FORIOUS B091JV5268 55 Inch Multi Function Shower Panel Instructions

May 15, 2024
FORIOUS

FORIOUS B091JV5268 55 Inch Multi Function Shower Panel

TO GET STARTED

  • Before you begin, read all instructions carefully. This manual is a graphic reference for installation purposes. Some graphic elements and components may differ.
  • Inspect the unit carefully to ensure there is no damage or defects. If such is the case, please contact us freely.
  • Make sure you have received all parts (tools not included).
  • Consult local building codes to ensure that installation complies with standards In your area.

WE STRONGLY SUGGEST YOU LET A SPECIALIST PROCEED WITH THE INSTALLATION.

TECHNICAL DATA

  • Operating pressure: Max.1 MPa
  • Recommended operating pressure: 0.22-0.5MPa
  • Test pressure: 1.5MPa (1 MPa=1 0bar=147 PSI)
  • Hot water temperature: Max.176 F
  • Recommended hot water temperature: 149 F
  • Connections (cold right-hot left): G1/2

RECOMMENDED TOOLS FOR INSTALLATION

FORIOUS-B091JV5268-55-Inch-Multi-
Function-Shower-Panel-fig-2

PARTS LIST

FORIOUS-B091JV5268-55-Inch-Multi-Function-Shower-Panel-
fig-3 FORIOUS-B091JV5268-55-Inch-
Multi-Function-Shower-Panel-fig-4

INSTALLATION GUIDE

  1. Step 1 Rain shower and Body shower panel connectFORIOUS-B091JV5268-55-Inch-Multi-Function-Shower-Panel-fig-5

  2. Step 2 Handheld shower holder installation

  3. Step 3 Measurement

    • Adjust the plumbing to ensure that there is adequate space for the shower to be installed.
    • Establish the precise height and position of the unit on the wall.
    • We recommend leaving a 10″(25 cm) space between the shower head and the average height of the people in the house as well as a minimum distance of 1″(2.5 cm) from the ceiling.FORIOUS-B091JV5268-55-Inch-Multi-Function-Shower-Panel-fig-8
    • Measure the total height A from the floor to the bottom Of the shower panel,
    • Measure the distance C between the lower bracket and the bottom of the shower panel,
    • Measure the distance B between the 2 brackets,
    • Project this measurement onto the wall to install the mounting brackets.
      Mark the position Of each screw hole Of both mounting brackets on the wall using a pencil.
  4. Step 4 Mounting Brackets Installation

  5. Step 5 Water supply checking and supply hoses connectionFORIOUS-B091JV5268-55-Inch-Multi-Function-Shower-Panel-fig-10FORIOUS-B091JV5268-55-Inch-Multi-Function-Shower-Panel-fig-11

  6. Step 6 Hand shower connectionFORIOUS-B091JV5268-55-Inch-Multi-Function-Shower-Panel-fig-12

  7. step 7 Battery Box InstallationFORIOUS-B091JV5268-55-Inch-Multi-Function-Shower-Panel-fig-13

  8. Step 8 Test

    • No water leakage at any connection;
    • All shower modes work well.

USAGE GUIDE

CARE AND MAINTENANCE

  • Wipe with a soft towel after each use. Use mild dishwashing detergent to keep surfaces bright and clean. Rinse well and dry with a clean cloth.
  • Powdered detergents and abrasive liquid cleaners may damage surfaces.
  • Do not allow the surface to come into contact with corrosive products such as acetone, nail polish remover, dry cleaning solution, lacquer, paint thinner, gasoline, etc.
  • Any cleaning product should be tested on an inconspicuous surface before using to clean.

MORE DESIGN

  • The shower panel designs are different, the instructions just for reference for the installation and usage.
  • The Specific operations are subject to the actual shower panel.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals