Superday H08BN015 3 Drawer File Cabinet Installation Guide
- June 1, 2024
- Superday
Table of Contents
Superday H08BN015 3 Drawer File Cabinet
TOOLA REQUIRED
PART LIST
Box 1/1: ➀➁➂ ➃➄➅X2➆X3➇X3➈X3➉X3
PARTS DISPLAY
-
Back plate 1PCS
-
Left Panel 1PCS
-
Right Panel 1PCS
-
Lower frame 1PCS
-
Top Panel 1PCS
-
Rod 2PCS
-
Drawer Front Panel 3PCS
-
Rear plug 3PCS
-
Drawer Chest 3PCS
-
Long hanging rod 3PCS
INSTALLATION STEP
Press tightly, make sure hole to hole
Top down with a soft hammer until it is flat with the bottom of the side panel
The back is squeezed forward and the top is slapped downward with hand force
until the installation is flush
Must step: A First slide the steel ball to the front of the cabinet’s
outer slide.
B: Insert the inside railway course on both sides of drawer on the
outside railway course of cabinet at the same time. Two people must put the
drawer flat and insert it slowly and synchronously. After inserting it to the
end, pull it out slowly twice, the slide track works normally. lf it works
fails, please follow the slide track removal instructions, open it and
reinstall it.
Open the cabinet clockwise and close the cabinet counterclockwise
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>