longer time is needed.

INSTALLATION MANUAL

IMPORTANT

  • Thoroughly inspect your product before proceeding with the installation.
  • The warranty will be void if the product is installed with a conspicuous defect.

CAUTION

  • To prevent leaks,silicone must be applied on the outside of the shower and not on the inside!
  • Read all instructions carefully before starting the installation.
  • Save this manual for future reference.
    Company logo

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals