SAFAVIEH LIGHTING FLU4055A Flush Mount Ceiling Lights Instruction Manual

June 13, 2024
SAFAVIEH LIGHTING

SAFAVIEH LIGHTING FLU4055A Flush Mount Ceiling Lights

SAFAVIEH LIGHTING FLU4055A Flush Mount Ceiling Lights

ITEM#:FLU4055A
Product Dimension:16’’x16’’x13.5’’

WARNING

  • WE RECOMMEND INSTALLATION OF THIS LIGHTING FIXTURE BE DONE BY A LICENSED ELECTRICIAN **
  • Switch off the main electrical supply from the main fuse box / circuit breaker before installation.
  • Inspect item carefully before attempting to install.
  • If there is any damages or obvious defects, do not install.
  • Item may not be returned once it has been installed.

CARE AND MAINTENANCE

  • To clean the outside of the fixture, use a dry or slightly dampened clean cloth (use clean water, never a solvent) to wipe the surface of the fixture.
  • To clean the inside of the fixture, first disconnect power to the fixture by turning off the circuit breaker or by removing the fuse at the fuse box. Next, use a dry or slightly dampened clean cloth (use clean water, never a solvent) to wipe the interior surface of the fixture.
  • Do not use any cleaners with chemical, solvents or harsh abrasives. Use only a dry soft cloth to dust or wipe carefully.

NOTICE& IMPORTANT SAFETY INSTRUCTIONS

  • Please make sure that you have all parts indicated before you begin assembly of this item
  • This item should be assembled on a soft surface to prevent scratching the finish during assembly
  • To reduce the risk of fire, electrical shock or injury to persons or property, please follow the guideline below for safe use and installation
  • The external flexible cable or cord of this lamp cannot be replaced
    If the cord is damaged, the lamp shall be destroyed

Part List and Hardware List

PIECE| DESCRIPTION| PICTURE| QUANTITY| PIECE| DESCRIPTION| PICTURE| QUANTITY
---|---|---|---|---|---|---|---
A| Mounting Plate| | 1 X| H| Threaded Stem with Nuts| | 1 X
B| Wire Nut| | 3 X| I| Plastic washer| | 2 X
C| Mounting Screw Size: 8 /3 2 * 3 0 mm| | 2 X| J| Diffuser| | 1 X
D| Canopy| | 1 X| K| Nut| | 1 X
E| Canopy Nut|
| 2 X| L| Metal Cover| | 1 X
F| Bulb|
| 3 X| M| Finial| | 1 X
G| Shade|
| 1 X| | | |

PREPARATION

  • Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents list.
  • If any part is missing or damaged, do not attempt to assemble the product.
  • Estimated Assembly Time:30 minutes
  • If you are having difficulty, our friendly Customer Care team is always here to help. Please email customersupport@safavieh.com

*NOTE: PLEASUE USE TYPE”B” BULB MAX 40-WATT OR CFL BULB MAX 13-WATT OR LED MAX 9-WATT,THERE ARE 3 LED 4W BULBS IN THE BOX.**

Step 1

Unpack all parts from cartons carefully. Separate the Mounting Plate(A) from the Canopy(D) by removing the Canopy Nut(E) anti-clockwise.

Preparation

Step 2:

Insert the fixture wires through the Canopy (D). Rotate the Canopy (D) clockwise till tight.

Preparation

Step 3:

Insert the J-box wires through the center opening of Mounting Plate (A).Attach the Mounting Plate (A) onto the J-box and secure it by turning the 2 Mounting Screws (C) clockwise until tight.

Preparation

Step 4:

Wire connection

Connect fixture neutral wire (ribbed) to the outlet box neutral wire (usually white) using a wire nut. Connect fixture hot wire (smooth with markings) to the outlet box hot wire (usually black) using a wire nut.

CAUTION: Do not reverse the hot and neutral connections

Grounding Instructions:

Wrap ground wire from outlet box around green ground screw(B) on mounting bracket, no less than 2″ from wire end. Tighten ground screw. If fixture is supplied with a ground wire, connect to outlet ground wire with a wire connector.

Preparation

Step 5:

Attach the Canopy(D) to the Mounting Plate (A) and fix it by turning the Canopy Nut (E) clockwise.

Preparation

Step 6:

Insert the Bulbs (F) into the Socket as diagram. Screw the Threaded Stem with Nuts (H) into the threaded portion of of the tube underneath the socket as diagram. Place the Plastic Washer (I) onto the Threaded Stem with Nuts (H). And place the Diffuser (J) then the Plastic Washer (I) into the Threaded Stem with Nuts (H) underneath the socket as diagram. Fix the Diffuser(J) in place by turning the Nut (K) clockwise till tight. Then finx the Metal Cover (L) in place by turning the Finial (M) clockwise till tight.

Preparation

Logo

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SAFAVIEH LIGHTING User Manuals

Related Manuals