CITY LIFE CL.7100 Inox Freestanding Bath Filler with Hand Shower and Diverter Instruction Manual
- June 1, 2024
- City Life
Table of Contents
CITY LIFE CL.7100 Inox Freestanding Bath Filler with Hand Shower and
Diverter
Product Specifications
- Operating static pressure: 150 – 500kpa
- Max hot water temperature: 75°C
- Not suitable for gravity feed application
Product Usage Instructions
Installation
- Ensure both supply pipes are flushed and free from debris before proceeding.
- If installing into a concrete floor, cut a chase in the concrete for roughing in the supply pipe.
- Rough in to a spout outlet with a 1/2 inch male BSP thread & cap until fit-off.
- Feed the two flexible hoses through the floor bracket, riser pipe & cover plate.
- Hand tighten riser pipe into the bracket & slide plate onto riser pipe.
- Connect the two flexible hoses into the mixer by hand tightening & making final adjustments with a spanner.
- Connect the two flexible hoses into the water supply by hand tightening & making final adjustments with a spanner.
- Screw the mounting bracket to the floor using the provided fixings and slide cover plate into position.
Care and Use
- Shut the tap gently to reduce the chance of water hammer or ‘banging’ pipes.
- Regularly clean chrome surfaces only with non-scouring, neutral wash solutions.
Frequently Asked Questions (FAQ)
-
Q: What should I do if the water pressure exceeds the recommended range?
A: If the water pressure exceeds 500kpa, install an approved pressure limiting valve to regulate the pressure. -
Q: Can I use this product for gravity feed applications?
A: No, this product is not suitable for gravity feed applications. Ensure proper water pressure is maintained for optimal performance.
CITY LIFE INSTALLATION INSTRUCTION
CL.7100
IMPORTANT!
Please read this instruction Prior to installation
T 1300 837 688 E info@verotti.com www.verotti.com
IMPORTANT RECOMMENDATIONS FOR INSTALLATION
Installation should comply to AS/NZS3500.1 2003 or relevant local requirement.
Not suitable for gravity feed application.
Hot & cold water inlet pressures should be equal.
-
WATER PRESSURE
Operating static pressure is 150 – 500kpa. If pressure exceeds this, then an approved pressure limiting valve must be installed. -
PRE-FLUSH
Always flush out the pipework before connecting any faucets.
Damage caused to the faucet by debris coming through the pipework is not covered under warranty. -
WATER TEMPERATURE
Maximum hot water temperature is 75 degree.
ATTENTION!
Failure to do so will void the warranty.
Installation
-
Ensure both supply pipes has been flushed and is free from debris before proceeding.
-
When installing into a concrete floor, a chase will need to be cut out of the concrete to rough in the supply pipe.
Rough in to a spout outlet with a 1/2 inch male BSP thread & cap until fit- off. -
Feed the two flexible hoses through the floor bracket, riser pipe & cover plate. Hand tighten riser pipe into the bracket & slide plate onto riser pipe.
-
Connect the two flexible hoses into the mixer by hand tightening & making a final adjustment with spanner. Hand tighten riser pipe onto mixer.
-
Connect the two flexible hoses into the water supply by hand tightening & making a final adjustment with a spanner.
-
Screw mounting bracket to floor using fixings provided. Slide cover plate down into position.
Care and Use
- Shutting the tap gently will reduce the chance of water hammer or ‘banging’ pipes.
- Regularly clean the chrome surfaces only with non scouring, neutral wash solutions.
Instruction
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>