CHNT DTSU666-FE Three Phase DIN Rail Meter User Manual
- May 15, 2024
- CHNT
Table of Contents
DTSU666-HW Smart Power Sensor
Quick Guide
Overview
1.1 Dimensions Note
The dimensional tolerance is ± 1 mm.
1.2 Appearance 1.3 Key Specifications
Category | DTSU666-HW |
---|---|
Nominal voltage | 230 V AC/400 V AC, 50 Hz/60 Hz |
Current measurement range | Direct connection: 0–80 A Connection through |
current transformers: > 80 A
Voltage measurement range| 90–1000 V (line voltage; potential transformers are
required if the voltage is greater than 500 V)
Electricity metering accuracy| Class 1 (error within ±1%)
Power grid system| Three-phase four-wire or three-phase three-wire
Baud rate| 4800/9600/19200/115200 bps (default value: 9600 bps)
Operating temperature| –25℃ to +60℃
Installation mode| Guide rail-mounted
Certification| CE, RCM, and UKCA
1.4 Port Definition
- Input voltage: When the line voltage is less than or equal to 500 V, connect the meter directly. When the line voltage is greater than 500 V, connect the meter through potential transformers.
- Input current: When the input current is 0 A to 80 A, connect the meter directly (channel 1).
When the input current is greater than or equal to 80 A, connect the meter through current transformers (channel 2).
Installing the DTSU666-HW
- Install the Smart Power Sensor on the standard guide rail of DIN35mm.
- Press the Smart Power Sensor downwards onto the guide rail, and then push it in place along the guide rail.
Installing Cables
3.1 Preparing Cables
Cable| Port| Type| Conductor Cross- sectional Area Range|
Outer Diameter| Source
---|---|---|---|---|---
Channel 1 voltage cable| UA-1 and 3| Single-core outdoor copper cable| 25 mm2|
10 mm| Prepared by the customer
UB-4 and 6
UC-7 and 9
UN-10 and 12
Channel 2 voltage cable| UA-1| Single-core outdoor copper cable| 4–25 mm2|
5–10 mm| Prepared by the customer
UB-4
UC-7
UN-10
Channel 2 current transformer cable| IA-31| Single-core outdoor copper cable|
2–4 mm2| 3–5 mm| Prepared by the customer or supplied with current
transformers
IA-33
IB-34
IB-36
IC*-37
IC-39
Communications cable| RS485A-24| Two-core outdoor shielded twisted pair copper
cable| 0.25–1.5 mm2| 4–11 mm| Supplied by the manufacturer
RS485B-25
Note The maximum torque of 1, 3, 4, 6, 7, 9, 10, and 12 terminal screws is
1.7 N·m, and the recommended torque is 0.9–1.1 N·m. The maximum torque of 31,
33, 34, 36, 37, 39, 24, and 25 terminal screws is 0.4 N·m, and the recommended
torque is 0.15–0.25 N·m.
Note Each phase of UA, UB, and UC in the Smart Power Sensor is connected
with a fuse and a thermistor to prevent damage caused by external short
circuits. UA, UB, and UC do not need external fuse protection. 3.2 Wiring
Scenarios
Current | ≤ 80 A | > 80 A | ≥ 0 A |
---|---|---|---|
Line voltage | ≤ 500 V | > 500 V |
Connection
mode
| Current and voltage direct connection| Connection through current
transformers and voltage direct connection| Connection through current
transformers and potential transformers
Connection setting| Direct connection: SPEC = 1 (default)|
Connection through transformers: SPEC = 0
Current transformation ratio| CT = 1 (default)| CT = Ratio of
the installedcurrent transformer
Potential transformation ratio| PT = 1.0 (default)| PT = Ratio
of the installed potential transformer
Wiring mode| 3P4W: net = n.34 (default)| 3P3W: net = n.33| 3P4W: net =
n.34 (default)| 3P3W: net = n.33| 3P4W: net = n.34 (default)| 3P3W: net = n.33
Note
- You need to set parameters after cable connections are complete. For details, see section 4 “Display and Parameter Settings”.
- This meter is generally used in commercial and industrial high-current scenarios. In external CT scenarios, the precision of the secondary-side current is ±5 mA. For example, if a CT with a transformer ratio of 400/1 is selected, the error is ±2 A. This meter is not recommended in scenarios where the plant power is low or the control precision of the grid-connection point is high. Instead, use a meter with higher precision.
3.3 Current and Voltage Direct Connection (Current ≤ 80 A and Line Voltage ≤ 500 V)
SmartLogger networking
-
Three-phase four-wire connection
Note
In the SmartLogger networking scenario, the power meter is connected to the SmartLogger. In the nonSmartLogger networking scenario, the power meter is connected to the inverter. (1) Shield layer of the signal cable -
Three-phase three-wire connection (1) Shield layer of the signal cable
Note
You need to set parameters after cable connections are complete.
For details, see section 4 “Display and Parameter Settings”.
Smart Dongle networking -
Three-phase four-wire connection (1) Shield layer of the signal cable
-
Three-phase three-wire connection (1) Shield layer of the signal cable
Note
You need to set parameters after cable connections are complete. For details, see section 4 “Display and Parameter Settings”.
3.4 Connection Through Current Transformer and Voltage Direct Connection
(Current > 80 A, Line Voltage ≤ 500 V)
Current transformers specifications: The accuracy class is 0.5, and the
current on the secondary side is 1 A or 5 A.
SmartLogger networking
-
Three-phase four-wire connection
Note
In the SmartLogger networking scenario, the power meter is connected to the SmartLogger. In the nonSmartLogger networking scenario, the power meter is connected to the inverter. (1) Shield layer of the signal cable -
Three-phase three-wire connection
CAUTION
Please ensure that the ground cable is installed securely. Poor grounding may cause electric shocks.
Note -
You need to set parameters after cable connections are complete. For details, see section 4 “Display and Parameter Settings”.
-
For the three-phase three-wire connection, phase B does not need to connect to a current transformer.
(1) Shield layer of the signal cable Smart Dongle networking -
Three-phase four-wire connection (1) Shield layer of the signal cable
-
Three-phase three-wire connection
CAUTION
Please ensure that the ground cable is installed securely. Poor grounding may cause electric shocks.
Note -
You need to set parameters after cable connections are complete. For details, see section 4 “Display and Parameter Settings”.
-
For the three-phase three-wire connection, phase B does not need to connect to a current transformer.
(1) Shield layer of the signal cable
3.5 Connection Through Current Transformer and Potential Transformer (Current ≥ 0 A, Line Voltage > 500 V)
-
Three-phase four-wire connection
-
Three-phase three-wire connection
CAUTION
Please ensure that the ground cable is installed securely. Poor grounding
may cause electric shocks.
Note
You need to set parameters after cable connections are complete. For details,
see section 4 “Display and Parameter Settings”.
Display and Parameter Settings
4.1 Display
The button → is used to switch the displays. Set parameter disp to enable the
rotation display function.
No.| Display| Description| No.| Display|
Description
---|---|---|---|---|---
1| | Positive active energy = 10000.00 kWh| 2| | Negative active energy =
2345.67 kWh
3| | None parity, 8 data bits, and 1 stop bit; baud rate = 9600 bps (default)|
4| | 011 represents address (default)
5| | Phase A voltage = 220.0 V| 6| | Phase B voltage = 220.1 V
7| | Phase C voltage = 220.2 V| 8| | Phase A current = 5.000 A
9| | Phase B current = 5.001 A| 10| | Phase C current = 5.002 A
11| | Total phase active power = 3.291 kW| 12| | Phase A active power = 1.090
kW
13| | Phase B active power = 1.101 kW| 14| | Phase C active power = 1.100 kW
15| | Total phase power factor PFt = 0.500| 16| | Phase A power factor PFa =
1.000
17| | Phase B power factor PFb = 0.500| 18| | Phase C power factor PFc =
–0.500
4.2 Parameter Settings
No. | Parameter | Value Range | Description |
---|---|---|---|
1 | 1–6553 | Current transformer ratio | |
2 | 0.1–999.9 | Potential transformer ratio | |
3 | 1: 645 |
2: n.2
3: n.1
4: E.1
5: 0.1| Communication protocol switchover: 1: Factory mode 2: None parity, 2
stop bits, n.2 3: None parity, 1 stop bit, n.1 4: Even parity, 1 stop bit, E.1
5: Odd parity, 1 stop bit, 0.1
4| | 1–247| Modbus communication address
5|
| 0: 1.200
1: 2.400
2: 4.800
3: 9.600
4: 19.20
5: 115.2| Communication baud rate: 0: 1200 bps
1: 2400 bps
2: 4800 bps
3: 9600 bps
4: 19200 bps
5: 115200 bps
6| | 0: n.34
1: n.33| Wiring mode:
0: n.34, three-phase four-wire 1: n.33, three-phase three-wire
7| | 0–30| Rotation display time (s):
0: Fixed display
1–30: Time interval of rotation display
8| | 0–30| Backlight illumination time control (minutes):
0: Steady on
1–30: Time of backlight illumination without key operation
9| | 0: ct
1: dc| Channel switchover:
0: Transformer connection
1: Direct connection
4.3 Parameter Setting Operations
Button description: SET means “confirm” or “cursor move” (when inputting
numbers or parameters), ESC means “exit”, and → means “add”. The default user
password is 701.
- Set wiring mode (three-phase four-wire or three-phase three-wire) and channel switchover (direct connection or current transformer connection):
- Set the current transformation ratio or potential transformation ratio:
- Set communication address or baud rate:
- Modify user password:
Troubleshooting
Symptom | Cause Analysis | Troubleshooting Method |
---|---|---|
No display after power-on | 1. The cable connection is incorrect. | |
2. The voltage supplied to the meter is abnormal. | 1. Connect the cables |
correctly (see wiring diagrams).
2. Supply the correct voltage based on the specifications.
Abnormal RS485 communication| 1. The RS485 communication cable is
disconnected, short-circuited, or reversely connected.
2. The communication address, baud rate, data bit, and parity bit of the
meter do not match those of the inverter.| 1. If the communication cable is
faulty, replace it.
2. Set the communication address, baud rate, data bit, and parity bit of the
meter to be the same as those of the inverter by pressing buttons. For
details, see “Parameter Settings”.
Inaccurate metering| 1. The cable connection is incorrect. Check whether the
corresponding phase sequence of voltage and current is correct.
2. Check whether the high and low ends of the current transformer inlet are
reversely connected. If the values Pa, Pb, and Pc are negative, the high and
low ends are connected incorrectly.| 1. Connect the cables correctly (see
wiring diagrams).
2. If a negative value is displayed, change the cable connection for the
current transformer to ensure that the high and low ends are connected
correctly.
Installation Verification
- Check that all mounting brackets are securely installed and all screws are tightened.
- Check that all cables are reliably connected in correct polarity without short circuit.
Issue: 08