Seaward PV150 Complete Kit Solar PV Kit User Manual
- May 15, 2024
- SEAWARD
Table of Contents
- Seaward PV150 Complete Kit Solar PV Kit
- Product Usage Instructions
- CERTIFICATE OF CONFORMITY
- INTRODUCTION
- Safety Notes
- Accessories
- Unit Description
- Using the PV150+
- Protective Earth Resistance (Rpe) Function
- Auto Shutdown
- Use with the Solar Survey 200R
- Electrical Specifications
- Environmental Conditions
- Maintenance
- Appendix A
- LIMITED WARRANTY & LIMITATION OF LIABILITY
- Documents / Resources
Seaward PV150 Complete Kit Solar PV Kit
Specifications
- Handheld, battery-powered multi-function solar photovoltaic installation test instrument
- Capable of performing electrical tests required by IEC 62446
- Tests include Earth continuity @ 200mA, Open circuit module voltage, Voltage polarity, Short circuit current, Insulation resistance at 250V, 500V, and 1000V AC or DC, Operating current
- LCD for easy readings
- Memory store and recall functions
- Auto sequence measurement for efficiency
- Operating current via AC/DC clamp
- DC power measurement via AC/DC clamp
Product Usage Instructions
User Notes
Read the user manual carefully before use. Ensure the unit is serviced and calibrated by an authorized agent as per the manufacturer’s instructions.
Safety Notes
Always follow the safety precautions provided in the manual. Do not operate the PV150+ in wet conditions. Keep away from heat sources and direct sunlight.
Using the Solar Installation PV150+
- Power On PV150+ : Press the power button to turn on the device.
- Battery Condition Check : Verify battery status before testing.
- Protective Earth Resistance (Rpe) Function : Follow steps for nulling test lead resistance, resistance measurement, and voltage measurement.
FAQ
Q: How often should the PV150+ be calibrated?
A: The PV150+ should be calibrated annually by an authorized agent to ensure accurate results.
Q: Can the PV150+ be used in extreme temperatures?
A: The PV150+ has environmental limits listed in the manual. Avoid operation outside these limits to prevent damage.
CERTIFICATE OF CONFORMITY
The certificate of conformity is available from Seaward.com Declarations of Conformity | Seaward
INTRODUCTION
- The Seaward PV150+ is a handheld, battery-powered, multi-function solar photovoltaic installation test instrument capable of performing all of the electrical tests required by IEC 62446, including:
- Earth continuity @ 200mA
- Open circuit module, string, or array voltage
- Voltage polarity
- Short circuit module, string, or array current
- Insulation resistance at 250V, 500V and 1000V
- AC or DC Operating current
User Notes
- This instrument and its operating instructions are intended for use by adequately trained and competent personnel wearing suitable personal protective equipment.
- The following symbols are used in these operating instructions and on the Seaward PV150+.
Warning of electrical danger!
- Indicates instructions must be followed to avoid danger to persons.
Important, follow the documentation!
- This symbol indicates that the operating instructions must be adhered to to avoid danger.
Safety Notes
- To ensure the safe operation of this instrument, all notes and warnings in these instructions must be observed at all times.
- The PV150+ is intended for use in a dry environment only.
- The PV150+ RED and BLACK 4mm test terminals may be used to make measurements on circuits rated up to CAT III 300 V AC/DC about Earth. Do not connect the PV150+ to voltages which may exceed this rating.
- The PV test terminals maximum rating: 1000V DC open circuit voltage, 15A short circuit current, 10kW DC power. Do not exceed this rating. The DC supply must be isolated from the earth during testing.
- High voltages are present at the probe tips of the PV150+ during insulation resistance measurement. Always hold test probes behind the hand guards.
- Check the PV150+ and all associated cables and leads before operating the equipment. Do not use it if there are signs of damage.
- Only use the test leads supplied with the PV150+.
- Do not touch any exposed metal parts of the solar PV installation during testing.
- Always ensure that the circuit under test is electrically isolated from the mains supply before attempting an earth resistance measurement.
- Do not leave the PV150+ permanently connected to a PV installation. Always disconnect all test leads immediately after use.
- Do not test with optimizers connected
- Do not attempt to turn off the PV150+ while tests are active.
- Where safe operation of the PV150+ is no longer possible it should be immediately shut down and secured to prevent accidental operation.
It must be assumed that safe operation is no longer possible:
- if the instrument or leads show visible signs of damage or
- the instrument does not function or
- after long periods of storage under adverse environmental conditions.
- If the PV150+ is being used to determine the presence or absence of hazardous voltages, always prove the operation of the voltage measurement function before and after use through a known voltage source or proving unit.
- The PV150+ is not intended for continuous use. When the PV150+ is not being used disconnect it from the system under test.
- If the PV150+ is used in a manner not specified by this document, then the protection provided by the equipment may be impaired.
- Do not open unit, no other user-serviceable parts.
Accessories
Standard Contents
- The PV150+ test kit is supplied with the following items: 1 off PV150+ unit
- 1 off professional carry case
- 1 set 1.2 M red and black test lead with test probe and alligator clip 1 set MC4 PV test lead adaptors
- 1 off Quick Reference Guide
- 6 off MN1500 (AA) 1.5v Batteries 1 off current clamp adapter
Optional Accessories
- 500mA FA 1000V Fuse
Unit Description
- The PV150+ is a handheld, multi-function electrical installation test instrument.
Identifying parts of the unit
- The numbering below refers to Figure 1 and Figure 2.
Figure 2 PV150+ End view
- LCD Display
- Rpe test key
- Autotest sequence key
- Test lead resistance null key
- Insulation test voltage select key
- Memory recall key
- Memory store key
- +ve PV test lead input (RED)
- –ve PV test lead input (BLACK)
- +ve 4mm test lead input (BLACK)
- –ve 4mm test lead input (RED
LCD display
- a. Rpe voltage polarity. For AC voltages alternating + and – is shown.
- b. Current clamp measurement active.
- c. Rpe Null offset – indicates that test lead resistance offset is active.
- d. Caution – hot surface. If this icon appears, the PV150+ must be disconnected immediately from the PV system until the icon is no longer shown on the LCD.
- e. Solar module polarity indicator – indicates the polarity of the DC voltage applied to the PV test terminals e.g. correct or reversed
- f. Caution – hazardous voltage detected.
- g. Rpe test lock – active when continuous Rpe measurement has been enabled.
- h. Caution – refer to operating instructions. When this icon is active, the operating instructions must be followed to avoid risk of danger.
- i. Riso PASS/FAIL – indicates whether the measured insulation resistance is above or below the factory set acceptable value.
- j. Insulation Test Voltage selection – indicates the test voltage selected for insulation resistance measurements.
- k. Error – Refer to the specific error codes for further details.
- l. STORE – LCD data is being stored in the onboard memory
- m. RECALL – the data shown on the LCD has been recalled from the onboard memory.
- n. User Memory display – indicates the memory location of the results stored or recalled on the LCD.
- o. Voltage/current variation – indicates that the measured voltage and current values deviate by more than or less than 5%.
- p. Battery status icon.
Using the PV150+
Power PV150+
- To turn the PV150+ on, press and hold the Rpe and Auto buttons simultaneously.
Battery Condition Check
- The PV150+ automatically performs battery condition checks whilst idle and during measurements.
- When the battery level is low, the battery symbol icon will appear on the PV150+ display.
- The PV150+ will continue to function, however the batteries should be replaced.
- Note: When the battery symbol icon is flashing all tests will be inhibited and the batteries must be replaced immediately as described in section 8.4.
Protective Earth Resistance (Rpe) Function
Test lead resistance null
The PV150+ can automatically compensate for the resistance of the test leads using the following procedure.
- Hold the tips of the test probes firmly together as shown, to ensure a good electrical connection.
- Press and hold the Rpe Null key (4).
- The measured resistance of the test leads is shown in the primary display until a beep is heard.
- The Rpe display will now be 0.00 and the Null icon will be illuminated
- All subsequent measurements will take into account the test lead resistance compensation until the function is disabled by pressing the Rpe Null key (4)
- Note: A maximum test lead resistance of 10Ω ohms can be taken into account. If the test lead resistance is greater than 10Ω an error beep will indicate that the lead Zero function has failed.
- Note: For ease of use, the PV150+ will store the lead compensation when switched off and recall this value when next switched on.
- The stored value is only applicable to the test leads used when the compensation measurement was made.
- If the test leads are replaced the Rpe null function should be repeated using the replacement test leads.
Resistance measurement
To make a single measurement:
- Connect the red and black test leads as shown.
- Press the Rpe key.
- The resistance between the test probes is displayed.
To make a continuous measurement:
- Connect the red and black test leads as shown.
- Press and hold the Rpe key until the lock icon appears on the LCD.
- The resistance between the test probes is displayed.
- Press the Rpe key to terminate the continuous measurement mode.
Note: Do not connect the PV150+ to a voltage source while performing the resistance measurement as this will blow the fuse located in the battery compartment.
Voltage measurement
- Connect the red and black test probes to a voltage source
- The PV150+ will automatically measure the voltage between the probes.
- The polarity of the voltage is shown using the icon next to the Rpe icon
- If the measured voltage is AC, alternating + and – are shown
Auto Sequence Measurement
- Always ensure that the circuit under test is electrically isolated from the main supply.
- Due to the high input impedance of the red 4mm test terminal, voltage caused by leakage currents may be measured before starting a test.
- Do not attempt to turn off the PV150+ while tests are active.
- Connect the PV150+ to the PV module as shown, using the supplied test lead adaptors.
- The red test probe should be connected to Earth. Where the structure/frame is bonded to the earth, the earth connection may be to any suitable earth or the array frame.
- Where the array frame is not bonded to the earth, a commissioning engineer may choose to do two tests:
- Between array cables and earth
- Between array cables and frame
- The PV150+ will automatically detect any DC voltage connected to the PV test socket inputs 8 and 9 and display the measured voltage.
- If the PV voltage polarity is reversed, the polarity indicator will flash across next to the voltage icon.
- If the incoming voltage is >30v then the shock hazard icon will flash.
- Use the Viso button to select either the 250V, 500V, or 1000V insulation test voltage, please refer to relevant standards for testing requirements.
- Press the Auto button and the PV150+ will automatically perform the following tests: Open Circuit Voltage Short Circuit Current Insulation Resistance
- The measurement results will remain on the LCD for 20 seconds or until a key is pressed.
- A tick or cross will be displayed next to the insulation resistance measurement indicating whether the result is above or below the threshold values shown in Table 1.
Table 1
Viso | Pass / Fail Limit |
---|---|
250v | 0.5 M ohms |
500v | 1.0 M ohms |
1000v | 1.0 M ohms |
- Note: During the insulation test, the PV150+ applies a short circuit across the PV string. The insulation test voltage is then applied between the RED 4mm test lead and the two PV test terminals.
- Note: If the DC voltage polarity is incorrect or the voltage is <5V or >1000V the Auto Test will be disabled until the problem is corrected.
Memory Store
- The PV150+ can store up to 200 complete sets of measurements. Press the Memory Store button to store all measured values on the display.
- If there is sufficient memory space to store a set of readings, then the Store icon will appear, and the readings will be stored in the next available memory location. If there is insufficient memory space, then the buzzer will sound. If there are no valid readings on the display, then nothing will be stored.
Memory Recall
- Each press of the Recall button will increment the user memory location indicator and display the measured values stored in that memory location.
- The location number is shown on the bottom of the LCD. After the first press of Recall, the Store button can be used to decrement the user memory location indicator to recall the previous memory location.
- Press and hold the Recall button to download data to a PC via the USB port.
5% Variation warning
- If the recall data has a Voc or Isc reading, then the average of all the stored readings is calculated. If the current recalled reading is more than 5% different from the average, then the 5% warning icon will flash.
Average value
- Keep pressing the Memory Recall button until the location number is 0. The display now shows the average Voc and Isc. of all stored results.
Memory Clear
- Press the Store and Recall buttons together to clear all the user memory locations.
Operating Current
- The PV150+ can be used to measure the DC operating current of a solar PV installation as shown.
- Disconnect all cables from the PV test inputs (8 & 9 in Figure 2).
- Connect the current clamp to the red–black 4mm probe inputs.
- Move the current clamp switch to the 40A position.
- Press the zero button on the current clamp for a few seconds.
- Place the clamp around the DC cable of the solar installation.
- Press the Viso button until the clamp icon (figure 3, icon b) appears on the LCD.
- The measured current is shown on the LCD next to the clamp icon.
DC Operating Power
The PV150+ can be used to measure the DC operating power of a solar PV installation as shown.
- Disconnect all cables from the PV test inputs (8 & 9 in Figure 2).
- Connect the current clamp to the red–black 4mm probe inputs.
- Move the current clamp switch to the 40A position.
- Press and hold the zero button on the current clamp for a few seconds.
- Place the clamp around the DC cable of the solar installation.
- Press the Viso button until the clamp icon (figure 3, icon b) appears on the LCD.
- The measured DC is shown on the LCD next to the clamp icon.
- Connect the PV voltage to the PV inputs. ‘T’ or ‘Y’ test adaptors are required if the DC power is to be measured whilst the PV system is operational.
- The DC Voltage, current, and power will be displayed
- Note: The Auto button is disabled whilst the DC power measurement is in use.
- Under no circumstances should and
- Auto test sequence be attempted whilst the PV150= is connected to the inverter DC inputs as this may result in damage to the instrument.
Auto Shutdown
After 1 minute of being idle, the PV150+ will turn itself off to conserve battery power.
This auto-shutdown period can be extended as follows:
- Turn the PV150+ unit off
- Press and hold the NULL key, then press both the ON/OFF keys together. Keep holding the NULL key.
- The display will show “OFF” on line 1, and the turnoff time on line 2 (in minutes)
- Keep holding the NULL key and press the Viso key. Each press of the Viso key will increment the turnoff time.
- Increment beyond 10 to set the time back to 1 minute
- Note: When displaying DC Operating Power (section 5.9) the Auto Shutdown function is deactivated whilst DC voltage or current are detected. This will allow extended time for monitoring DC power.
Error Messages
- Under certain conditions, the PV150+ may indicate an error message.
User-serviceable error codes
Non-user serviceable error codes
Use with the Solar Survey 200R
Pairing with the Survey 200R
- Make sure no other units are operating nearby. Turn off both the PV150+ and Survey 200R units.
- On the Survey 200R, press and hold the On/Off keys, and keep both keys pressed.
- On the PV150+, press and hold the Rpe and Auto keys, and keep both buttons pressed.
- The Survey 200R will now send its “Pairing” signal. When the PV150+ detects this signal, it will remember the serial number of the Survey 200R and will look for that particular serial number in all future communications.
- When the PV150+ has successfully paired, it will beep and display the serial number of the Survey 200R. This should normally happen within a couple of seconds.
- Note: The top line of the PV150+ display will now show the W/m2 icon.
Un-Pairing from the Survey 200R
- Make sure no other units are operating nearby. Turn the PV150+ off.
- On the PV150+, press and hold the Rpe and Auto keys, and keep both buttons pressed for about 10 seconds. The PV150+ will then beep and clear its screen.
- The unit is now no longer paired with any Survey 200R. Note that the top line of the LCD will display Rpe ohms.
Put the Survey 200R into transmit mode
- The Survey 200R can be put in and out of transmit mode by pressing and holding the temperature key, and then momentarily pressing the OK key.
- When in transmit mode there will be a flashing icon above the temperature key.
- Note: When in transmit mode the auto shut-down feature is disabled. You must remember to turn the Survey 200R off to save battery power.
Normal operation
- When the PV150+ has been paired with a Survey 200R, the top line of the display is used to show the irradiance value measured by the Survey 200R.
- The Survey 200R must be put into transmit mode as described above.
- When the PV150+ is in range of the Survey 200R it will display the Survey 200R irradiance value and display it on the top line of the LCD.
- When an Autotest is performed, the PV150+ captures the irradiance, ambient temperature, and module temperature measurements from the Survey 200R.
- Press Store and all these values will be stored along with any measurements made using the PV150+.
Downloading data to PC
- Connect the PV150+ to the PC using the USB cable. (This will create a COM port on the PC)
- Run the Seaward Solar Datalogger application on the PC. Select the correct COM port. (Use the Help menu – Troubleshooting guide, to help find the correct COM port)
- Click the Download button, and then press and hold the Recall key (6) on the PV150+. After a few seconds, the PV150+ will transfer all its stored data to the PC.
- By default, the Datalogger application will save the data in CSV format. This can be opened using Microsoft Excel. Note that each row of data will have the readings from the Survey 200R where possible.
Electrical Specifications
Open Circuit Voltage Measurement (PV Terminals)
- Display Range 0.0VDC – 1000VDC
- Measuring Range 5.0VDC – 1000VDC
- Resolution 0.1VDC
- Accuracy ± (0.5% + 2 digits)
Short Circuit Current Measurement
- Display Range 0.00ADC – 15.00ADC
- Measuring Range 0.50ADC – 15.00ADC
- Maximum Power 10kW
- Resolution 0.01 ADC
- Accuracy ± (1% + 2 digits)
Maximum Power
- Maximum Power Rating 10kW
Voltage | Current |
---|---|
<600V | 15A |
700V | 14.2A |
800V | 12.5A |
900V | 11A |
1000V | 10A |
Earth Continuity
- Test Voltage Open Circuit >4V
- Test Current into 2Ω >200mA
- Display Range 0.00Ω – 199Ω Measuring Range (EN 61557-4) 0.05Ω –199Ω Resolution 0.01Ω maximum
- Accuracy ± (2% + 2 digits)
- Number of repeat tests as per IEC61557-4
- Approx. 4000
Insulation Resistance
- Test Voltage Specification -0% +20% (open circuit) Test Voltage @ 1mA >1mA into UN x (1000Ω/V)
- Test Current Short Circuit <2mA
- Display Range 0.05MΩ – 199MΩ Measuring Range (EN 61557-2) 0.20MΩ – 199MΩ Resolution 0.01MΩ maximum
- Accuracy 0.05MΩ – 100MΩ ± (5% + 5 digits) 101MΩ –199MΩ ± (10% + 5 digits)
- Number of repeat tests as per IEC61557-2 Approx. 3000
Rpe Voltage Measurement (4mm Terminals)
- Display Range 30V – 440V
- Voltage Measuring Range 30V – 440V DC 30V – 440V AC 50-60Hz
- Resolution 1V
- Accuracy ± (5% + 2 digits)
Operating Current (via AC/DC Current Clamp)
- Display Range 0.1A – 40.0A
- Current Measuring Range 0.1A – 40.0ADC 0.1A – 40.0AAC 50-60Hz
- Resolution 0.1A
- Accuracy ± (5% + 2 digits)
DC Power (via AC/DC Current Clamp)
- Display Range 0.00kW – 40kW
- Measuring Range 0.50kW – 40kW
- Resolution 0.01kW
- Accuracy ± (5% + 5 digits)
Environmental Conditions
- The PV150+ has been designed to perform tests and measurements in a dry environment.
- Maximum barometric elevation for making measurements is 2000M.
- Overvoltage category IEC 60664/IEC 61010, 300V Category III (Red and Black 4mm terminals only).
- Pollution degree 2 according to IEC 61010-1. Protective system IP40 according to IEC 60529.
- Electromagnetic compatibility (EMC). Interference immunity and emitted interference conforming to IEC 61326-1.
- Operating temperature range of 0°C to 40°C, without moisture condensation.
- The PV150 can be stored at any temperature in the range -25°C to +65°C (relative humidity up to 90%). The batteries should be taken out of the instrument for storage.
- Operating Altitude 0 to 2000 meters
Maintenance
- Before removing the PV150+ battery cover ensure that all test leads have been disconnected from the instrument. Electric shock danger!
- Do not operate the PV150+ without the battery cover securely in place.
Preparing to work on the PV150+
- Make sure the PV150+ leads and accessories are disconnected, before opening the instrument.
- Power the unit off.
- Disconnect all of the test leads from the unit
Securing the PV150+
- Under certain conditions, safe operation of the PV150+ can no longer be assumed: Visible damage to the instrument case.
- Incorrect measurement results.
- Recognizable abuse of the instrument due to prolonged storage under improper conditions.
- Recognizable abuse of the instrument due to extraordinary transportation stress. Check the battery compartment for signs of battery electrolyte leakage.
- In these cases, the PV150+ should be immediately switched off, disconnected from any test or measurement function, and secured to prevent any further use.
Cleaning the PV150+
- Clean the external case of the Solar PV150+ with a clean dry cloth.
- Avoid using solvents and abrasive scouring agents to clean the external case of the Solar PV150+.
- Check the battery contacts and compartment are free of electrolytic contamination.
- Any contamination of the battery contacts or compartment should be cleaned with a dry cloth.
Battery Replacement
- Before opening the PV150+ ensure that it is disconnected from all voltage! Electric shock danger!
Power the unit off.
- Disconnect all the test leads from the unit
- Position the PV150+ face down and release the captive screw in the battery compartment cover.
- Remove the battery compartment cover.
- Remove the discharged batteries from the compartment. Fit a new set of alkaline batteries.
- Relocate the battery cover over the battery compartment and fasten in position with the battery cover captive screw.
Replacing the Fuse
- Before opening the PV150+ ensure that it is disconnected from all voltages!
- Electric shock danger!
- All replacement fuse types are specified for ratings and size on the battery compartment cover on the rear of the PV150+.
Power the unit off
- Disconnect all the test leads from the unit.
- Position the PV150+ face down and release the captive screw in the battery compartment cover.
- Remove the battery compartment cover.
- Lift one end of the fuse out of the fuse holder with the help of a flat-bladed screwdriver. Lift the defective fuse completely out of the fuse holder.
- Insert a new fuse as described and specified by the text on the battery compartment cover.
- Ensure that the new fuse is seated and centered in the fuse holder.
- Relocate the battery cover over the battery compartment and fasten it in position with the battery cover captive screw.
- The Seaward PV150+ panel circuit is protected by a 15A 1000V Solar fuse. This fuse is not operator replicable. If this fuse blows then the Seaward PV150+ will indicate an error before the panel is shorted, the PV150+ must be returned for service.
Service and Calibration
- To maintain the specified accuracy of the measurement results, the instrument must be recalibrated at regular intervals by either the manufacturer or an authorized Seaward Service Agent. We recommend a recalibration period of one year.
Spare Parts
- Seaward Part No.
- MC4 Test Lead set (Red lead fused, black lead un-fused) 396A959
- MC4 Test Lead (Red fused lead) 388A688
- MC4 Test Leads with test probes (includes crocodile clips) 388A953
Appendix A
IEC61557-2: Insulation
Intrinsic error or influence quantity| Reference conditions or specified
operating range| Designation code
Intrinsic error| Reference conditions| A
Position| Reference position ±90o| E1
Supply voltage| At the limits stated by the
manufacturer
| E2
Temperature| 0oC and 40oC| E3
Operating Error| B =± (| A| + 1.15 E 2 + E 2 + E 2 )
1 2 3
IEC61557-4: Resistance of earth connection and equipotential bonding
Intrinsic error or
influence quantity
| Reference conditions or
specified operating range
| Designation code
Intrinsic error| Reference conditions| A
Position| Reference position ±90o| E1
Supply voltage| At the limits stated by the manufacturer| E2
Temperature| 0oC and 40oC| E3
Operating Error| B =± (| A| + 1.15 E 2 + E 2 + E 2 )
1 2 3
For help or advice on Service and Calibration contact:
- Service Department Seaward Electronic
- Bracken Hill
- South West Industrial Estate
- Peterlee
- Co Durham SR8 2SW
- England
- Tel: 0191 5878739 / 0191 5878737
- Email: service@seaward.com
For help or advice on Service and Calibration, in North America contact:
- Service, Calibration and Repair
- Seaward Group USA
- 6304 Benjamin Road
- Suite 506
- Tampa, FL 33634
- United States
- Tel: 813 886 2775
- Fax: 813 886 2754
- Email: service@seaward-groupusa.com
- Part Number 388A597
- Revision 1.1
LIMITED WARRANTY & LIMITATION OF LIABILITY
SEAWARD Electronic Limited guarantees this product to be free from defects in material and workmanship under normal use and service for 2 years, provided the instrument is serviced and calibrated by an authorized agent according to the manufacturer’s instructions. The period of warranty will be effective on the day of delivery.
The manufacturer does not provide any warranty for the following:
- Any normal wear and tear.
- Errors or damage caused by: (i) misuse or not using your product by the user guide, such as if the product has been exposed to moisture, dampness, or extreme thermal or environmental conditions or rapid changes in such conditions, to corrosion, to oxidation, to spillage of food or liquid or to influence from chemical products, (ii) using your product with, or connecting it to, any product, accessory, software, or service not manufactured or supplied by the manufacturer, (iii) any products combined with your product by a third party, (iv) damage or errors caused by hacking, cracking, viruses, or other malware, or by unauthorized access to services, accounts, computer systems or networks; or (v) other acts beyond the manufacturer’s reasonable control.
This Warranty is not valid:
- If your product, or the software it runs on, has been (i) opened, modified, or repaired without the manufacturer’s authorization, or (ii) repaired with unauthorized spare parts.
- If you have not installed the latest software updates that are publicly available for your product within a reasonable time of their release
- If you refuse to give possession of the product to the manufacturer for repair and investigation.
Copyright 2023
- All rights reserved. Nothing from this edition may be multiplied, or made public in any form or manner, either electronically, mechanically, by photocopying, recording, or in any manner, without prior written consent from SEAWARD Electronic Limited. This also applies to accompanying drawings and diagrams.
- Due to a policy of continuous development SEAWARD Electronic Limited reserves the right to alter the equipment specification and description outlined in this publication without prior notice and no part of this publication shall be deemed to be part of any contract for the equipment unless specifically referred to as an inclusion within such contract.
- seaward.com
Documents / Resources
|
Seaward PV150 Complete Kit Solar PV
Kit
[pdf] User Manual
PV150 Complete Kit Solar PV Kit, PV150, Complete Kit Solar PV Kit, Kit Solar
PV Kit, Solar PV Kit, PV Kit
---|---
References
- Dresses for Prom, Homecoming, Evenings and More – Camille La Vie
- Electrical Safety Test Equipment Manufacturers | Seaward
- Declarations of Conformity | Seaward
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>