BENNETT MARINE EIC5000 Electronic Indicator Control Kit Instruction Manual
- June 13, 2024
- Bennett Marine
Table of Contents
Electronic Indicator Control Kit (EIC5000)
Installation Instructions
For information on installing a complete Bennett Hydraulic Trim Tab System, please visit BennettTrimTabs.com/Installation
Before Installation
Before drilling any holes, read the entire instructions, and make sure the
battery power is disconnected.
Contents
- Upper hinges with 10 ft. sensor wire each
- 20 ft. EIC cable
- Relay module
- EIC helm control
- Hardware & white clip
- Port/Stbd. stickers
- Short sensor rods (2)
- Long sensor rods (2)
Special Requirements
-
Make sure to test the system before putting the boat back in the water.
-
The system is voltage specific. Please make sure you have a 12 or 24 volt EIC5000 depending on your requirements.
-
Special sensor coils are required if (See figure 1):
» Actuator stroke is more than 2 ½”
» Less than 1″ of piston shaft is exposed when the actuator is fully retracted. The system will not work when actuator stroke is 1” or less.
» Actuator has external hydraulic connection -
This kit contains sensor rods for the two most popular sizes of Bennett hydraulic actuators. Use the short rods if your actuators have three rings on the bottom of the cylinder. Use the long rods if your actuators have four rings on the bottom of the cylinder.
Required Tools and materials
- 7/16″& 1/2″ Wrench
- 1/8″, 3/16″, 5/16″& 3/4″ Drill bit
- 1″ Hole saw
- Teflon tape
- Wire stripper
- Electric drill
- 3M 5200 or similar marine grade sealant
- Vise grips
- Wire cutter
Installation Instructions
Important: If you are installing a pre-assembled actuator with the sensor
wires already included, skip to step 6.
Installing New Upper Hinges with Sensors
Step 1 – Inside the transom, with the tabs in full up position, locate the
trim tab hydraulic line. If there is no pipe nipple visible inside the
transom, you have a short through-transom fitting connection, (see Figure 2).
Unscrew and remove the actuator away from the transom and use a 7/16″wrench to
remove the tubing from the upper hinge. Skip to step 3.
For standard installations, detach the tubing from the brass elbow (some fluid
will drip out). Remove the pipe nipple elbow assembly.
Do this procedure for both the port and starboard cylinders (see Figure 3).
Step 2 – Outside the transom, unscrew and remove the actuator from the
transom.
Step 3 – Snap the white plastic clip onto the shaft protruding from the bottom
of the cylinder, and ensure the lower hinge is securely attached.
Important: This clip must be used to keep the spring inside the cylinder
compressed. Grasp the cylinder and upper hinge with both hands and unscrew
counterclockwise from the cylinder body.
A small amount of fluid may spill. Discard the old upper hinge.
Step 4 – Important: Insert the sensor rod into the piston (see Figure 4). Make
sure that the O-ring is in place inside the new upper hinge. Insert the upper
hinge spacer (see Figure 4) into the inside of the cylinder (Flanged edge
facing up). Screw the new upper hinge onto the cylinder while keeping the
sensor rod inserted into center of the piston.
Tighten the upper hinge as tight as you can by hand.
Step 5 – Remove the plastic clip from the piston and repeat steps 2 – 4 for
the other cylinder.
Step 6 – Using the included template, drill a 5/16″ hole into the transom for
the sensor wire (see Figure 5 above). Screw the pipe nipple into the actuator
upper hinge (NO Teflon tape or pipe dope).
Tighten the nipple hand tight. Then, with vise grips, tighten two full turns …
NO MORE. Cover the end of the pipe nipple with masking tape. If you have the
short through-transom fitting, using a 7/16″ wrench, screw it in (NO Teflon
tape or pipe dope) until the fitting is snug; the shoulder of the fitting will
just touch the plastic of the upper hinge.
Step 7 – Carefully feed the sensor wire through the 5/16″ hole.
Apply sealant to the actuator upper hinge surface, around the pipe nipple,
screw holes, and cable. Secure the actuator upper hinge to the transom with
mounting screws. Grasp the cylinder body with both hands and tighten
(clockwise) securely. Step 8 – Inside the transom, remove the masking tape
from the pipe nipples. Carefully wrap Teflon tape around the male threads of
the pipe nipples. Holding the pipe nipples with vise grips (to prevent them
from turning) re-secure the 90 degree elbows. Reattach the hydraulic tubing,
and tightening the nut finger tight.
Snug the nut with a 1/2″ wrench. Do not over-tighten.
Note: If you have the short through-transom fittings, omit this step.
Repeat for other side.
Run the gray sensor wires to the location you plan to mount the EIC Module.
Step 9 – Mounting the EIC Display using the drilling template, mark the
location for your EIC Display and locate the centers of the holes. Use a 1″
hole-saw to cut the center hole and 3/16″ drill for the four mounting stud
holes. Use a small bead of sealant around the perimeter of the display to
seal. Plug the EIC Harness (blue cable) into the back of the EIC Display.
Use the 4 nylon thumb nuts to secure the display (use care to avoid over-
tightening).
Step 10 – Mounting the EIC Relay Module. The Module is best located in a dry
location close to the Hydraulic Power Unit.
Use the mounting hardware to secure it in place.
Step 11 – Running the EIC Wire Harness from the Display to the Module. Run the
EIC Harness to the location you have selected for the EIC Relay Module. Plug
the EIC Wire Harness into the EIC Relay Module. The cable must be properly
strain relieved and secured with cable ties. For best results, create a drip
loop.
Step 12 – Connecting the Wiring for the EIC. Purple wire with inline 1.5 amp
fuse: Connect to ignition switch or any 12 volt circuit that turns ON and OFF
with ignition. This wire is used to initiate Auto Tab Retraction when the
ignition is switched to the OFF position. If Auto Tab Retraction is not
desired this connection may be omitted.
Orange wire with inline 1.5 amp fuse: To source that supplies power to boat’s
electronics and or gauges. This wire powers the display and must be
installed.
Making Electrical Connections (See Figure 6)
Ground wire from pump: Run the black ground wire from the back of the
hydraulic power unit to the grounding stud on the Relay Module. Crimp the
supplied ring terminal on wire and secure with 10-32 hex nut.
HPU Connection: Plug the 4-color wire harness from the Hydraulic Power Unit
into the 4-color output cable (longer of the two harnesses) on the EIC Relay
Module.
Sensor Wires: Plug the Stbd. sensor wire into the green wire connector on the
EIC Module. Plug the Port sensor wire into the red wire connector on the EIC
Module.
Power Cable: Attach the black wire to 12 volt negative ground and the orange
wire with inline 20 amp fuse to 12 volt positive source. Power source must be
capable of supporting 20 amps.
Auto Tab Control: (Shorter of two harnesses) This plug is used to interface a
Bennett Auto Tab Control into the EIC System. Please refer to Auto Tab Control
Installation Instructions. If no Auto
Tab Control is installed this lead is not used.
Calibration and Operation
Note: If you have Upper and Lower Helm EIC Displays installed, calibration must be done at the Primary EIC Display (connected to the EIC301 – thick gray cable). Reconnect the battery power to begin the calibration process. Check trim tab system to ensure it is operational, then put both trim tabs in the full up position by holding down the “Bow Up” position.
- The port and starboard red LEDs will flash alternately, indicating that the system is not calibrated.
- Press and hold the sun and moon buttons on the EIC Display simultaneously for approximately 3 seconds. Both the port and starboard lower yellow LEDs will begin to flash. Release the sun and moon buttons.
- Using the EIC Display, run both trim tabs to the full down position (Bow Down on the control). Make sure the tabs go all the way DOWN by holding the buttons down for at least 15 seconds or until the lower yellow LEDs stop flashing. (Holding the buttons after the tabs are down will not harm the system).
- A few seconds after the tabs are all the way down the port and starboard upper yellow LEDs will begin flashing. Again, using the EIC Display, run both tabs to the full up position (Bow Up on the control). Make sure the tabs come all the way UP by holding the buttons down for at least 15 seconds or until the upper yellow LEDs stop flashing.
- The upper and lower yellow LEDs will then light up solidly, indicating that the EIC is calibrated and ready to operate. If you wish to recalibrate the EIC at any time, simply bring the tabs to the full up position, press and hold the sun and moon buttons down and repeat the calibration instructions.
Operation
The brightness of the display may be adjusted by pressing the sun button to
brighten and the moon button to dim the display.
Diagnostic Information
- Port and starboard red LEDs alternately flash: EIC requires calibration. Follow steps above.
- Upper yellow LED flashes on port or starboard side:
Indicates the EIC Display is not receiving a sensor signal. If the port upper yellow LED flashes, the fault is in the port sensor or wires. A flashing yellow LED on the starboard side would indicate a fault on the starboard sensor or wires. Switching the sensor connections on the EIC Relay Module will confirm the diagnostic code if the flashing LED switches sides. If the problem switched sides, check the suspected faulty actuator with an Ohm meter at the EIC sensor cable plug. The reading should be in the 220-260 Ohm range. If the sensor readings are good, check for faulty connections (corrosion or broken wires).
Electro-Hydraulic System Information
- EIC Relay Module Fuse: 12 volt system uses 20 amp in-line fuse on positive, 24 volt uses 10 amp. EIC Display Fuses: Both Purple and Orange wire fused at 1.5 amp for both 12 and 24 volts.
Hydraulic Power Unit and EIC Module Wiring
Red = Port Valve
Green = Starboard Valve
Yellow = Motor Reverse (pump retract)
Blue = Motor Forward (pump pressure)
Black on HPU = Connects to Ground Stud on EIC Module
Orange on EIC Module = Positive
Black on EIC Module = Ground (boat’s electrical system)
Troubleshooting
(This general information is not intended to be complete. Please feel free to
contact Bennett Marine at 866.894.1626 or visit our website at
BennettTrimTabs.com for additional information.)
If Trim Tabs do nothing, no movement, no sound from HPU:
Inspect 20 amp fuse on orange wire at Relay Module and 1.5 amp fuse on orange
wire at display. Inspect all wiring for disconnected or corroded connections.
HPU running but Trim Tabs do not move, or will go down but not retract: Is
unit receiving solid 12 volts to EIC Module? Low voltage will sometimes cause
solenoids to not open preventing the tabs from moving even though the pump
motor is running.
Inspect all wiring for disconnected or corroded connections.
Conduct the following test using the “Spare for Auto Tab
Control” connector at the EIC Module:
Operation = Reaction
Apply 12 volts (+)to blue, red = Port trim tab down
Apply 12 volts (+)to blue, green = Starboard trim tab down
Apply 12 volts (+)to blue, red, green = Both trim tabs down
Apply 12 volts (+)to yellow, red = Port trim tab up
Apply 12 volts (+)to yellow, green = Starboard trim tab up
Apply 12 volts (+)to yellow, red, green = Both trim tabs up
If the trim tabs function correctly for each wire grouping, then the Display
or EIC Wire Harness is at fault.
If the system does not function properly, then conduct the same test using the
wire harness connected to the HPU. If the trim tabs function correctly then
the Module is faulty. If the trim tabs do not function correctly, the HPU is
at fault.
Have questions?
We’re here to help.
Call us at 866-894-1626.
Electronic Indicator Control (EIC5000) Drilling Template
Actuator Upper Hinge Templates
Documents / Resources
|
BENNETT MARINE EIC5000 Electronic Indicator Control
Kit
[pdf] Instruction Manual
EIC5000 Electronic Indicator Control Kit, EIC5000, Electronic Indicator
Control Kit, Indicator Control Kit, Control Kit
---|---
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>