ethereal Power Relocation Outlet Relocation Kit Instruction Manual
- June 16, 2024
- Ethereal
Table of Contents
POWER RELOCATION
Installation Instructions
KIT CONTENTS:
JAB SAW
IN-WALL POWER CABLE (9FT)
(ALREADY ATTACHED TO DUAL 110V IN-WALL UNIT
FISH TAPE (10FT) SCREWS (4)
IN-WALL HOUSING (2) FASCIA HOUSINGS
MALE CROWN DUAL 110V IN-WALL UNIT
POWER CABLE (6FT)
TOOLS NEEDED:
PENCIL TAPE MEASURE
TAPE PHILLIPS SCREWDRIVER
LEVEL
(1) Check plug size from your TV
(2) Center between studs
(3) Measure and mark the location for holes with pencil
(4) Cut holes with provided Jab Saw
Square shape for the upper hole (see back shape of the Dual 110V In-Wall unit)
Circular shape for the lower hole (see back shape of the In-Wall Housing unit)
(5) Use Fish Tape to snake the Dual 110V In-Wall Unit Power Cable into the wall with the Male Tip at the bottom. Use tape to secure the Fish Tape if needed.
- MALE TIP
- FEMALE TIP (ALREADY ATTACHED TO THE Dual 110V IN-WALL UNIT)
NOTE: Snake any additional AV connection cables at this time. (Coax cable not included)
(6) At the bottom, insert Male Tip into the back side of the In-Wall Housing unit.
(7) Snap on Male Crown over the Plug Tip and secure with screws.
(8) Fold in Dog Ears and slide Housing into wall. Repeat at the bottom with the Male Housing.
(9) Level and screw Dog Ears until Housing is secure. Repeat at the bottom with the Male Housing.
(10) Snap Housing Fascia onto the front of the Housing. Repeat at the bottom with the Male Housing.
(11) Plug Extension Cord into the bottom device. Installation is now complete.
WARNING:
Cancer and Reproductive Harm
www.P65Warnings.ca.gov.
www.EtherealPro.com |
386-255-0234
COPYRIGHT 2023 METRAAV 6/23