Requirements for the mounting position

Mark the load-bearing point

Mounting inverter

Electrical Connection
| Code | Name |
|---|---|
| A | DRMS Port |
| B | CT/Meter connection |
| C | RS232 communication |
| D | Grid connection |
| E | Backup connection |
| F | Ground |
| G | BMS switches |
| H | Battery switches |
| I | BAT+ |
| J | BMS LINK |
| K | BAT- |
Table 1: Interface definition description

Opening-closing current transformer (CT) installation

Meter installation

Initial setup
Step 1: Download escolar O&M APP.
a. For the iOS system, search “escolar O&M” in App Store to download.
b. For the Android system, search “escolar O&M” in Google Play to download.

Step 2: Open the software.
a. Enter your account and password.
b. Login.
Step 3: Enter the user center.
a. Tap the “MY” icon in the lower right corner of the main interface.
Step 4: Connect the devices.
a. Tap “Remote Configuration.”

Step 5: Select connection methods.
a. Choose one of the connection methods.
Step 6: Pair with the equipment
a. Select the correct model of the module to connect.
Step 7: Equipment selection
a. Tap “AS×××××” series device.

Step 8: Initial setup
a. Set local grid compliance and time as per the local regulations.
Step 9: Working modes selection
a. Tap the area marked by the black box to select the operational mode.

Step 10: Measuring device
a. Select one of the monitoring equipment to connect.
Step 11: Device information
a. View the device information on this interface and tap the icon marked with
the black box in the upper right corner.
Step 12: Complete the setup
a. Complete the parameter setting and enter the device configuration
interface.