NATIONAL FLOORING EQUIPMENT 5700 Ride-on Scraper Instructions

June 4, 2024
NATIONAL FLOORING EQUIPMENT

Delta-Q Charger Upgrade, 5700/7700
402678 Rev C

NATIONAL FLOORING EQUIPMENT 5700 Ride-on Scraper

| Check
---|---
| Work
| Verify

Disclaimer: Delta-Q charger should only be used with AGM batteries.

  1. The charger is located in the bottom left pocket of the machine when looking from the front.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - machine
  2. Unplug the black connector with the orange and yellow wires from the black connector with the black and white wires.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - connector
  3. Unplug the connectors with the small red and black wires.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - Unplug
  4. Unplug the long blue connectors with the large red and black wires. NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - long blue
  5. The location of the screws (2) that mount the charger onto the machine are shown below.
  6. To remove the mounting screws: (1) Remove the front screw first; allow the charger to pivot down. (2) Ensure fingers are not under the charger, then remove the back screw.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - remove the mounting
  7. Remove the charger from the machine. CAUTION: To avoid personal injury, be cautious while lifting the charger. It weighs approx. 42 lbs.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - charger from
  8. If machine has a four-pole connector (left), use the adapter shown (right).NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - adapter shown
  9. Before inserting Delta-Q charger, ensure metal mounting plate is on the left (towards the outside of the machine) and the power cord is facing outward.
  10. Power cord will need to be wrapped around the side of the charger. Line up the prongs of the cord with the edge of the mounting plate. Power plug may vary.
  11. Place wire clamps onto power cord. They should line up with the mounting holes.
  12. Insert Delta-Q charger. Align plate to the two screws and tighten with the two nuts. Place all additional wires and cords on the right side of the charger.
  13. Place all additional wires and cords on the right side of the charger. Make sure the following wires are sticking out of the charger.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - additional
  14. Disconnect the (2) big blue connectors bolted on the front.
  15. Lift hood of machine; unplug seat harness if applicable.
  16. Disconnect (2) wires on the left valve bracket assembly.
  17. Remove (2) bolts on left valve bracket assembly.
  18. Lower assembly so that it rests parallel to the ground.
  19. Remove (3) bolts on the circuit breaker.
  20. Remove relay.
  21. Place LVI plate in between the frame and circuit breaker and orient as shown; screw (3) bolts back into place.
  22. Route metripack with black and red wires behind the harness and battery wires and across to the other side of the machine where the charger is.
  23. Locate the male metripack (red and black wires) from the LVI and the female metripack (red and black wires) pigtailed with the charger blue connector. Confirm that they are the metripacks with the correct wires.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - connector 1
  24. Connect the two metripacks together. Confirm that the wire colors are correct.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - metripacks
  25. Locate stand-alone female metripack connector.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - metripack connector
  26. Connect the female metripack to the male metripack (red and black wires) from the machine on the charger side.
  27. Remove black wire from the bottom left terminal.
  28. Fold wire over itself and seal with electrical tape.
  29. Attach the blue wire from the LVI to where the black wire was just removed at the bottom of the box.
  30. Run the white wire from the LVI behind the large red wire connected to the circuit breaker.
  31. Unscrew furthermost right screw on the clear casing over terminal strip. Unscrew sixth screw from the left on the bottom half of the terminal.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - bottom half
  32. Run the white wire to the sixth screw on the bottom half of the terminal. Re-place screw; tighten.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - place screw
  33. Screw terminal case back into place.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - Screw terminal
  34. Re-install relay.
  35. Re-install left valve bracket assembly.
  36. Re-attach wires to left valve bracket assembly.
  37. Locate wire harness with the thermal probe from the Delta-Q charger.NATIONAL FLOORING EQUIPMENT 5700 Ride on Scraper - harness
  38. Run the thermal probe behind the hoses and harness, under the metal bar and wires, then over the second bar and up to the negative battery terminal with the black boot and zip ties.
  39. Cut zip ties on the battery boot.
  40. Unscrew bolt and place thermal probe.
  41. Re-place boot and new zip ties. Clip the extra length off the zip ties.
  42. Connect the charger blue connector to the blue connector from the machine.
  43. Lift hood and then lower over machine; connect seat harness if applicable.
  44. Connect the (2) big blue connectors bolted on the front.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>