a-Tronix ECS2900 10kW Hybrid Inverter Instruction Manual
- June 16, 2024
- a-Tronix
Table of Contents
ECS2900 10kW Hybrid Inverter
Instruction Manual
LFP Battery System
Tools Required
The following tools will be required to install BS and CS.
Packing List
For BS
For BM
No. | Items |
---|---|
C | Mounting screw pack |
D | Fixing bracket |
E | Footstand |
F | Communication cable (BMS-inverter) |
G | Grounding cable |
H | DC output cable |
I | Installation guide & User manual |
J | Expansion tube2 &Expansion screw2 |
K | Waterproof cover |
L | RJ45 |
Terminals
For BS
For BM
Installation Steps
Step 1:
Install a BS with four footstand(Item E )and place it on the ground and adjust
it to the level.
After installing the footstand, use a track level bar to confirm the level.
Insert the waterproof cover (Item J) into the bottom of the battery and lock
it in place with the clip.
Step 2:
Place the battery 20mm against the wall.
Note:
Please make sure the Operating St-atus LED is on your left handside when you
facing the battery model.
Step 3:
Stack the batteries one by one. Step 4:
Place the two fixing brackets (Item D) close to the wall and install them on
both sides of the battery. Step 5:
Mark the wall through the bracket hole.
Step 6:
Punch after removing the BM. Drill holes with electric drill, make sure the
holes are at least 50mm deep, and then tighten the expansion tubes (Item J).
Step 7:
After stacking BM again, fix the battery on the wall. Schritt 8:
Fix the mounting screw packs on both sides of the battery, the installation is
over. Note: Please make sure each system including 1 BM and 1 BS.BS less than
6(1~6) pieces:
Wiring Steps
A: Connect the inverter and make sure the wiring position is correct, as shown
in the figure below.
Note : Inverter wiring refer to the inverter user manual.
For outdoor use,please use item L and proceed as follows
Connection steps:
Strp 1:Prepare a standard network cable and cable connector, then insert the
network cable through the cable connector.
Step 2: Crimp the cable with a Rj45 plug which is inside of the cable connector.
If the usage is indoor, please use item F
Step 3: Insert the cable connector into BMS port at the bottom of
inverter and screw it tightly.
B: Connect the grounding cable. The figure is shown in below.
System Start Up
- When the grid-connected system is put into operation, the inverter should be switched on first to prevent the current pulse of the inverter from rising to the battery pack.
- All installations and operation must comply with local electrical standards.
- Check all power cables and communication cables carefully.
- Turn on the POWER switch.
• Turn on DC switch and press the POWER switch, firstly Master LED will light up once, and then the BMS Status LED will light up for 0.5s,Operating Status LED will light up for 1s at the same time,it means that the system works normally.
10-203-00349-00
V1.0.1
Documents / Resources
|
a-Tronix ECS2900 10kW Hybrid
Inverter
[pdf] Instruction Manual