BAXI 630 Gas Fired Wall Mounted Condensing Boiler User Guide
- June 17, 2024
- BAXI
Table of Contents
User Guide
Gas Fired Wall Mounted
Condensing Boiler Heat
613 – 616 – 619 – 625 – 630
630 Gas Fired Wall Mounted Condensing Boiler
Please keep these instructions in a safe place.
If you move house please hand them over to the next occupier.
Model Range
Baxi 613 Heat
G.C.Nº 41-470-66
Baxi 616 Heat
G.C.Nº 41-470-67
Baxi 619 Heat
G.C.Nº 41-470-68
Baxi 625 Heat
G.C.Nº 41-470-69
Baxi 630 Heat
G.C.Nº 41-470-70
Dear Customer,
Thank you for purchasing this appliance.
Please read this manual carefully before using the product and keep it in a
safe place for future reference.
In order to ensure continued safe and efficient operation we recommend that
the product is regularly maintained. Our Service and After Sales organization
can assist with this.
We hope you will receive many years of satisfactory service. © Baxi Heating UK
Ltd 2019 All rights reserved. No part of this publication may be reproduced or
transmitted in any form or by any means, or stored in any retrieval system of
any nature (including in any database), in each case whether electronic,
mechanical, recording or otherwise, without the prior written permission of
the copyright owner, except for permitted fair dealing under Copyrights,
Designs and Patents Act 1988.
Applications for the copyright owner’s permission to reproduce or make other
use of any part of this publication should be made, giving details of the
proposed use, to the following address:
The Company Secretary, Baxi Heating UK Limited, Brooks House, Coventry Road,
Warwick. CV34 4LL
Full acknowledgement of author and source must be given.
WARNING: Any person who does any unauthorised act in relation to a
copyright work may be liable to criminal prosecution and civil claims for
damages.
The Benchmark Scheme
Baxi Heating UK Ltd is a licensed member of the Benchmark Scheme which aims to
improve the standards of installation and commissioning of domestic heating
and hot water systems in the UK and to encourage regular servicing to optimise
safety, efficiency and performance.
Benchmark is managed and promoted by Heating and Hotwater Industry Council.
For more information visit
www.centralheating.co.uk
Introduction
1.1 General
WARNING
Installation, repair and maintenance must only be carried out only by a
competent person. This document is intended for use by competent persons,
All Gas Safe registered engineers carry an ID card with their licence number
and a photograph. You can check your engineer is registered by telephoning
0800 408 5500 or online at
www.gassaferegister.co.uk
This manual is intended for the user of the Baxi 600 Heat boiler. If the
appliance is sold or transferred, or if the owner moves leaving the appliance
behind you should ensure that the manual is kept with the appliance for
consultation by the new owner and their installer.
The appliance is designed as a boiler for use in residential domestic
environments on a governed meter supply only. The selection of this boiler is
entirely at the owner’s risk. If the appliance is used for purposes other than
or in excess of these specifications, the manufacturer will not accept any
liability for resulting loss, damage or injury.
The manufacturer will not accept any liability whatsoever for loss, damage or injury arising as a result of failure to observe the instructions for use, maintenance and installation of the appliance.
1.2 additional Documentation
Various timers, external controls, etc. are available as optional extras.
Full details are contained in the relevant sales literature.
1.3 Symbols Used
In these instructions, various danger levels are employed to draw the user’s
attention to particular information. In so doing, we wish to safeguard the
user’s safety, prevent hazards and guarantee correct operation of the
appliance.B
DANGER
Risk of a dangerous situation causing serious physical injury.
WARNING
Risk of a dangerous situation causing slight physical injury.
CAUTION
Risk of material damage.
Signals important information.
Signals a referral to other instructions or other pages in the instructions.
1.4 Abbreviations / Glossary
DHW: Domestic Hot Water
CH: Central Heating
GB: Great Britain
IE: Ireland
BS: British Standard
HHIC: Heating and Hotwater Industry Council
1.5 Extent of Liabilities
1.5.1. Manufacturer’s Liability
Our products are manufactured in compliance with the requirements of all
applicable Directives and Regulations. They are therefore delivered with
****marking and all relevant documentation. In the interest of customers, we
are continuously endeavouring to make improvements in product quality. All the
specifications stated in this document are therefore subject to change without
notice.
The manufacturer will not accept any liability for loss, damage or injury
arising as a result of:-
Failure to abide by the instructions on using the appliance.
Failure to regularly maintain the appliance, or faulty or inadequate
maintenance of the appliance.
Failure to abide by the instructions on installing the appliance.
This company declares that no substances harmful to health are contained in
the appliance or used during appliance manufacture.
The appliance is suitable only for installation in GB and IE and should be
installed in accordance with the rules in force, and only used in a suitably
ventilated location.
In GB, the installation must be carried out by a Gas Safe Registered
Installer. It must be carried out in accordance with the current and relevant
requirements of legislation and guidance.
Where no specific instructions are given, reference should be made to the
relevant British Standard Code of Practice.
In IE, the installation must be carried out by a competent person and
installed in accordance with the current edition of .S. 813 ‘Domestic Gas
Installations’, the current Building Regulations and reference should be made
to the current ETCI rules for electrical installation.
Incorrect installation could invalidate the warranty and may lead to
prosecution.
1.5.2 Installer’s Responsibility
The installer is responsible for the installation and initial start up of the
appliance. The installer must adhere to the following instructions:
Read and follow the instructions given in the manuals provided with the
appliance.
Carry out installation in compliance with the prevailing legislation and
standards.
Ensure the system is flushed and inhibitor added.
Install the flue/chimney system correctly ensuring it is operational and
complies with prevailing legislation and standards, regardless of location of
the boiler’s installation.
Only the installer should perform the initial start up and carry out any
checks necessary.
Explain the installation to the user.
Complete the Benchmark Commissioning Checklist in the Installation Manual –
this is a condition of the warranty !
Warn the user of the obligation to check the appliance and maintain it in good
working order.
Give all the instruction manuals to the user.
1.5.3. User’s Responsibility
To guarantee optimum operation of the installation, you must observe the
following instructions:
Read and observe the instructions given in the manuals supplied with the
appliance.
Seek the assistance of a qualified installer for the installation and initial
commissioning.
Ask the installer to explain the installation.
Have the required annual inspection and maintenance carried out by a qualified
installer and ensure the Benchmark
Service Record in the Installation Manual is completed – this is a condition
of the warranty !
Keep the manuals in good condition and near to the appliance.
This appliance must not be used by people with a lack of experience or knowledge, unless they are supervised by someone familiar with the appliance or if they have been instructed on how to operate the appliance correctly. Do not allow children to operate or play with the appliance.
Safety
2.1 General Safety Instructions
DANGER
If you smell gas:
- Turn off the gas supply at the meter
- Open windows and doors in the hazardous area
- Do not operate light switches
- Do not operate any electrical equipment
- Do not use a telephone in the hazardous area
- Extinguish any naked flame and do not smoke
- Warn any other occupants and vacate the premises
- Telephone the National Gas Emergency Service on:- 0800 111 999
The boiler can be isolated at the gas valve under the appliance by turning the
tap through 90° (/s turn).
For advice please contact your Installer, Annual Service Provider or Baxi
Customer Support – The Service Division of Baxi. You can contact Baxi Customer
Support on telephone number 0344 871 1545.
When contacting Baxi Customer Support it will be useful to have the ‘Benchmark
Checklist’ at the back of the Installation & Service Manual to hand as it
includes details relevant to the boiler and installation.
WARNING
Do not touch flue/chimney pipes. Depending on the settings of the appliance,
the temperature of flue/chimney pipes may exceed 60 °C.
Do not touch radiators for long periods. Depending on the settings of the
appliance, the temperature of radiators may reach 85 °C.
Take precautions with domestic hot water. Depending on the settings of the
appliance & cylinder thermostat, domestic hot water temperature may exceed 65
°C.
CAUTION
Do not neglect to service the appliance. Contact a qualified professional
or take out a maintenance contract for the annual servicing of the appliance.
WARNING
This boiler can be used by children aged 8 years and above and by persons with
reduced physical, sensory or mental capabilities or lack of experience and
knowledge when they have been given supervision or instruction concerning the
safe use of the device and
understand the resulting risks. Children must not be allowed to play with the
appliance. Cleaning and user maintenance must not be carried out by children
without supervision.
2.2 Recommendations
CAUTION
Only qualified professionals are authorised to work on the appliance and the
installation.
For sealed systems regularly check the water pressure in the system
(recommended pressure is 1.5 bar). Your installer will advise on the method of
repressurising if required.
Keep the appliance accessible at all times.
Do not remove or cover the serial number label affixed to the slide-out flap
at the boiler lower left. It must remain legible throughout the lifetime of
the appliance.
2.2.1 Benchmark Commissioning Checklist
-
Please ensure that the installer has fully completed the Benchmark Checklist on the inside back pages of the installation instructions supplied with the product and that you have signed it to say that you have received a full and clear explanation of its
operation. The installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regulations (England and Wales). -
All installations must be notified, by the installer, to Local Area Building Control either directly or through a Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer who should, on receipt, write the
Notification Number on the Benchmark Checklist. -
This product should be serviced annually to optimise its safety, efficiency and performance. The service engineer should complete the relevant section of the Benchmark Service Record in the Installation & Service manual after each service.
-
The completed Benchmark Checklist & proof of annual servicing (where applicable) will be required in the event of any warranty work.
See Section 12 for warranty information.
Technical Specifications
3.1 Technical Data
NOTE: All data in this section are nominal values and subject to normal
production tolerances
Flow Temperature (adjustable) 30°C1080°C (£ 5° C)
Outercase Dimensions
Overall Height inc Five Elbow – 790mm
Casing Height – 625mm
Casing Width – 370mm
Casing Depth – 280mm
Clearances
Both Sides 5mm Min
Above Casing (Top Flue) 190mm Min
Above Casing (Rear Flue) 35mm Min
Below Casing (in Cupboard) 35mm Min
Below Casing 120mm Min
Front (For Servicing) 500mm Min
Front (In Operation) 5mm Min
Ventilation of Compartment
Where the boiler is installed in a cupboard or compartment, no air vents are
required for cooling purposes providing that the minimum dimensions above are
maintained .
Electrical Supply 230V~ 50Hz
(Appliance must be connected to an earthed supply)
Power Consumption
613model 17W
616 model 20W
619 model 23W
625model 33W
630 model 44W
External Fuse Rating 3A
3.1.1. Clearances
- A flat vertical area is required for the installation of the boiler.
- These dimensions include the necessary clearances around the boiler for case removal, spanner access and air movement (Figs. 1 & 2). Additional clearances may be required for the passage of pipes around local obstructions such as joists running parallel to the front face of the boiler.
Description of the Product
4.1 General Description
-
The Baxi 600 Heat is a wall mounted condensing boiler which is room sealed and fan assisted, and will serve central heating and stored domestic hot water
-
The boiler will be one of the following outputs:-
613 model – 13 kW
616 model – 16 kW
619 model – 19 kW
625 model – 25 kW
630 model – 30 kW -
The boiler is factory set for use only on Natural Gas (G20).
-
The boiler model, serial number and Gas Council number are shown on the information label under the boiler (Fig. 3). This is for user reference.
4.2 Operating Principle
4.21 In Operation
- Whilst the boiler is in operation cooled flue gases are discharged through the flue gas discharge pipe. This may appear as a cloud of steam which is normal.
- Condensed water is discharged from the boiler heat exchanger into a pipe (the condensate drain). This pipe must never be altered or re-routed except by a qualified professional.
4.3 Control Panel Description
4.3.1 User Interaction Controller (Fig. 4)
Key to symbols:-
Heating Water Temperature
Sweep Key and Status Signals
RESET Reset button and On/Off Signal
- The User Interaction Controller has 2 illuminating push buttons which provide information about the operating condition of the boiler.
- The RESET button illuminates green when the boiler receives ademand for CH or DHW.
- The button can flash orange, green or red and at different frequencies.
- The User Interaction Controller also has one rotary knob. The rotary knob is used to set the maximum flow temperature of the heating water.
- The temperature selected by the rotary knob must be set to a higher temperature than the cylinder thermostat to achieve the required hot water demand.
4.3.2 Indicator Lights (Fig. 5) Normal Operation – The green light remains on for around seven
seconds and then extinguishes briefly, repeating the sequence whilst the
boiler is operating
The symbol indicates the Status Light ON.The colour of the status light on the boiler control panel and the
number of times that it flashes indicates whether the boiler is working
normally, has a problem or requires servicing.
See Section 8.1. for details of the fault conditions.
Boiler Operating The light will flash orange at EVERY heating demand. The
number of flashes will correspond with the heat output of the boiler. This is
normal and does not indicate a fault condition. During normal running
illuminates green and blinks off momentarily every seven seconds approximately
to show the boiler is running normally and supplying heat (Fig. 6).
Error When flashing green light indicates that the boiler has detected a
problem, and is attempting to resolve it. If it does not succeed the boiler
will go into fault mode and display a red light.
Defect When flashing red light indicates that the boiler has a fault. Press
the RESET button for a minimum of 5 seconds to try and clear the fault
condition.
Alock-out condition can be re-set up to 5 times within one hour using the
reset button. Any fault that occurs repeatedly should be fully investigated
and appropriate remedial actions taken by your installer or Baxi Customer
Support.
If there is a continuous red light, contact your installer or Baxi Customer
Support
The lights will be OFF when there is no demand for heat.
4.4 Standard Delivery
1. The literature pack contains:
Literature pack
- Installation & Servicing Manual (including ‘benchmark’)
- User Guide Instructions
- Flue Accessories & Fitting Guide
- Warranty Documentation
- System Additive Leaflets
- Wall Template
- Product Leaflet
- Package Leaflet
4.5 Accessories & Options
4.5.1 Optional Extras
1. Various items are available as optional extras.
Flue Accessories (elbows, extensions, clamps etc.) (refer to the Flue
Accessories & Fitting Guide supplied in the literature pack.)
Remote relief valve kit
1M Condensate Drain Pipe ‘Trace Heating’ Element
2M Condensate Drain Pipe ‘Trace Heating’ Element
3M Condensate Drain Pipe ‘Trace Heating’ Element
5M Condensate Drain Pipe ‘Trace Heating’ Element
Any of the above MUST be fitted ONLY by a qualified competent person. Further
details can be found in the relevant sales literature and at
www.baxi.co.uk
Operation
5.1 Operation Checking Procedure & Basic Fault IdentificationIf you don’t know what you need to do to get the boiler to light, or need help with the system and controls, contact your installer as soon as possible
5.2 Shutdown
- If it is anticipated that the boiler will not be used for a long period or the property is to be unoccupied it is recommended that the system is drained if the electricity & gas supplies are to be turned off. Your installer will be able to offer advice.
5.3 Frost Protection
- To prevent radiators and the system from freezing in rooms where there is a risk of frost (e.g. a garage or storage room), a frost thermostat can be connected to the system
Settings
6.1 Setting the Boiler Flow Temperature
To increase or decrease the boiler temperature:-
- Turn the rotary knob to the right (Fig. 7) to increase the boiler temperature.
- Turn the rotary knob to the left (Fig. 7) to decrease the boiler temperature.
- To achieve the required domestic hot water temperature the rotary knob must be set to a higher temperature than that selected on the cylinder thermostat.
Maintenance
7.1 General
-
The boiler does not require any special maintenance.
However, the boiler must be serviced annually in accordance with the Installation and Service Manual and the relevant section of the Benchmark Service Record completed in order to maintain the warranty.
Taking out a maintenance contract is recommended.
CAUTION
Maintenance operations must be performed by a qualified competent person.
Use only genuine spare parts. -
The painted panels should be wiped with a damp cloth and then dried completely. DO NOT USE ABRASIVE CLEANING AGENTS.
7.2 Maintenance Instructions
- The central heating system should be checked regularly. Proceed as follows:
For Sealed Systems
If the water pressure is lower than 0.7 bar, the water must be topped up. If necessary: top up the CH system (recommended water pressure between 1 and 2 bar).
• Check radiators for leaks and (especially in damp areas) for rust.
• Open and close the radiator valves several times a year to ensure they can still be rotated.
• Only clean the outside of the boiler with a damp cloth. Do not use abrasive cleaning agents.
CAUTION
Only a qualified installer may clean the inside of the boiler.
7.3 Filling the System
The boiler will be installed on either an open-vented or sealed (pressurised)
heating system. If you are unsure which type of system you have consult your
installer.
Sealed systems may require periodic re-pressurisation. If this is required on
a regular basis a fault or leak is indicated. Seek advice from your installer.
7.4 Venting the System
If any air is present in the appliance or system it must be removed in order to prevent nuisance noises that may occur during operation. The boiler has an inbuilt auto air vent to aid the removal of air and is supplied in the open position. Proceed as follows:
-
Open the valves of all the radiators connected to the system.
-
Set the room thermostat to the highest possible temperature and any timers to ‘ON’.
-
Wait until the radiators are warm.
-
Switch off the boiler.
-
Vent the radiators. Work from the lowest radiator in the property.
-
Open the bleed vent with the key, keeping a cloth pressed against the vent.
-
Wait until water comes out of the bleed vent and then close.
WARNING
The CH water in the radiators will still be hot. -
Switch the boiler on.
-
After venting, if the system is of the sealed (pressurised) type check that the water pressure is still adequate.
For sealed systems – if the water pressure is lower than 0.7 bar, the water must be topped up (recommended water pressure between 1.0 and 2.0 bar when the system is cold). -
Reset the room thermostat to the desired temperature..
7.5 Draining the System
It may be necessary to drain the CH system if radiators need to be replaced or removed, if there is a major water leak or if there is a risk of freezing. Proceed as follows:
-
Open the valves of all the radiators connected to the system.
-
Switch off or disconnect the boiler’s electrical isolation point.
-
Wait until all the radiators are cold.
-
Connect a drain hose to the lowest draining point. Place the end of the hose in a drain or at a place where drained water will not cause any damage.
-
Open the CH system drain valve. Drain the system.
WARNING
The CH water may still be hot. -
When water stops flowing from the draining point, close the draining valve.
See Section 7.4 Venting the system. If in doubt seek advice from your installer.
After draining the concentration of system corrosion inhibitor and anti-freeze may become excessively diluted – seek advice from your installer.
Troubleshooting
8.1 Fault Warning & Lock-out Codes
No.of Flashes | Green Light Flashing | Red Light Flashing |
---|---|---|
1 | Temperature Protection | Sensor Error |
2 | Shutdown Input | High Temperature Protection |
3 | Flame Loss | Ignition Fault |
4 | Communication Fault | Fan Fault |
5 | Parameter Fault | Parameter Fault |
6 | Miscellaneous | Miscellaneous |
The symbol indicates the flashing Status Light.
-
The colour of the status light on the boiler control panel and the number of times that it flashes indicates whether the boiler is working normally, has a problem or requires servicing.
Fault – Warning When flashing green light indicates that the boiler has detected a problem, and is attempting to resolve it. If it does not succeed the boiler will go into lock-out mode and will display a red light.
Fault – Lock-out When flashing red light indicates that the boiler has a fault and has locked out. Press the RESET button for a minimum of 5 seconds to try and clear the fault condition. -
Allock-out condition can be re-set up to 5 times within one hour using the reset button. Any fault that repeats regularly should be fully investigated and appropriate remedial actions taken by your Installer, Annual Service Provider or Baxi Customer Support – The Service Division of Baxi.
-
If there is a continuous red light, contact your Installer, Annual Service Provider or Baxi Customer Support – The Service Division of Baxi, and inform them of the fault code displayed.
-
You can contact Baxi Customer Support on 0344 871 1545.
When contacting Baxi Customer Support it will be useful to have the ‘Benchmark Checklist’ at the back of the Installation & Service Manual to hand as it includes details relevant to the boiler and installation.
Upper Horizontal Line = Light ON
Lower Horizontal Line = Light OFF
Normal Operation
The symbolindicates the Status Light ON. 8.2 Fault Finding
- If the boiler is not working, check section 5.1 Operation Checking Procedure & Basic Fault Identification or the fault finding table. Contact your Installer.
Problem | Possible Causes |
---|---|
There is no domestic hot water and/or the radiators are cold. | Check that the |
boiler is being supplied with power (all controls set to ON).
Check the fuses and the switches.
If possible check whether the gas cock is properly open.
If the property has a prepayment meter ensure it has sufficient credit.
The boiler is not working.| Check if the Fault – Lock-out is illuminated. See
Section 8.1 to reset.
The domestic hot water is not hot enough.| The boiler temperature setting is
below the cylinder thermostat setting.
The radiators are not hot enough.| The radiator valves are not open.
The temperature set point for the heating is too low (check boiler & room
thermostat).
Decommissioning
9.1 Decommissioning Procedure
CAUTION
Only qualified professionals are authorised to work on the appliance and
system to decommission.
- If your the boiler needs to be decommissioned either temporarily or permanently the following should be performed:
• Switch off the boiler.
• Switch off the boiler’s electrical connection.
• Close the boiler gas valve.
• Drain the CH system.
Seek the advice of your installer.
Disposal
10.1 Disposal / Recycling
WARNING
Removal and disposal of the boiler must be carried out by a qualified
installer in accordance with local and national regulations.
Environmental
11.1 Energy Saving
Tips on saving energy:
Do not cover radiators. Do not hang curtains in front of radiators.
Install reflective panels behind the radiators to prevent heat losses.
Insulate the pipes in rooms that are not heated (cellars and lofts).
Install loft insulation & double glazing.
Use draught excluders where necessary.
Upgrade any older external controls.
Turn down room thermostats by 1°C
Turn off radiators in rooms not in use.
Do not run hot (or cold) water pointlessly.
Fit a water-saving shower head to save up to 40 % energy.
Take showers rather than baths. A bath consumes twice as much water and
energy.
11.2 Room Thermostats and Settings
Various models of room thermostats are available. The thermostat type and
setting affect the total energy consumption.
Afew tips:
Fully opening or closing thermostatic radiator valves result in unwanted
temperature fluctuations. Turn the thermostat knob or valve higher or lower in
small steps.
Lower the thermostat to approximately 20°C. This reduces heating costs and
energy consumption.
When rooms are to be aired, lower the thermostat well in advance.
When setting thermostats or programmers take account of days when nobody will
be in and of holidays.
Warranty
12.1 General
To make sure your boiler warranty is activated and maintained, it is essential that the:
- Benchmark checklist is completed by your installer
- Warranty is registered within 30 days
- Boiler has an annual service
Please note that failure to adhere to terms and conditions will make your warranty invalid.
12.2 Terms of Warranty
12.2.1 Standard Warranty Terms and Conditions
Warranty Registration, Service & Repair
For full terms and conditions, visit
www.baxi.co.uk/terms.
Benchmark Checklist
The Benchmark Checklist will be completed by your installer and records that
the boiler has been installed and commissioned correctly. It can be found at
the back of the installation and service manual and should be kept in a safe
place for the life of the boiler. We will check that the Benchmark Checklist
has been completed on an in-warranty visit.
Ways to register your warranty
If your boiler is eligible for an extended warranty, your installer may
register the product on your behalf and provide you with the relevant
documentation. Please check with your installer.
Should this not be the case, you can register your warranty online at
www.baxi.co.uk/registration Annual Service
Aservice must be completed every 12 months from the date of installation to
maintain your warranty.
This service must be completed by one of the following:
- AGas Safe registered installer/engineer
- Baxi Customer Support; call us 0344 871 1545
Please make sure that your engineer has logged the service information at the
back of the installation and service manual. You will be asked for your
service history on any in-warranty repair visit.
If you experience a problem with your boiler
For any in or out of warranty repair, Baxi Customer Support is on hand to help
you. Call our award-winning team to arrange for one of our nationwide team of
Gas Safe registered engineers to visit.
If your product is in warranty, everything is free of charge, subject to our
warranty terms and conditions. If it is out of warranty, we can still help and
offer a range of options you can choose from to suit your needs.
Contact Baxi Customer Support 0344 871 1545
Opening hours
Monday – Friday, 8.00am – 6.00pm
Weekends and Bank Holidays, 8.30am – 2.00pm
Please note calls may be recorded for training and monitoring purposes.
When contacting Baxi Customer Support, please have the following information to hand:
- Boiler serial number. This can be found on the appliance.
- Proof of purchase if you do not have the boiler serial number.
Please note that for in-warranty repairs, our engineers will ask to see your service history record, completed Benchmark Checklist and details of your installer. These can all be found in the installation and user manual.
Appendix
13.1 ErP Information
13.1.1. Product Fiche – Boiler Space Heaters
Product fiche for boiler space heaters
Baxi 600 Heat | 613 | 616 | 619 | 625 | 630 | |
---|---|---|---|---|---|---|
Seasonal space heating energy efficiency class | ||||||
Rated heat output (Prated or Psup) | kW | 13 | 16 | 19 | 25 | 30 |
Seasonal space heating energy efficiency | % | 93 | 93 | 93 | 93 | 93 |
Annual energy consumption | kWh | |||||
GJ | 11183 | |||||
40 | 13764 | |||||
50 | 16344 | |||||
59 | 21506 | |||||
77 | 25807 |
93
Sound power level LwA indoors| dB| 37| 39| 41| 45| 49
See
For specific precautions about assembling, installing and maintaining, consult
the relevant section as detailed on the Contents page.
13.1.2. Package Fiche – Boilers
Package fiche for boilers indicating the space heating energy efficiency of
the package
Seasonal space heating energy efficiency of boiler Temperature control
from fiche of temperature control Supplementary
boiler
from fiche of boiler Solar contribution
from fiche of solar device![BAXI 630 Gas Fired Wall Mounted Condensing Boiler
- Symbol 6](https://manuals.plus/wp-content/uploads/2024/02/BAXI-630-Gas-
Fired-Wall-Mounted-Condensing-Boiler-Symbol-6.jpg)(1) Iftank rating is above
A, use 0.95
Supplementary heat pump
from fiche of heat pumpSolar contribution AND Supplementary heat pump
select smaller valueSeasonal space heating energy efficiency of package Seasonal space heating energy efficiency class of packageBoiler and supplementary heat pump installed with low temperature heat emitters at 35°C ?
from fiche of heat pumpThe energy efficiency of the package of products provided for in this fiche may not correspond to its actual energy efficiency once installed in a building, as this efficiency is influenced by further factors such as heat loss in the distribution system and the dimensioning of the products in relation to building size and characteristics.
AD-3000743-01
I The value of the seasonal space heating energy efficiency of the
preferential space heater, expressed in %.
II The factor for weighting the heat output of preferential and supple mentary
heaters of a package as set out in the following table.
III The value of the mathematical expression: 294/(11 – Prated), whereby
‘Prated’ is related to the preferential space heater.
IV The value of the mathematical expression 115/(11 – Prated), whereby
‘Prated’ is related to the preferential space heater.
Weighting of boilers
Psup / (Prated + Psup)(1)(2)| II, package without hot water storage tank| II,
package with hot water storage tank
---|---|---
0| | 0| 0
0.1| | 0.3| 0.37
0.2| | 0.55| 0.70
0.3| | 0.75| 0.85
0.4| | 0.85| 0.94
0.5| | 0.95| 0.98
0.6| | 0.98| 1.00
≥ 0.7| | 1.00| 1.00
(1)
(2)| The intermediate values are calcu ated by linear interpolation between
the two adjacent values. Prated is related to the preferential space heater or
combination heater.
Package efficiency
Baxi 600 Heat | 613 | 616 | 619 | 625 | 630 | |
---|---|---|---|---|---|---|
Temperature control X | % | |||||
Temperature control Y | % |
Baxi Customer Support
0344 871 1545
Opening hours
Monday – Friday, 8.00am-6.00pm
Weekends and Bank Holidays, 8.30am-2.00pm
Please note calls may be recorded for training and monitoring purposes
baxi.co.uk
Register now to activate your warranty:
www.baxi.co.uk/registration
For the warranty to be maintained, please make sure…
- Benchmark checklist is completed
- Warranty is registered within 30 days
- The boiler has an annual service
For full terms and conditions, visit
www.baxi.co.uk/terms. Failure to adhere to
terms and conditions will void your manufacturer’s warranty.
Baxi Brooks House, Coventry Road, Warwick, CV34 4LL
Please ensure the boiler is installed in accordance with these installation instructions and that you adhere to the Building Regulations.
e&oe
All descriptions and illustrations provided in this document have been
carefully prepared but we reserve the right to make changes and improvements
in our products which may affect the accuracy of the information contained in
this leaflet. All goods are sold subject to our standard Conditions of Sale
which are available on request.
7726861-01 (1/19)
http://bit.ly/1nbbAnX
https://manual-hub.com/
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>