SUN GOLD POWER SPH8K48SP SUNGOLDPOWER 8000W DC 48V Pure Sine Wave Solar Inverter User Manual
- June 15, 2024
- SUN GOLD POWER
Table of Contents
USER MANUAL
All-in-one solar charge inverter
SPH8K48SP
SPH10K48SP
Safety
1.1、 How to use this manual
- This manual contains important information、guidelines、operation and maintenance for the following products:SPH series 8K48SP,10K48SP
- The manual must be followed during installation and maintenance.
1.2、Symbols in this manual
Symbol | Description |
---|---|
DANGER indicates a hazardous situations which if not avoided will result in |
death or serious injury.
| WARING indicates a hazardous situations which if not avoided could result in
death or serious injury.
| CAUTION indicates a hazardous situations which if not avoided could result
in minor or moderate injury.
| NOTICE provide some tips on operation of products.
1.3、Safety instructions
- This chapter contains important safety instructions. Read and keep this manual for future reference.
- Be sure to comply the local requirements and regulation to install this inverter.
- Beware of high voltage. Please turn off the switch of each power sources before and during the installation to avoid electric shock.
- For optimum operation of this inverter, please follow required specification to select appropriate cable size and necessary protective device.
- Do not connect or disconnect any connections when the inverter is working.
- Do not open the terminal cover when the inverter working.
- Make sure the inverter is well grounding.
- Never cause AC output and DC input short circuited.
- Do not disassembly this unit, for all repair and maintenance, please take it to the professional service center.
- Never charge a frozen battery.
- Please keep children away from touching or mishandling the inverter.
- Please make sure that this inverter is the only input power source for the load, do not use it in parallel with other input AC power sources to avoid damage.
Production Instructions
2.1、Instructions
SPH series is a new type of solar energy storage inverter control inverter
integrating solar energy storage & utility charging and energy storage, AC
sine wave output. It adopts DSP control and features high response speed,
reliability, and industrial standard through an advanced control algorithm.
2.2、Features
- Supports lead acid battery and li-ion battery connections.
- With a dual activation function when the li-ion battery is dormant; either mains/photovoltaic power supply access can trigger the activation of the li-ion battery.
- Support split-phase and single-phase pure sine wave output.
- Supports four different voltage levels of 100Vac, 105Vac, 110Vac, and 120Vac per phase.
- Supports two solar inputs and simultaneous tracking of two solar maximum power charging/carrying capacity functions.
- Dual MPPT with 99.9% efficiency and maximum 22A current in a single circuit, perfectly adapted to high power modules.
- 4 charging modes are available: solar only, mains priority, solar priority, and mixed mains/PV charging.
- With the time-slot charging and discharging setting function, you can set the time period for cutting in/out of mains charging and switch the time period between battery discharging and mains bypass power supply mode.
- Energy saving mode function to reduce no-load energy losses.
- With two output modes of utility bypass and inverter output, with uninterrupted power supply function.
- LCD large screen dynamic flow diagram design, easy to understand the system data and operation status.
- 360° protection with complete short circuit protection, over current protection, over under voltage protection, overload protection, backfill protection, etc.
- Support CAN, USB, and RS485 communication.
2.3、System connection diagram
The diagram below shows the system application scenario of this product. A
complete system consists of the following components:
- PV modules: converts light energy into DC energy, which can be used to charge the battery via an inverter or directly inverted into AC power to supply the load.
- Utility grid or generator: connected to the AC input, it can supply the load and charge the battery at the same time. The system can also operate generally without the mains or generator when the battery and the PV module power the load.
- Battery: The role of the battery is to ensure the regular power supply of the system load when the solar energy is insufficient and there is no mains power。
- Home load: Various household and office loads can be connected, including refrigerators, lamps, televisions, fans, air conditioners, and other AC loads.
- Inverter: The energy conversion device of the whole system.
The actual application scenario determines the specific system wiring method.
2.4、Production Overview
1 | LCD screen | 2 | LED Indicators | 3 | Touchable key |
---|---|---|---|---|---|
4 | ON/OFF Rocker Switch | 5 | PV INPUT (1/1) | 6 | BAT INPUT (+) |
7 | BAT INPUT (-) | 8 | Dry contact | 9 | RS485/CAN port |
10 | WIFI port | 11 | USB-B port | 12 | Grounding Screw |
13 | AC OUT (L+L+N) | 14 | AC IN (L+L+N) | 15 | AC INPUT breaker |
Installation
3.1、Select the mount location
SPH series are designed for INDOOR USE ONLY (IP20) . Please consider the
followings before selecting the location:
- Choose the solid wall to install the inverter.
- Mount the inverter at eye level.
- Adequate heat dissipation space must be provided for the inverter.
- The ambient temperature should be between -10~55℃ (14~131℉) to ensure optimal operation.
-
Do not install the inverter where highly flammable materials are near by.
-
Do not install the inverter in potential explosive areas.
-
Do not install the inverter with lead-acid batteries in a confined space.
-
Do not install the inverter in direct sunlight.
-
Do not install or use the inverter in a humid environment.
3.2、Mount the inverter
Make 4 mounting holes in the wall with an electric drill according to the
specified dimensions, insert 2 expansion screws above and fix the inverter
with 2 M5 screws below.
3.3、Remove the terminal cover & anti insect net
Using a screwdriver, remove the terminal protection cover and anti insect net.
- When using the device in areas with poor air quality, the dust screen is easily blocked by airborne particles. Please dismantle and clean the dust screen regularly to avoid affecting the internal air flow rate of the inverter, which may trigger an over-temperature protection fault (19/20 fault) affecting the use of the power supply and the service life of the inverter.
Connection
4.1、Connection Overview
- Split-phase mode(default)
Items | Description |
---|---|
Applicable Model | SPH series |
Output Voltage Range (L-N) | 100~120Vac, 120Vac default |
Output Voltage Range (L-L) | 200~240Vac,240Vac default |
- Single-phase mode
Items | Description |
---|---|
Applicable Model | SPH series |
Output Voltage Range (L-N) | 100~120Vac, 120Vac default |
- Users can change the output phase mode and output voltage by setup menu. Please read the chapter 5.2 Setting.
- Output phase mode corresponds parameter 39 , when option is 180 indicates split-phase, when option is 0 indicates single-phase.
- Output voltage corresponds parameter 38 , the output voltage can be set from 100V to 120V.
Split-phase Mode
Notice:
The open circuit voltage of PV panel in series connection must below 500V ,
Over-voltage will cause damage to the inverter. Damage caused by improper
conffguration is not covered by warranty.
Single-phase Mode
Notice:
The open circuit voltage of PV panel in series connection must below 500V ,
Over-voltage will cause damage to the inverter. Damage caused by improper
conffguration is not covered by warranty.
4.2、Cable & circuit breaker requirement
- PV INPUT
Model| Cable Diameter| Max.PV Input Current| Circuit Breaker
Spec
---|---|---|---
SPH8K48SP| 5mm²/ 10 AWG| 22A| 2P-25A
SPH10K48SP| 5mm²/ 10 AWG| 22A| 2P-25A
- AC INPUT
Model| Output Mode| Diagram| Maxinput Current| Cable
diameter| Circuit Breaker Spec
---|---|---|---|---|---
SPH8K-18SP| Split-phase| | 63A(L1/L2/N)| 13mm2/6AWG a l \L2\N)| 3P-63A
Single-phase| | 63A(L1/L2)
126A(N)| 13mm2/6AWG(L1/L2)
26mm2/3AWG(N)| 2P-125A
SPH10K48SP| Split-phase| | 63A(L1/L2/N)| 13mm2/6AWG a l \L2\N)| 3P-63A
Single-phase| | 63A(L1/L2)
126A(N)| 13mm2/6AWG(L1/L2)
26mm2/3AWG(N)| 2P-125A
- BATTERY
Model| Cable Diameter| Max.Battery Current| Circuit Breaker
Spec
---|---|---|---
SPH8K48SP| 34mm²/ 2 AWG| 180A| 2P-200A
SPH10K48SP| 42mm²/ 1 AWG| 220A| 2P-250A
- AC OUTPUT
Model| Output Mode| Diagram| Max.Output Current| Cable
diameter| Circuit Breaker Spec
---|---|---|---|---|---
SPH8K48SP| Split-phase| | 42A (L1/L2/N)| 13mm2/6AWG (L1 \LaN)| 3P-63A
Single-phase| | 42A (L1/L2) 84A(N)| 13mm2/6AWG(L1\ L2)
26mm2/3AWG(N)| 2P-125A
SPH10K48SP| Split-phase| | 63A (L1/L2/N)| 13mm2/6AWG(L1\ L2\N)| 3P-63A
Single-phase| | 63A (L1/L2) 126A(N)| 13mm2/6AWG (L1 \ L2)
26mm2/3AWG(N)| 2P-125A
• PV INPUT、AC INPUT、AC OUTPUT
1. Use a stripper to remove the 6~8mm insulation of the cable.
2. Fixing a ferrule at the end of the cable. (ferrule needs to be prepared by
the user)|
---|---
• BATTERY
1. Use a stripper to remove the 6~8mm insulation of the cable
2. Fixing cable lugs that supply with the box at the end of the cable.|
The wire diameter is for reference only. If the distance between the PV array and the inverter or between the inverter and the battery is long, using a thicker wire will reduce the voltage drop and improve the performance of the system.
4.3、AC input & output connection
Connect the live,neutral and ground wires according to the cables’ position
and order shown in the diagram below.
- Before connecting AC inputs and outputs, the circuit breaker must be opened to avoid the risk of electric shock and must not be operated with electricity.
- Please check that the cable used is sufficient for the requirements, too thin, poor quality cables are a serious safety hazard.
4.4、Battery Connection
Connect the positive and negative cable of the battery according to the
diagram below.
- Before connecting battery, the circuit breaker must be opened to avoid the risk of electric shock and must not be operated with electricity.
- Make sure that the positive and negative terminals of the battery are connected correctly and not reversed, otherwise the inverter may be damaged.
- Please check that the cable used is sufficient for the requirements, too thin, poor quality cables are a serious safety hazard.
4.5、PV connection
Connect the positive and negative wires of the two strings of PV according to
the diagram below.
- Before connecting PV, the circuit breaker must be opened to avoid the risk of electric shock and must not be operated with electricity.
- Please make sure that the open circuit voltage of the PV modules in series does not exceed the Max.OpenCircuitVoltage of the inverter (In the SPH series, this value is 500V), otherwise the inverter may be damaged.
4.6、Dry contact connection
Use a small screwdriver to push back the direction indicated by the arrow,
then insert the communication cable into the dry junction port. (Communication
cable diameter 0.2~1.5mm²)
4.7、Grounding connection
Please make sure the grounding terminal connect to the Grounding Bar.
- The grounding cable should have a diameter of not less than 4 mm² and be as close as possible to the grounding point.
4.8、Final assembly
After ensuring that the wiring is reliable and the wire sequence is correct,
install the terminal protection cover in place.
4.9、Start up the inverter
- Step 1 : Close the circuit breaker of the battery.
- Step 2:Press the rocker switch on the bottom of inverter, the screen and indicators light up to indicate that the inverter has been activated.
- Step 3:Sequential close of the circuit breakers for PV, AC input and AC output.
- Step 4:Start the loads one by one in order of power from small to large.
Operation
5.1、Operation and display panel
The operation and display panel below includes 1 LCD screen, 3 indicators, 4
touchable keys.
- Touchable Keys
Touchable Keys | Description |
---|---|
To enter/exit the setting menu | |
**** | To next selection |
**** | To last selection |
**** | To confirm/enter the selection in setting menu |
- LED Indicators
Indicators | Color | Description |
---|---|---|
FAULT | Red | Flash: error occur |
CHARGE | Green | Continued: charging complete |
Flash: charging
AC/INV| Yellow| Continued: utility grid by-pass output
Flash: inverter output
- Display panel
Icon | Description | Icon | Description |
---|---|---|---|
Indicates the PV panel | Indicates the utility grid | ||
**** | Indicates the battery | **** | Indicates the generator |
**** | Indicates the inverter is workin | **** | Indicates the home load |
**** | Indicates the inverter is communicating with data collector | **** |
Indicates the buzzer muted
| Indicates the direction of energy flow
| Indicates the inverter is standby| | Indicates the inverter is
working normally
| Indicates error occur| **| Indicates setting
Icon| Description| Icon| Description
---|---|---|---
**| Indicates load power 80%~100%| | Indicates battery SOC 80%~100%
| Indicates load power 60%~79%| | Indicates battery SOC 60%~79%
| Indicates load power 40%~59%| | Indicates battery SOC 40%~59%
| Indicates load power 20%~39%| | Indicates battery SOC 20%~39%
| Indicates load power 5%~19%| | Indicates battery SOC 5%~19%
| Indicates battery under- voltage| | Battery over discharge
| Indicates over-load| | Indicates BMS fault
| Indicates system communication erro| | Indicates system under-voltage
| Indicates system over-voltage| | Indicates system undertemperature
| Indicates system overtemperatur| | Indicates system over-current
| Indicates battery is full| | Indicates user defined battery
| Indicates sealed lead-acid battery| | Indicates flooded lead-acid
battery
| Indicates gel lead-acid battery| | Indicates ternary li-ion battery
| Indicates LFP li-ion battery| ECO| Indicates energy-saving mode
PV LOAD| Indicates PV energy is carrying the load| PV CHG|
Indicates PV energy is charging the battery
AC CHG| Indicates AC IN energy is charging the battery| MAIN
FIRST| Indicates the inverter output mode is mains power first
BYPASS| Indicates the inverter output mode is bypass| SOLAR
FIRST| Indicates the inverter output mode is solar first
BATT FIRST| Indicates the inverter output mode is battery first| |
- View real-time data
In the main screen,press the UP / DOWN keys to view the real-time data of the inverter during operation.
Page| PV side| BAT side| AC IN side| LOAD side|
General
---|---|---|---|---|---
1| PV voltage| Batt Voltage| AC in voltage| Single phase voltage| Current Time
2| PV current| Batt Current| AC in current| Single phase Current| Current Date
3| PV power| Batt Voltage| Total AC charging power| Single phase active power|
PV Total kWh
4| PV today kWh| Batt Current| Today AC charging kWh| Single phase apparent
power| Load Total kWh
5| PV side heat sink temperature| INV Heat Sink Temperature| AC frequency| AC
output frequency| RS485 Address
6| PV rated voltage| Batt Rated Voltage| Busbar voltage| AC output rated
power| Soft Version
7| Max. PV charging current| Max.Batt charging current| Max. AC charging
Current| Total AC output active power| /
8| | | /| Total AC output apparent power| /
5.2、Setting
ID | Parameter Meaning | Options | Description |
---|---|---|---|
00 | Exit | ESC | Exit the setup menu. |
01 | AC output source priority | UTI default | Utility at first priority, |
utility and solar provide power to load at the same time when solar is
available, battery will provide power to load only when utility power is not
available.
SbU| Solar power and battery at first priority,Utility will provide power to
load when solar power is not available and the battery voltage below parameter
[04] value.
SOL| Solar power at first priority, Utility will provide power to load when
solar power is not available and the battery voltage below parameter [04]
value .
02| AC output frequency| 50.0| AC output frequency will adaptive utility
frequency in bypass mode.Otherwise the output will follow the preset value.
60.0 default
ID| Parameter Meaning| Options| Description
---|---|---|---
03| AC input voltage range| UPS default| When output range is 120/110V,
input voltage range 90~140V
APL| When output range is 100/105V, input voltage range 85~140V
04| Voltage point of battery switch to utility| 43.6 default| When
parameter1= SBU=SOL, output source will switch to utility from battery when
the battery voltage below the preset value. Setting range:40~60V
05
| Voltage point of utility switch to battery| ****
56.8 default
| When parameter 1=SBU/SOL, output source will switch to battery from utility
when the battery voltage above the preset value. Range:40~60V
06| Battery charging mode| SNU default| Solar and utility charging the
battery at the same time, solar at the first priority, utility power as a
supplement when solar power is not sufficient.Notice: Solar and utility
charging the battery at the same time only in bypass mode, only solar charging
can be used when the invert circuit is in operation
CUb| Utility is the first priority in charging, Solar charging the battery
only when utility is not available.
CSO| Solar is the first priority in charging, Utility charging the battery
only when solar is not available
OSO| Only solar charging the battery.
07| Battery charging current| 60 default| SPH8K48SP current setting
range:0~180A.
SPH10K48SP current setting range:0~200A.
08| Battery type| USER| User-defined, user can set all battery parameter.
SLd| Sealed lead-acid battery.
FLd| Flooded lead-acid battery.
GEL default| Gel lead-acid battery.
L14/ L15/ L16| LFP li-ion battery, L14\L15\L16 corresponds battery cells
number in series.
N13/ N14| Ternary li-ion battery.
09| Battery bulk charging voltage| 57.6 default| Setting range:48V~58.4V,
increment of each click is 0.4V, parameter can be set only when battery type
is USER and L14/15/16,N13/14
10| Battery bulk charging delay time| 120 default| Indicates the duration
when battery voltage reached parameter 09 value in bulk charging
procession,Setting range: 5min~900min, increment of each click is 5min,
parameter can be set only when battery type is USER and L14/15/16,N13/14
ID| Parameter Meaning| Options| Description
---|---|---|---
11| Battery float charging voltage| 55.2 default| Setting range:
48V~58.4V, parameters cannot be set only after successful BMS communication.
12| Battery overdischarge voltage (delay off| 42 default| When the
battery voltage falls below this voltage point and parameter 13 value is
reached, the inverter output will be switched off.Setting range: 40V~48V,
increment of each click is 0.4V, parameter can be set only when battery type
is USER and L14/15/16,N13/14
13| Battery overdischarge voltage delay time| 5 default| Indicates the
duration when battery voltage reached parameter 12 value in over-voltage
procession.
Setting range: 5s~50s, increment of each click is 5s, parameter can be set only when battery type is USER and LFP14/15/16,NCM13/14
14| Battery undervoltage alarm| 44 default| When the battery voltage
falls below this voltage point, alarm will be displayed on the screen and
indicator. Setting range: 40V~52V, increment of each click is 0.4V, parameter
can be set only when battery type is USER and L14/15/16,N13/14
15| Battery undervoltage limit voltag| 40 default| When the battery
voltage falls below this voltage point, the inverter output is switched off
immediately. Setting range is 40V~52V, increment of each click is 0.4V,
parameter can be set only when battery type is USER and L14/15/16,N13/14
16| Battery equalization charging| dIS| Disable equalization charging.
ENA default| Enable equalization charging, parameter can be set only when
battery type is FLd\SLd\USER
17| Battery equalization charging voltage| 58| Setting range: 48V~58V,
increment of each click is 0.4V, parameter can be set only whenbattery type is
FLd\SLd\USER
18| Battery equalization charging duration| 120| Setting range: 5min~900min,
increment of each click is 5min, parameter can be set only when battery type
is FLd\SLd\USER
19| Battery equalization charging delay time| 120| Setting range: 5min~900min,
increment of each click is 5min, parameter can be set only when battery type
is FLd\SLd\USER
20| Battery equalization charging interval| 30| Setting range: 0~30 days,
increment of each click is 1 day, parameter can be set only when battery type
is FLd\SLd\USER
21| Battery equalization charging stop-start| dIS default| Stop
equalization charging immediately.
ENA| Start equalization charging immediately
22| Power saving mode| dIS default| Disable power saving mode
ENA| Enable power saving mode, When the load power below50W, the inverter
output will switch off after a 5min delay . When the load is more than 50W,
the inverter automatic restart
ID| Parameter Meaning| Options| Description
---|---|---|---
23| Over-load restart| dIS| When overload occurs and the output is switched
off,the machine will not restart.
ENA default| When overload occurs and the output is switched off,the
machine will restart after a delay of 3 minutes. After it reaches 5 cumulative
time, the
machine will not restart automatically.
24| Over-temperature restart| dIS| When over temperature occurs and the output
is switched off,the machine will not restart.
ENA default| When overload occurs and the output is switched off,the
machine will restart when the temperature drops.
25| Buzzer alarm| dIS| Disable buzzer alarm.
ENA default| Enable buzzer alarm.
26| Power source switching reminder| dIS| Disable reminder when the status of
the input power source changes.
ENA default| Enable reminder when the status of the input power source
changes.
27| Inverter overload switch to bypass| dIS| Disable switch to the bypass when
the inverter is overload
ENA default| Enable switch to the bypass when the inverter is overload.
28| Max. utility charging current| 60 default| SPH8K48SP, setting range:
0~100A.
SPH10K48SP, setting range: 0~120A.
30| RS485 address| Id:1| RS485 address setting range: 1~254.
32| RS485 communication| SLA default| Enabling PC and remote monitoring
protocols
485| Enabling BMS communication based on RS485
CAN| Enabling BMS communication based on CAN
33| BMS communication| When item 32 is set to 485 or CAN, the corresponding
communication protocol must be selected in item 33
PAC=PACE,RDA=Ritar,AOG=ALLGRAND BATTERY,OLT=OLITER, HWD=SUNWODA, DAQ=DAKING,
WOW=SRNE, PYL=PYLONTECH UOL=WEILAN
34| Feed back & hybrid output function| dIS default| Disable this
function.
MIX LOD| When parameter 1=UTI ,the solar energy is prioritised to charge the
batteries and any excess energy will be used to power the load. With an anti-
backflow function, the PV energy is not feed back into the grid.
ON GRD| When parameter 1=UTI ,solar energy will feed back into the grid when
battery is full or disconnected.
35| Battery under voltage recover point| 52| Battery recover discharge from
under voltage protection when voltage above this value. Setting range:
44V~54V.
37| Battery full recharge voltage point| 52| Inverter stops charging when the
battery is full. Inverter resumes charging when the battery voltage below this
value. Setting range: 44V~54V.
ID| Parameter Meaning| Options| Description
---|---|---|---
38| AC output voltage| 120| Setting range: 100/105/110/120Vac
40| 1st slot start charging| 00:00:00| Setting range: 00:00:00-23:59:00
41| 1st slot end charging| 00:00:00| Setting range: 00:00:00-23:59:00
42| 2nd slot start charging| 00:00:00| Setting range: 00:00:00-23:59:00
43| 2nd slot end charging| 00:00:00| Setting range: 00:00:00-23:59:00
44| 3rd slot start charging| 00:00:00| Setting range: 00:00:00-23:59:00
45| 3rd slot end charging| 00:00:00| Setting range: 00:00:00-23:59:00
46| Time slot charging function| dIS default| Disable this function
ENA| Enable this function, AC output source mode will switch to SBU, utility
charging the battery and carry load only in charging time slot which user set
or the battery is under voltage.
47| 1st slot start discharging| 00:00:00| Setting range: 00:00:00-23:59:00
48| 1st slot end discharging| 00:00:00| Setting range: 00:00:00-23:59:00
49| 2nd slot start discharging| 00:00:00| Setting range: 00:00:00-23:59:00
50| 2nd slot end discharging| 00:00:00| Setting range: 00:00:00-23:59:00
51| 3rd slot start discharging| 00:00:00| Setting range: 00:00:00-23:59:00
52| 3rd slot end discharging| 00:00:00| Setting range: 00:00:00-23:59:00
53| Time slot discharging function| dIS default| Disable this function.
ENA| Enable this function, AC output source mode will switch to UTI , battery
discharging only in discharging time slot which user set or utility is not
available.
54| Local date| 00:00:00| YY/MM/DD.Setting range: 00:01:01-99:12:31
55| Local time| 00:00:00| Setting range: 00:00:00-23:59:59
57| Stop charging current| 2| Charging stops when the charging current is less
than the set value (unit:amp)
ID| Parameter Meaning| Options| Description
---|---|---|---
58| Discharging alarm SOC| 15| Triggers an alarm when the battery SOC is less
than the set value (unit:%)
59| Discharging cutoff SOC| 5| Stops discharging when the battery SOC is less
than the set value (unit:%)
60| Charging cutoff SOC| 100| Stops charging when the battery SOC is touch the
set value (unit:%)
61| Switching to utility SOC| 10| Switch to utility power when the battery SOC
is less than this setting (unit:%)
62| Swithing to inverter SOC| 100| Switches to inverter output mode when SOC
is greater than this setting (unit:%)
63| N-PE bonding automatic switching function| dIS default| Allow
automatic switching of N-PE bonding
ENA| Prohibit automatic switching of N-PE bondin
68| AC output phase mode| 0| 0 stands for single-phase mode. Assume parameter
38=120V.The phase difference of L1-L2 is 0 degree, L1/L2 in parallel
connection, therefore L1-N/L2-N voltage is 120V.Setting allowed only when
output is switched off.
180 default| 180 stands for split-phase mode. Assume parameter 38=120V,
The phase difference of L1-L2 is 180 degree, therefore L1-N/L2-N voltage is
120V, L1-L2 voltage is 120*2=240V.Setting allowed only when output is switched
off.
5.3、AC output mode
The AC output mode corresponds to parameter setting item 01 and 34, which
allows the user to set the AC output power source manually.
- Utility Priority Output 01 UTI (default)
Utility at first priority, utility and solar provide power to load at the same time when solar is available, battery will provide power to load only when utility power is not available.(Priority: utility>solar>battery)
• Solar and Utility Hybrid Outpu 34 MIX LOD
In UTI mode, when not connected to the battery or when the battery is full,
the solar and the utility supply power to the load at the same time.(Priority:
solar>utility>battery)
• Solar Priority Output 01 SOL
Solar provides power to the loads as first priority.If solar is not sufficient
or not available, the utility will be used as a supplement to provide power to
the loads. This mode maximises solar energy while maintaining battery power
and is suitable for areas with relatively stable power grids.(Priority:
solar>utility>battery)
• Inverter Priority Output 01 SbU
Solar provides power to the loads as first priority.If solar is not sufficient
or not available, the battery will be used as a supplement to provide power to
the loads. When the battery voltage reaches the value of parameter 04 (Voltage
point of battery switch to utility ) will switch to utility to provide power
to the load, This model makes maximum use of DC energy and is used in areas
where the grid is stable. (Priority: solar>battery>utility)
5.4、Battery charging mode
The charging mode corresponds to parameter setting item 06, which allows the
user to set the charging mode manually.
• Hybrid Charging SNU (default)
Solar and utility charging the battery at the same time, solar at the first
priority, utility power as a supplement when solar power is not sufficient.
This is the fastest way to charge and is suitable for areas with low power
supply, providing customers with sufficient back-up power.(Source priority:
solar>utility)
• Utility Priority Chargin CUb
The utility power gives priority to charging the battery, and PV charging is
only activated when the utility power is not available.(Source priority:
utility>solar)
• Solar Priority Charging CSO
Solar priority charging, with utility charging only activated when the solar
fails. By making full use of solar power during the day and switching to
utility charging at night, battery power can be maintained and is suitable for
applications in areas where the grid is relatively stable and electricity
prices are more expensive.(Source priority: solar>utility)
• Only Solar Chargin OSO
Solar charging only, no mains charging is activated. This is the most energy-
efficient method, with all the battery power coming from solar energy, and is
usually used in areas with good radiation conditions.
5.5、Time-slot charging/discharging function
The SPH series is equipped with a time-slot charging and discharging function,
which allows users to set different charging and discharging periods according
to the local peak and valley tariffs, so that the utility power and PV energy
can be used rationally.
When mains electricity is expensive, the battery inverter is used to carry the
load; when the mains electricity is cheap, the mains electricity is used to
carry the load and charge, which can help customers to save electricity costs
to the greatest extent.
The user can turn on/off the time-slot charging/discharging function in setup
menu parameter 46 and 53.and set charging and discharging slot in parameter
40-45, 47-52. Below are examples for users to understand the function.
Before using this function for the ffrst time, please set the local time in parameter items 54, 55, then the user can set the corresponding time slot according to the local peak and valley tariff charges.
With 3 definable periods, the user can freely set the mains charging/carrying
time within the range of 00:00 to 23:59. During the time period set by the
user, if PV energy is available, PV energy will be used first, and if PV
energy is not available or insufficient, utility energy will be used as a
supplement.
With 3 definable time periods, users can freely set the battery discharge time
within the range of 00:00 to 23:59. During the time period set by the user,
the inverter will give priority to the battery inverter to carry the load, and
if the battery power is insufficient, the inverter will automatically switch
to mains power to ensure stable operation of the load.
5.6、 Battery parameter
• Lead-acid battery
Parameter/Battery type| Sealed| Gel| Flooded| User-
defined
---|---|---|---|---
SLd| GEL| FLd| USE
Over-voltage cut-off voltage| 60V| 60V| 60V| 60V
Equalization charging voltage| 58V| 56.8V| 58V| 40~60V settable
Bulk charging voltage| 57.7V| 56.8V| 57.6V| 40~60V settable
Float charging voltage| 55.2V| 55.2V| 55.2V| 40~60V settable
Under-voltage alarm voltage| 44V| 44V| 44V| 40~60V settable
Under-voltage cut-off voltage| 42V| 42V| 42V| 40~60V settable
Discharging limit voltage| 40V| 40V| 40V| 40~60V settable
Over-discharge delay time| 5s| 5s| 5s| 1~30s settable
Equalization charging duration| 120m| –| 120min| 0~600min settable
Equalization charging interval| 30d| –| 30d| 0~250d settable
Bulk charging duration| 120m| 120m| 120m| 10~600m settable
• Li-ion batter
Parameter/Battery type | Ternary | LFP | Userdefined |
---|---|---|---|
N13 | N14 | L16 | L15 |
Over-voltage cut-off voltage | 60V | 60V | 60V |
Equalization charging voltage | – | – | – |
Bulk charging voltage | 53.2V | 57.6V | 56.8V |
Float charging voltage | 53.2V | 57.6V | 56.8V |
Under-voltage alarm voltage | 43.6V | 46.8V | 49.6V |
settable
Under-voltage cut-off voltage| 38.8V| 42V| 48.8V| 45.6V| 42V| 40~60V settable
Discharging limit voltage| 36.4V| 39.2V| 46.4V| 43.6V| 40.8V| 40~60V settable
Over-discharge delay time| 30s| 30s| 30s| 30s| 30s| 1~30s settable
Equalization charging duration| –| –| –| –| –| 0~600min settable
Equalization charging interval| –| –| –| –| –| 0~250d settable
Bulk charging duration| 120min settable| 120min settable| 120min settable| 120
m settable| 120 m settable| 10~600min settable
Communication
6.1、Overview
- USB-B port
- WIFI port
- RS485/CAN port
- Dry contact port
6.2、USB-B port
The user can read and modify device parameters through this port by using the host software. Please contact us for the host software installation package if you require one
6.3、WIFI port
The WIFI port is used to connect to the Wi-Fi/GPRS data acquisition module,
which allows the user to view the operating status and parameters of the
inverter via the mobile phone APP.
RJ45 | Definition |
---|---|
Pin 1 | 5V |
Pin 2 | GND |
Pin 3 | / |
Pin 4 | / |
Pin 5 | / |
Pin 6 | / |
Pin 7 | RS485-A |
Pin 8 | RS485-B |
The Wi-Fi/GPRS data acquisition module need to be purchased separately. User can scan the QR code to download the mobile APP.
https://apps.apple.com/cn/app/id1334656760
https://play.google.com/store/apps/details?id=com.eybond.smartclient.ess
6.4、RS485/CAN port
The RS485/CAN port is used to connect to the BMS of Liion battery.
RJ45 | 定义 |
---|---|
Pin 1 | 5V |
Pin 2 | GND |
Pin 3 | / |
Pin 4 | CANH |
Pin 5 | CANL |
Pin 6 | / |
Pin 7 | RS485-A |
Pin 8 | RS485-B |
If you need the inverter to communicate with the lithium battery BMS, please
contact us for the communication protocol or to upgrade the inverter to the
corresponding software program.
If you use a normal RJ45 network cable, please check the pin assignment, pin 1
& pin 2 usually need to be cut off for normal use.
6.5、Dry contact
Dry contact port with 4 functions:
- Remote switch on/off ;
- Switching signal output;
- Battery temperature sampling
- Generator remote start/ stop
Function | Description |
---|---|
Remote switch on/off | When pin 1 is connected with pin 2, the inverter will |
switched off the AC output. When pin1 is disconnected from pin2, the inverter
outputs normally.
Switching signal output| When the voltage of battery reaches the under-
voltagelimitvoltage parameter 15)pin 3 to pin 1 voltage is 0V, When the
battery charging/discharging normally pin 3 to pin 1 voltage is 5V.
Temperature sampling (reserved)| Pin 1 & Pin 4 can be used for battery
temperature sampling compensation.
Generator remote start/stop| When the voltage of battery reaches the under-
voltagealarmvoltage (parameter 14) orvoltagepointofutilityswitchtobattery
(parameter 04), pin 6 to pin 5 normal open, pin 7 to pin 5 normal close.
When the voltage of battery reaches the voltagepointofbatteryswitchtoutility
(parameter 05) or battery is full. pin 6 to pin 5 normal close, pin 7 to pin 5
normal open. (Pin 5/6/7 outputs 125Vac/1A, 230Vac/1A,30Vdc/1A)
If you need to use the remote start/stop function of the generator with dry contact, ensure that the generator has ATS and supports remote start/stop.
FaultandRemedy
7.1、Fault code
Fault Code| Meaning| Does it Affect the outputs|
Instructions
---|---|---|---
01| BatVoltLow| Yes| Battery under-voltage alarm
02| BatOverCurrSw| Yes| Battery discharge over-current, software protection
03| BatOpen| Yes| Battery disconnected alarm
04| BatLowEod| Yes| Battery under-voltage stop discharging alarm
05| BatOverCurrHw| Yes| Battery over-current hardware protection
06| BatOverVolt| Yes| Battery over-voltage protection
07| BusOverVoltHw| Yes| Busbar over-voltage hardware protection
08| BusOverVoltSw| Yes| Busbar over-voltage software protection
09| PvVoltHigh| Yes| PV input over-voltage protection
10| PvBoostOCSw| NO| Boost circuit over-current software protection
11| PvBoostOCHw| NO| Boost circuit over-current hardware protection
12| SpiCommErr| Yes| Master-slave chip SPI communication failure
13| OverloadBypass| Yes| Bypass overload protection
14| OverloadInverter| Yes| Inverter overload protection
15| AcOverCurrHw| Yes| Inverter over-current hardware protection
16| AuxDSpReqOffPWM| Yes| Slave chip request switch off failure
17| InvShort| Yes| Inverter short-circuit protection
18| Bussoftfailed| Yes| Busbar soft start failure
19| OverTemperMppt| NO| MPPT heat sink over-temperature protection
20| OverTemperInv| Yes| Inverter heat sink over-temperature protection
21| FanFail| Yes| Fan failure
22| EEPROM| Yes| Reservoir failure
Fault Code| Meaning| Does it Affect the outputs|
Instructions
---|---|---|---
23| ModelNumErr| Yes| Wrong model
24| Busdiff| Yes| Busbar voltage imbalance
25| BusShort| Yes| Busbar short circuit
26| Rlyshort| Yes| Inverter output back flow to bypass
28| LinePhaseErr| Yes| Utility input phase fault
29| BusVoltLow| Yes| Busbar under-voltage protection
30| BatCapacityLow1| Yes| Battery SOC below 10% alarm (Only enable BMS take
effect)
31| BatCapacityLow2| NO| Battery SOC below 5% alarm (Only enable BMS take
effect)
32| BatCapacityLowStop| Yes| Battery dead (Only enable BMS take effect)
58| BMSComErr| NO| BMS communication failure
60| BMSUnderTem| NO| BMS under-temperature alarm (Only enable BMS take effect)
61| BMSOverTem| NO| BMS over-temperature alarm (Only enable BMS take effect)
62| BMSOverCur| NO| BMS over-current alarm (Only enable BMS take effect)
63| BMSUnderVolt| NO| BMS under-voltage alarm (Only enable BMS take effect)
7.2、Troubleshooting
Fault Code | Meaning | Causality | Remedy |
---|---|---|---|
/ | Screen no display | No power input, or in sleep mode. | Closing the circuit |
breaker. Ensure the rocker switch is ON. Push any button on the panel to exit
sleep mode.
01| Battery under-voltage| The battery voltage is lower than the value set in
parameter [14].| Charge the battery and wait until the battery voltage is
higher than the value set in the parameter item [14].
03| Battery not connected| The battery is not connected, or the BMS in
discharge protection| Check whether the battery is reliably connected; check
whether the circuit breaker of the battery is not closed; ensure that the BMS
of the Li-ion battery can communicate properly.
Fault Code| Meaning| Causality| Remedy
---|---|---|---
04| Battery over-discharge| The battery voltage is lower than the value set in
the parameter [12].| Manual reset: Power off and restart. Automatic reset:
charge the battery so that the battery voltage is higher than the value set in
the parameter item [35].
06| Battery over-voltage when charging| Battery is in over-voltage condition.|
Manually power off and restart. Check to see if the battery voltage exceeds
the limit. If it exceeds, the battery needs to be discharged until the voltage
is below the battery’s over-voltage recovery point.
13| Bypass over-load (software detection)| Bypass output power or output
current overload for a certain period of time.| Reduce the load power and
restart the device. Please refer to item 11 of the protection features for
more details.
14| Inverter overload(software detection)| Inverter output power or output
current overload for a certain period of time.
19| Heat sink of PV input over-temperature (software detection)| Heat sink of
PV input temperature exceeds 90℃ for 3s.| Resume normal charge and discharge
when the temperature of the heat sink has cooled to below the over-temperature
recovery temperature
20| Heat sink of inversion over-temperature (software detection)| Heat sink of
inversion temperature exceeds 90℃ for 3s.
21| Fan failure| Fan failure detects by hardware for 3s.| Manually toggle the
fan after switching off to check for blockage by foreign objects.
26| AC Input relay shortcircuit| Relay for AC input sticking| Manually power
off and restart; if the fault reappears after restarting,You need to contact
the after-sales service to repair the machine.
28| Utility input phase fault| AC input phase does not coincide with AC output
phase| Ensure that the phase of the AC input is the same as the phase of the
AC output, e.g. if the output is in split-phase mode, the input must also be
in split-phase.
If you encounter a fault with the product that cannot be solved by the methods in the table above, please contact our after-sales service for technical support and do not disassemble the equipment yourself.。
Protectionand Maintenance
8.1、Protection features
No | Protection Feature | Instruction |
---|---|---|
1 | PV input current/power limiting protection | When the charging current or |
power of the PV array configured exceeds the PV input rated value, the
inverter will limit the input power and charge at the rated.
2| PV input over-voltage| If the PV voltage exceeds the maximum value allowed
by the hardware, the machine will report a fault and stop the PV boost to
output a sinusoidal AC wave.
3| PV night reverse current protection| At night, the battery is prevented
from discharging through the PV module because the battery voltage is greater
than the voltage of PV module.
4| AC input over-voltage protection| When the AC input voltage of each phase
exceeds 140V, the mains charging will be stopped and switched to the inverter
mode.
5| AC input under-voltage protection| When the AC input voltage of each phase
below 90V, the utility charging will be stopped and switched to the inverter
mode.
6| Battery over-voltage protection| When the battery voltage reaches the over-
voltage cut-off point, the PV and the utility will automatically stop charging
to prevent the battery from being overcharged and damaged.
7| Battery under-voltage protection| When the battery voltage reaches the
under-voltage cut-off point, the inverter will automatically stop the battery
discharge to prevent damage from over-discharging the battery.
8| Battery over-current protection| After a period when the battery current
exceeds that allowed by the hardware, the machine will switch off the output
and stop discharging the battery.
9| AC output short-circuit protection| When a short-circuit fault occurs at
the load output terminal, the AC output is immediately turned off and turned
on after 1 second.If the output load terminal is still short-circuited after 3
attempts, the inverter must be manually restarted after first removing the
short- circuit fault from the load before the normal output can be restored.
10| Heat sink over- temperature protection| When the internal temperature of
the inverter is too high, the inverter will stop charging and discharging;
when the temperature returns to normal, the inverter will resume charging and
discharging.
11| Inverter over-load protection| After triggering the overload protection
the inverter will resume output after 3 minutes, 5 consecutive overloads will
switch off the output until the inverter is restarted.
(102%<load<110%) ±10%: error and output shutdown after 5min; (110% < load <
125%) ±10%: error and output shutdown after 10s. Load > 125% ±10%: error
reported and output switched off after 5s.
12| AC output reverse| Prevents AC back flow from the battery inverter to the
bypass AC input.
---|---|---
13| Bypass over-current protection| Built-in AC input over-current protection
circuit breaker.
14| Bypass phase inconsistency protection| When the phase of the bypass input
and the phase of the inverter split do not match, the inverter disables
switching to the bypass output to prevent the load from dropping out or
shortcircuiting when switching to the bypass.
8.2、Maintenance
To maintain optimum and long-lasting working performance, we recommend that
the following items are checked twice a year.
- Ensure that the airflow around the inverter is not blocked and remove any dirt or debris from the radiator.
- Check that all exposed conductors are not damaged by sunlight, friction with other surrounding objects, dry rot, insect or rodent damage, etc. The conductors need to be repaired or replaced if necessary.
- Verify that the indications and displays are consistent with the operation of the equipment, note any faults or incorrect displays and take corrective action if necessary.
- Check all terminals for signs of corrosion, insulation damage, high temperatures or burning/discolouration and tighten terminal screws.
- Check for dirt, nesting insects and corrosion, clean as required,Clean the insect screen regularly.
- If the lightning arrester has failed, replace the failed arrester in time to prevent lightning damage to the inverter or other equipment of the user.
- Make sure that the inverter is disconnected from all power sources and that the capacitors are fully discharged before carrying out any checks or operations to avoid the risk of electric shock.
The Company shall not be liable for damage caused by :
- Damage caused by improper use or use in a wrong location.
- Photovoltaic modules with an open circuit voltage exceeding the maximum permissible voltage.
- Damage caused by the operating temperature exceeding the restricted operating temperature range
- Dismantling and repair of the inverter by unauthorised persons.
- Damage caused by force majeure: damage during transport or handling of the inverter.
Datasheet
MODEL | SPH8K48SP | SPH10K48SP | CAN BE SET |
---|
INVERTER OUTPUT
Rated Output Power| 8,000W| 10,000W|
Max.Peak Power| 16,000W| 20,000W|
Rated Output Voltage| 120/240Vac(split phase/single phase)| Y
Load Capacity of Motors| 5HP| 6HP|
Rated AC Frequency| 50/60Hz| Y
Waveform| Pure Sine Wave|
Switch Time| 10ms(typical)|
Parallel capacity| /|
Overload| After triggering the overload protection the inverter will resume
output after 3 minutes, 5 consecutive overloads will switch off the output
until the inverter is restarted. (102%<load<110%) ±10%: error and output
shutdown after 5min; (110% < load < 125%) ±10%: error and output shutdown
after 10s. Load > 125% ±10%: error reported and output switched off after 5s.|
BATTERY
Battery Type| Li-ion / Lead-Acid / User Defined| Y
Rated Battery Voltage| 48Vdc|
Voltage Range| 40-60Vdc| Y
Max.MPPT Charging Current| 200A| Y
Max.Mains/Generator Charging Current| 100A| 120A| Y
Max.Hybrid Charging Current| 180A| 200A| Y
PV INPUT
Num. of MPP Trackers| 2|
Max.PV array power| 11,000W|
Max.input current| 22/22A|
Max.Voltage of Open Circuit| 500Vdc|
MPPT Voltage Range| 125-425Vdc|
MAINS / GENERATOR INPUT
Input Voltage Range| 90-140Vac|
Frequency Range| 50/60Hz|
Bypass Overload Current| 63A|
EFFICIENCY
MPPT Tracking Efficiency| 99.9%|
Max. Battery Inverter Efficiency| 92%|
GENERAL
Dimensions| 620445130mm(21.50.4ft)|
Weight| 24.5kg(59lb)|
Protection Degree| IP20,Indoor Only|
Operating Temperature Range| -10~55℃,>45℃ derated (14~131℉,>113℉ derated)|
Noise| <60dB|
Cooling Method| Internal Fan|
Warranty| 1 Years|
COMMUNICATION
Embedded Interfaces| RS485 / CAN / USB / Dry contact| Y
External Modules (Optional)| Wi-Fi / GPRS| Y
CERTIFICATION
Safety| IEC62109-1, IEC62109-2,UL1741|
EMC| EN61000-6-1, EN61000-6-3, FCC 15 class B|
RoHS| Yes|
All-in-one solar charge inverter V3.0
Sun Gold Power Inc
www.sungoldpower.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>