ethereal Power Relocation Outlet Relocation Kit Instruction Manual

June 16, 2024
Ethereal

POWER RELOCATION

Installation Instructions

KIT CONTENTS:

JAB SAW

IN-WALL POWER CABLE (9FT)
(ALREADY ATTACHED TO DUAL 110V IN-WALL UNIT

FISH TAPE (10FT)         SCREWS (4)

IN-WALL HOUSING      (2) FASCIA HOUSINGS

MALE CROWN                DUAL 110V IN-WALL UNIT

POWER CABLE (6FT)

TOOLS NEEDED:

PENCIL                 TAPE MEASURE

TAPE                     PHILLIPS SCREWDRIVER

LEVEL

(1) Check plug size from your TV

(2) Center between studs

(3) Measure and mark the location for holes with pencil

(4) Cut holes with provided Jab Saw

Square shape for the upper hole (see back shape of the Dual 110V In-Wall unit)

Circular shape for the lower hole (see back shape of the In-Wall Housing unit)

(5) Use Fish Tape to snake the Dual 110V In-Wall Unit Power Cable into the wall with the Male Tip at the bottom. Use tape to secure the Fish Tape if needed.

  1. MALE TIP
  2. FEMALE TIP (ALREADY ATTACHED TO THE Dual 110V IN-WALL UNIT)

NOTE: Snake any additional AV connection cables at this time. (Coax cable not included)

(6) At the bottom, insert Male Tip into the back side of the In-Wall Housing unit.

ethereal Power Relocation Outlet Relocation Kit B6

(7) Snap on Male Crown over the Plug Tip and secure with screws.

(8) Fold in Dog Ears and slide Housing into wall. Repeat at the bottom with the Male Housing.

 ethereal Power Relocation Outlet Relocation Kit B8

(9) Level and screw Dog Ears until Housing is secure. Repeat at the bottom with the Male Housing.

(10) Snap Housing Fascia onto the front of the Housing. Repeat at the bottom with the Male Housing.

(11) Plug Extension Cord into the bottom device. Installation is now complete.

WARNING:
Cancer and Reproductive Harm
www.P65Warnings.ca.gov.

www.EtherealPro.com | 386-255-0234
COPYRIGHT 2023 METRAAV 6/23

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals