GRANDJOY W-23 Shower System with Body Jets Instruction Manual

June 17, 2024
GRANDJOY

Instruction Manual
Rain Shower System

W-23 Shower System with Body Jets

W-23 (YF)

Warranty Duration
Ail parts of this faucet system are warranted to the original purchaser to be free from defects in material and workmanship for a lifetime.
Repair and Replacement
If the product has defects in material and workmanship within the warranty period,we will repair or replace the product free of charge.However,you may be required to provide the invoice when requesting repairs or replacement from us.
Exclusions
We shall not be responsible for the following cases:

  • Damage to the product caused by improper installation,misuse,unauthorized repair or replacement,or abuse(including damage during shipment).
  • Damage to the product caused by improper dismantlement after installation.
  • Damage resulting from abnormal water pressure and impurities in water pipes is not covered under this warranty.
  • Rust on the product due to insufficient care and maintenance is not covered under this warranty.
  • Damage caused by natural disasters such as fire,flood,earthquake,electric storms, etc. ,is not covered under this warranty.
    I hope this helps! If you have any further questions or concerns,please let me know.
    Having Trouble? Contact us.

GRANDJOY W-23 Shower System with Body Jets - Figure 1

Installation Condition

  1. Check the accessories list to verify that all parts are complete in this package.
  2. Do not disassemble the main body by yourself.
  3. Connect inlet pipes to supply valves.
  4. Make sure inlet pipes and supply valveshave benn installed and cleaned,with noimpurities in the piprline.
  5. After installation,check all joints for leakages.
  6. Do not leave the rain shower system exposed to a severely corroseive environment.

YOU MAY NEED:

GRANDJOY W-23 Shower System with Body Jets - Figure 3

3 functions wall mounted luxury shower faucet
Model: A
Accessories List

GRANDJOY W-23 Shower System with Body Jets - Figure 4

No. Part name Qty No. Part name Qty
1 Shower head 1 11 Main body 1
2 Shower arm 1 12 Deck plate 1
3 Shower arm cup 1 13 Water diverter 2
4 Connector 1 14 Handle 1
5 Cup 1 15 Main body spare parts 4
6 Showe hand 1 16 Instruction manual 1
7 Shower hose 1 17 Gloves 2
8 Lifting rod 1 18 water distribution Handle parts 1 set
9 Body jet cover 6 19 Lifting rod parts 1set
10 Body jet 6 20

Essential dimensions & water pipe line

GRANDJOY W-23 Shower System with Body Jets - Figure 5

The installation depth of shower holder and body jet

GRANDJOY W-23 Shower System with Body Jets - Figure 6

The thickness of the tile must be calculated for installation.
Connector size of male thread: USA: 1/2″-14NPT, Canada: 1/2″-14NPT, Europe: G1/2″.

Installation Depth Of Main Body

GRANDJOY W-23 Shower System with Body Jets - Figure 7

Notice:

  1. The installation depth of the main body should be no less than 2 3/8″ (60mm) and no more than 3 17/32″ (90mm), including the thickness of the tile. Otherwise, the deck plate cannot be installed.
  2. The opening size of ceramic tile shall be smaller than the deck plate size.

Piping Instructions Before Tiling

GRANDJOY W-23 Shower System with Body Jets - Figure 8

  1. As shown in the figure, the inlet and outlet pipes are pre-buried. Please pay attention to the correct direction when installing the pre-buried main body.
  2. Before tiling, turn on the water to test whether the left and right inlet pipes are tightly connected without leakage.
    Then, adjust the flow switch to the “on” position to check for leaks in the mixed outlet pipes.

Main Body Valve Installation

GRANDJOY W-23 Shower System with Body Jets - Figure 9

  1. Make marks according to the size of the main body valve, and then drill anchors into the wall (concrete wall).
  2. Lock the main body to wood directly with screws (wood wall).
  3. When installing the main body, please mark the UP side up and do not install it upside down.
  4. Please note that the level meter should be parallel to the wall; otherwise, the deck plate cannot be installed.

Do not remove the white wear ring; otherwise, the handwheel will be damaged.
Water flow control:clockwise Turn-down and stop ,anti-clockwise Turn-up to max

Precautions for Handwheel Installation

  1. The line can’t be misplaced; it should be kept in line. Otherwise, the water temperature of 100°F or 38°C will not be correct.

  2. Please ensure that the plastic locating ring (A) and handwheel locating pin (B) are kept in the same line with 100°F or 38°C. Otherwise, the water temperature will be incorrect.
    GRANDJOY W-23 Shower System with Body Jets - Figure 11

Body Jets Installation (Model:A& B)

GRANDJOY W-23 Shower System with Body Jets - Figure 13

Step 1. Wrap the threaded pipe of NPT1 /2 with Teflon tape and screw it into the wall.
Step 2.Cut off any excess parts using a saw.
Step 3.Screw the massage body jet onto the wall.

Installation of the Hand Shower Holder

GRANDJOY W-23 Shower System with Body Jets - Figure 14

  1. Connect shower arm with the cover before screwing arm into riser connection to prevent damage.
  2. Fix shower head onto shower arm and apply tape to pipe threads on both ends.
  3. Do not overtighten shower head.it is 360°swivel connection.

Lifting Rod Installation

GRANDJOY W-23 Shower System with Body Jets - Figure 15GRANDJOY W-23 Shower System with Body Jets - Figure
16

  1. Mark the punch position with a pen,drill holes with a 6mm electric drill,knock the pellets in Lastly,Place the base and screw in the screws.
  2. Put the Shower Elevator Rack into the base,then Tighten the screw,done.

4 functions wall mounted luxury shower faucet
Model:B
Accessories List

GRANDJOY W-23 Shower System with Body Jets - Figure 17

No. Part name Qty No. Part name Qty
1 Shower head 1 11 Main body 1
2 Shower arm 1 12 Deck plate 1
3 Shower arm cup 1 13 Water diverter 2
4 Connector 1 14 Handle 1
5 Cup 1 15 Main body spare parts 4
6 Showe hand 1 16 Instruction manual 1
7 Shower hose 1 17 Gloves 2
8 Lifting rod 1 18 water distribution Handle parts 1 set
9 Body jet cover 6 19 Lifting rod parts 1set
10 Body jet 6 20

Essential dimensions & water pipe line

GRANDJOY W-23 Shower System with Body Jets - Figure 18

The installation depth of shower holder and body jet

GRANDJOY W-23 Shower System with Body Jets - Figure 19

The thickness of the tile must be calculated for installation.
Connector size of male thread: USA: 1/2″-14NPT, Canada: 1/2″-14NPT, Europe: G1/2″.

Installation Depth Of Main Body

GRANDJOY W-23 Shower System with Body Jets - Figure 20

Notice:

  1. The installation depth of the main body should be no less than 2 3/8″ (60mm) and no more than 3 17/32″ (90mm), including the thickness of the tile. Otherwise, the deck plate cannot be installed.
  2. The opening size of ceramic tile shall be smaller than the deck plate size.

Piping Instructions Before Tiling

GRANDJOY W-23 Shower System with Body Jets - Figure 21

  1. As shown in the figure, the inlet and outlet pipes are pre-buried. Please pay attention to the correct direction when installing the pre-buried main body.
  2. Before tiling, turn on the water to test whether the left and right inlet pipes are tightly connected without leakage.
    Then, adjust the flow switch to the “on” position to check for leaks in the mixed outlet pipes.

Main Body Valve Installation

GRANDJOY W-23 Shower System with Body Jets - Figure 22

  1. Make marks according to the size of the main body valve, and then drill anchors into the wall (concrete wall).
  2. Lock the main body to wood directly with screws (wood wall).
  3. When installing the main body, please mark the UP side up and do not install it upside down.
    Please note that the level meter should be parallel to the wall; otherwise, the deck plate cannot be installed.

Do not remove the white wear ring; otherwise,the handwheel will be damaged.

Precautions for Handwheel Installation

Please ensure that the plastic locating ring (A) and handwheel locating pin (B) are kept in the same line with 100°F or 38°C. Otherwise, the water temperature will be incorrect.

Body Jets Installation (Model:A & B)

GRANDJOY W-23 Shower System with Body Jets - Figure 26

Step 1. Wrap the threaded pipe of NPT1 /2 with Teflon tape and screw it into the wall.
Step 2.Cut off any excess parts using a saw.
Step 3.Screw the massage body jet onto the wall.

Installation of the Hand Shower Holder

GRANDJOY W-23 Shower System with Body Jets - Figure 27

  1. Connect shower arm with the cover before screwing arm into riser connection to prevent damage.
  2. Fix shower head onto shower arm and apply tape to pipe threads on both ends.
  3. Do not overtighten shower head.it is 360°swivel connection.

Installation The Hand Show Holder(Model:A & B)

GRANDJOY W-23 Shower System with Body Jets - Figure 28

Step1 .Screw the thread into the water pipe inside the wall
Step2.Screw the main body into the thread.
Step3. Rotate and fix the body with the special-shaped wrench
Step4.Connect hand shower and the hose.

Do’s

  1. In order to keep the mixer surface bright, please clean the mixer regularly.
  2. Rinse the faucet with clean water and wipe it with a soft cotton cloth.
  3.  Use one of the following cleaners to remove dirt from the surface:
    a.Mild liquid cleaner.
    b.Colorless glass cleaner and powder cleaner that do not cause abrasion and can be dissolved completely.
    c.Polish liquid that does not cause abrasion.

Don’ts
a. Avoid using cleaning powder, harsh cleaning chemicals, brushes and coarse cloth to prevent scratching and friction.
b.Do not use acid cleaners to clean the faucet as they may cause surface corrosion of the faucet. If the faucet is exposed to harmful acid substances, please rinse it immediately with water.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals