SEALEY SGA10 Oxyacetylene Welding and Cutting Set Instruction Manual
- June 13, 2024
- SEALEY
Table of Contents
OXYACETYLENE WELDING & CUTTING SET
MODEL NO: SGA10
Thank you for purchasing a Sealey product. Manufactured to a high standard,
this product will, if used according to these instructions, and properly
maintained, give you years of trouble free performance.
IMPORTANT: PLEASE READ THESE INSTRUCTIONS CAREFULLY. NOTE THE SAFE
OPERATIONAL REQUIREMENTS, WARNINGS & CAUTIONS. USE THE PRODUCT CORRECTLY AND
WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO SO MAY CAUSE
DAMAGE AND/OR PERSONAL INJURY AND WILL INVALIDATE THE WARRANTY. KEEP THESE
INSTRUCTIONS SAFE FOR FUTURE USE.
SAFETY
Always have a fire extinguisher nearby.
Never use oxygen or fuel gas to blow soot or dirt from your clothes.
DO NOT wear ragged clothes, as sparks can ignite the ragged or loose ends.
Always wear goggles or a helmet with the appropriate shade lens.
DO NOT use shaded safety spectacles or unshaded face shield visors for cutting
or welding. They DO NOT stop the harmful rays which cause eye damage.
Use gauntlet type gloves made from heat resistant material.
Secure cylinders to a trolley, wall or post to prevent them from falling.
All cylinders should be used and stored in an upright position.
Never drop or strike a cylinder. DO NOT use cylinders that have been dented.
Cylinder caps should be used when storing or moving cylinders.
Empty cylinders should be kept in specified areas and clearly marked ‘EMPTY’.
Examine hoses for cuts, burns or worn areas before each use. Also inspect
fittings for damage. If any damage is found, replace immediately.
DO NOT repair hose with tape.
Always use reverse flow check valves on torch and flashback arrestors on the
regulator. This greatly reduces the possibility of mixing gases in the
regulator or hoses. Reverse flow check valves are an important safety
precaution.
Working pressure on the acetylene regulator should NEVER be set above 15psi
(1bar).
Keep all threads and unions clean and free from oil, dirt or grease.
Never apply oil or grease to any thread, inlet or outlook connection or
cylinder valves.
These instructions cover the use of the kit on mild steel. If used on any
other materials, extra precautions will have to be taken.
Make sure that there is a good flow of air to the user and the tip, at all
times. Use a welding fume extractor if conditions are poor or space is
confined.
Never leave the gun alight and unattended.
For safety advice regarding gas bottles (oxygen and acetylene) refer to the
supplier of the bottles.
Make sure bottle keys are in place at all times so that in the event of an
emergency the valves can be turned off quickly.
Keep hoses away from flame at all times. Make sure that hoses are laid flat
where possible and not in a position where they can be run over by vehicles,
which would result in permanent damage.
‰ WARNING! LEAKING HOSES CAN KILL. Leak test all connections and valves
prior to each use of the equipment. Ensure hose fittings are sufficiently
tightened to the torch. We recommend to tighten both joints at the same time
using two spanners to offer counter resistance whilst applying sufficient
pressure to tighten all connections to ensure no leaks and no damage to the
torch.
If hoses are not long enough, join them together with the manufacturer’s
couplings only.
DO NOT join damaged hoses, they must be replaced immediately.
Remember at all times BLUE = OXYGEN ‘O’ RED = ACETYLENE ‘A’
At no time may you interchange parts contained in this kit with those of other
manufacturers. Only Sealey replacement items should be used.
Acetylene fittings have a left-handed thread and notches on hose unions to
indicate this.
The regulators in this kit have no user-serviceable parts. All
repairs/calibrations must only be undertaken by a BCGA approved service agent.
INTRODUCTION
A complete set of regulators and torches for oxyacetylene gas welding. Single stage gas regulators with two gauges to show bottle pressureandworkingpressure.5m twin gasho se setwith hose check valves (totorch)andEN730 compliant pressure activated flash arrestors (to regulators). Welding torch with three lightweight nozzles. Cutting torch attachment with three AFNM cutting nozzles. Cup design spark lighter traps gas to ensure ignition. Supplied with storage bag.
CONTENTS
- Torch handle
- Mixer nozzle
- Cutting attachment
- Cutting nozzles
- Welding nozzles
- Nozzle cleaning tools
- Spark lighter
- Flash arrestors
- Regulator ACETYLENE
- Regulator OXYGEN
- Hoses
- Storage bag
ASSEMBLY
WARNING! Danger of explosion. All parts which come into contact with acetylene
or oxygen, including hands and tools, must be free from oil or grease. If
grease or oil is found on a cylinder, discontinue its use immediately and
contact your gas supplier.
4.1. PREPARING THE CYLINDERS
4.1.1. Make sure that the cylinder to be used is safe and properly secured as
noted in the safety precautions.
4.1.2. Whilst standing to one side or to the rear of the cylinder ‘crack’ each
cylinder valve. ‘Cracking’ is to quickly open and close the valve allowing gas
to escape and thus clear the valve of any dust, dirt or foreign bodies.
4.2. CONNECTING THE GAS REGULATORS TO THE CYLINDERS
NOTE: Pressure regulators should be treated as precision instruments and
should not be jarred or knocked.
4.2.1. Function of the regulators.Fitted to the outlets of the gas cylinder
valves, the pressure regulators reduce the pressure of the gas from cylinder
pressure to the constant lower pressure required for the operation of the
equipment. The left hand gauge indicates the pressure in the cylinder.
The right hand gauge indicates the pressure of the gas being delivered to the
torch. Pressure reduction within the regulator occurs in two stages.
4.2.2. Use only oxygen regulators to control the oxygen supply. Switching
regulators from non-oxygen to oxygen use can introduce contaminants to the
system. Ensure that the valve is always clean and completely free of grease or
oil. Use a lint free cloth to thoroughly clean the regulator before use. Never
use an oxygen regulator for other gases.
4.2.3. Attach oxygen and acetylene regulators to the appropriate cylinders. On
each gauge ensure the inlet filter is in place and is not blocked or
contaminated. If an ‘0’ ring is fitted to the inlet, check for damage and
replace if necessary with an ‘0’ ring recommended by the regulator
manufacturer. Do not use any form of jointing paste or tape between regulators
and cylinder valves.
4.2.4. Before attaching the gauges wipe the fittings with a clean dry lint
free cloth. Screw the union at the base of each regulator to the appropriate
cylinder by hand. Ensure that the gauge is correctly orientated so as to be
seen properly by the operator in use.
4.2.5. To tighten, turn CLOCKWISE for OXYGEN, and ANTI-CLOCKWISE for
ACETYLENE. A wrench should be used to ensure tight connections.
4.2.6. Before opening the cylinder valve, ensure that the oxygen regulator’s
pressure adjusting screw is released. To do this, rotate the screw counter
clockwise until it turns freely.
4.2.7. Close the regulators by turning the adjusting screws anti-clockwise to
relieve the pressure on the diaphragm before opening the cylinder valve. If
this is not done, pressure from the cylinder can damage the diaphragm and
render the regulator inoperative.
4.2.8. Cylinder valve-to-regulator connections should be checked for leaks
using an approved leak detection spray or soap and water solution.
4.2.9. Stand to one side while opening the oxygen cylinder valve. Open the
valve as slowly as possible until the high pressure gauge reaches cylinder
pressure. Ensure you open the cylinder valve slowly as surges of high pressure
can cause a blow out.
4.3. CONNECTING THE FLASH ARRESTORS AND HOSES TO THE GAS REGULATORS
4.3.1. Connect the BLUE, OXYGEN flash arrestor to the outlet on the OXYGEN
regulator. fig1A
4.3.2. Then, connect the BLUE hose to the BLUE, OXYGEN flash arrestor.
4.3.3. Connect the RED, ACETYLENE Flash arrestor to the outlet on the
ACETYLENE regulator.
4.3.4. Then, connect the RED hose to the RED, ACETYLENE flash arrestor.
4.3.5. Tighten all nuts securely with a wrench. If any sign of oil or grease
is found on the flash arrestors or regulators discontinue use immediately.
NOTE: New hoses contain a preservative powder which must be blown out
before use.
4.3.6. Prior to attaching the torch, blow out both hoses to eliminate any
particles or debris. Perform this on one hose at a time and in a well
ventilated area, otherwise you may create conditions for fire or explosion.
a. Turn the oxygen or acetylene regulator adjusting screw clockwise to allow
5psi to pass through hose.
b. Allow oxygen or acetylene to flow for approximately 10 seconds to purge
each hose in turn.
4.4. ASSEMBLING THE TORCH FOR WELDING Refer to (fig.2)
‰ WARNING! The teflon seal on the welding attachment inlet must not be
damaged or missing, otherwise gases will mix inside the torch and result in
flashbacks or backfires. Always inspect the seal, coupling nut and torch
head.If either damage or oil is found, discontinue use and contact your
supplier.
4.4.1. Screw the chosen welding nozzle into the welding attachment making sure
that it is fully tightened down.
4.4.2. Screw the welding attachment with nozzle attached onto the torch handle
as shown below. Before fully tightening the ribbed nut, check that the
orientation of the gas valve knobs suits your normal welding practice. Adjust
if necessary and fully tighten the ribbed nut.
4.5. ASSEMBLING THE TORCH FOR CUTTING (fig.3)
‰ WARNING! The teflon seal on the cutting attachment inlet must not be
damaged or missing, otherwise gases will mix inside the torch and result in
flashbacks or backfires. Always inspect the seal, coupling nut and torch head
for damage or oil. If either damage or oil is found, discontinue use and
contact your supplier.
4.5.1. To change the cutting nozzle loosen and remove the nut which holds it
in place and withdraw the nozzle. Slide the chosen cutting nozzle through the
nut and screw the assembly into the cutting attachment and fully tighten down.
4.5.2. Screw the cutting attachment with nozzle attached onto the torch handle
as shown below. Before fully tightening the ribbed nut, adjust the orientation
of the gas valve knobs so that they do not block the movement of the lever
(B).
4.6. CONNECTING THE NON-RETURN VALVES AND HOSES TO THE TORCH
4.6.1. Always fit the non-return valves provided to the torch before
connecting the respective hoses. The non-return valves provided have different
direction threads to ensure that they are fitted to the correct side of the
torch. The OXYGEN non-return valve has a normal thread and will fit to the
blue coded side of the torch. (See colour coding on valve knobs). The
ACETYLENE non-return valve has a reverse thread and will fit to the red coded
side of the torch. (See colour coding on valve knobs).
4.6.2. Connect the two hoses to the respective non-return valves fitted to the
torch handle.
‰ WARNING! Ensure hose fittings are sufficiently tightened to the torch,
We recommend to tighten both joints at the same time using two spanners to
offer counter resistance whilst applying sufficient pressure to tighten all
connections to ensure no leaks and no damage to the torch.
‰ WARNING! If traces of oil or grease are found, DO NOT use. Contact your
gas supplier immediately.
WELDING OPERATION
‰IMPORTANT! LEAK TEST ALL CONNECTIONS AND VALVES PRIOR TO EACH USE OF THE
EQUIPMENT.
Note: These instructions are intended to describe the facilities and
operation of the welding/cutting torch. They are not intended to teach you how
to weld or cut using oxyacetylene. If you have no experience of
welding/cutting using oxyacetylene it is essential that you seek training
from a qualified person or approved training organisation.
5.1. Assemble the torch for welding as described in section 4.4 (See also
fig.2)
5.2. SETTING THE GAS REGULATOR PRESSURES
NOTE: Outlet pressures should not be set in excess of those needed for
the intended operation. The regulator pressure-adjusting screw shall be set to
zero when the regulator is not in use by turning the the control knob fully
anti-clockwise.
5.3. Close the regulators by turning the adjusting screws anti-clockwise to
relieve the pressure on the diaphragm before opening the cylinder valves.
Slowly open the cylinder valve on the oxygen and acetylene bottles in turn. As
you do so the high pressure gauge (left hand) on each regulator will register
the pressure in the cylinder to which it is attached.
5.3.1. Slowly open each regulator in turn by turning the adjusting knob
clockwise. As you do so the outlet pressure gauge (right hand) on each
regulator will register the outlet pressure of gas being fed to the torch.
Adjust the pressure according to the size of nozzle in use and the thickness
of the material to be cut or welded. Refer to section 8 in the chart overleaf.
‰ WARNING! Never set acetylene regulator at a delivery pressure above
15psi (1bar).
5.3.2. After adjusting the regulators to the desired operating pressures check
connections for leaks using an approved leak detection solution.
Check for leaks at all connections. If a leak is found, tighten fitting more
securely. If leak persists, discontinue use and call your supplier.
5.3.3. Briefly open and close the oxygen valve on the torch handle to check
that the gas is flowing.
5.3.4. Similarly open and close the acetylene valve on the torch handle to
check that the gas is flowing.
‰ WARNING! Always use welding gloves and suitable eye protection when
welding or cutting. Contact your local Sealey stockist for a full range of
protective equipment.
5.4. LIGHTING THE TORCH Ensure that the gas hoses will not be in the way of
the torch when ignited. Ensure that the torch is facing away from you before
lighting.
5.4.1. Holding the torch in one hand and the striker in the other open the
acetylene valve a 1/4 turn (the valve knob is colour coded red). Operate the
striker close to the tip to light the acetylene.
5.4.2. The first flame that appears will be an orange/yellow colour giving off
a small amount of black smoke from its tip. If too much acetylene is flowing
the flame will be standing away from the tip of the torch making a roaring
noise. In extreme cases this type of flame can blow itself out. To correct
such a flame reduce the amount of acetylene until the flame is 8 to 10 inches
long with less black smoke.
5.4.3. Once the acetylene flame is set correctly begin to introduce oxygen by
slowly opening the oxygen control valve on the torch (The valve knob is colour
coded blue). The flame will change to a whitish colour and the black smoke
will disappear. This flame is not hot enough for welding.
5.4.4. Add more oxygen to the flame by further opening the control knob until
a brilliant neutral flame is achieved.
5.5. SHUTTING DOWN AND LEAVING SAFE
5.5.1. Turn off the acetylene valve on the torch first and then turn off the
oxygen valve a few moments later.
Note: Turning the gases off in the wrong order can cause damage to the
torch.
5.5.2. Close both cylinder valves.
5.5.3. Drain gas from oxygen regulator by opening the oxygen valve on the
torch handle. Similarly drain gas from the acetylene regulator.
5.5.4. Release the adjusting knobs on the regulators. This is done by turning
them anti-clockwise.
CUTTING OPERATION
‰ IMPORTANT! LEAK TEST ALL CONNECTIONS AND VALVES PRIOR TO EACH USE OF THE
EQUIPMENT.
Note: These instructions are intended to describe the facilities and operation
of the welding/cutting torch. They are not intended to teach you how to weld
or cut using oxyacetylene. If you have no experience of welding/cutting using
oxyacetylene it is essential that you seek training from a qualified person or
approved training organisation.
Assemble the torch for cutting as described in section 4.5 (See also fig.3)
6.1. GAS CONTROL WHEN USING THE CUTTING SET-UP
6.1.1. The control of the oxygen and acetylene flows on the cutting set-up
differs from the welding set-up in the following ways:
6.1.2. The oxygen control valve on the torch handle should be fully opened so
that regulation of the oxygen flow takes place using only the oxygen control
valve on the cutting attachment (see fig.3A).
6.1.3. The flow of the acetylene is still controlled by the red coded knob on
the torch handle.
6.1.4. The flame is then set up using these two control valves only.
6.1.5. Once the flame is set additional oxygen can be introduced into the
centre of the flame to initiate the cutting process by operating the oxygen
control lever (see fig.3B) mounted on the cutting attachment.
6.1.6. SETTING THE GAS REGULATOR PRESSURES
6.1.7. Close the regulators by turning the adjusting screws anti-clockwise to
relieve the pressure on the diaphragm before opening the cylinder valves.
Slowly open the cylinder valve on the oxygen and acetylene bottles in turn. As
you do so the high pressure gauge (left hand) on each regulator will register
the pressure in the cylinder to which it is attached.
6.1.8. Slowly open each regulator in turn by turning the adjusting knob
clockwise. As you do so the outlet pressure gauge (right hand) on each
regulator will register the outlet pressure of gas being fed to the torch.
Adjust the pressure according to the size of nozzle in use and the thickness
of the material to be cut or welded. Refer to the chart in section 8.
‰ WARNING! Never set acetylene regulator at a delivery pressure above
15psi (1bar).
6.1.9. After adjusting the regulators to the desired operating pressures check
connections for leaks using an approved leak detection solution.
Check for leaks at all connections. If a leak is found, tighten fitting more
securely. If leak persists, discontinue use and call your supplier.
6.1.10. Briefly open and close the acetylene valve on the torch handle to
check that the gas is flowing.
6.1.11. Ensure that the oxygen control valve on the cutting attachment is
closed.
6.1.12. Fully open the oxygen control valve on the torch handle.
6.1.13. Briefly open and close the oxygen control valve on the cutting
attachment to check that the gas is flowing.
6.1.14. Briefly operate the oxygen control lever on the cutting attachment to
check that the gas is flowing from the centre of the cutting nozzle.
‰ WARNING! Always use welding gloves and suitable eye protection when
welding or cutting. Contact your local Sealey stockist for a full range of
protective equipment.
6.2. LIGHTING THE TORCH
6.2.1. Ensure that the gas hoses will not be in the way of the torch when
ignited. Ensure that the torch is facing away from you before lighting.
6.2.2. Holding the torch in one hand and the striker in the other open the
acetylene valve on the torch handle a 1/4 turn (the valve knob is colour coded
red). Operate the striker close to the tip to light the acetylene.
6.2.3. The cutting tip has six separate holes in it arranged radially and each
of these holes will have a small flame coming from it. Develop the correct
flame at each hole by alternately increasing the flow of acetylene and then
oxygen until a neutral flame is achieved at each hole having a white cone
about an 1/8” long.
6.3. USING THE OXYGEN CONTROL LEVER
6.3.1. Use the pre-heat flame to heat the metal to be cut to a cherry red
colour. When the metal reaches this stage press the oxygen control
lever to initiate the cutting process. This feeds additional oxygen through a
central hole in the cutting tip.
No flame is produced from this hole but the pure oxygen reacts chemically with
the hot metal causing it to oxidise i.e. burn away.
6.4. SHUTTING DOWN AND LEAVING SAFE
6.4.1. Turn off the acetylene valve on the torch first and then turn off the
oxygen valve a few moments later.
Note: Turning the gases off in the wrong order can cause damage to the
torch.
6.4.2. Close both cylinder valves.
6.4.3. Drain gas from oxygen regulator by opening the oxygen valve on the
torch handle. Similarly drain gas from the acetylene regulator.
6.4.4. Release the adjusting knobs on the regulators. This is done by turning
them anti-clockwise.
MAINTENANCE
7.1. Annual maintenance should be carried out by a person who has sufficient
practical experience of oxyacetylene gas equipment and a detailed theoretical
knowledge of the functioning of the equipment, the properties of gases used
and potential defects and hazards which may occur and their importance to the
integrity and safety of the equipment.
7.2. Regulator elastomers and seals will wear and deteriorate in service and
will also deteriorate out of service. Regulators stored for 1 year or over
without use should receive inspection as per the annual maintenance schedule.
Equipment | Maintenance |
---|---|
Each time equipment is used by the operator | Annual |
refurbishment Intervals | Replacement/ refurbishment guidelines |
REGULATORS and their integral protective devices. | Visual examination to |
determine suitability for service (e.g. correct gas. pressure rating, damage,
condition of threads and sealing surfaces, oil or grease contamination).
Leak test all joints at working pressure.| Functional tests to ensure correct
operation.| 5 years or manufacturer’s ecommendations.
NOTE: If regulators are repaired or refurbished this shall be done in
accordance with the BCGA Code of Practice CP17 by a reputable repairer.|
Replace with a now. repaired or service exchange unit.
FLASHBACK ARRESTORS and their integral cut off valves.| Visual examination to
determine suitability for service (e.g. correct gas. pressure rating, damage.
condition of threads and sealing surfaces, oil or grease contamination).
Leak test all joints at working pressure.| Check unit for flow restriction.
Reverse flow to ensure correct operation of non-return valves and pressure
sensitive cut off valves where fitted. If of the pressure sensitive type check
shut off In the tripped condition in the direction of flow.| 5 years or the
manufacturer’s recommendations.| Replace with a new. repaired or service
exchange unit.
HOSE ASSEMBLIES (Including non- return valves).| Visual safety check to
determine suitability for service (e.g. gas, pressure rating.
damage). condition of cover (e.g. kinking and twisting), threads and sealing
surfaces. Check anti-whip restraints where fitted.
Leak test all joints at working pressure.| Reverse hose to ensure the correct
operation of non-return valve where fitted. bend hose in a tight radius to
ensure reinforcement Is not visible.| Determined by local operating
conditions.| Replace as required.
BLOWPIPES| Visual examination of the noule and Inlet seatings for damage.
Leak test all joints at working pressure.| Test valve functions. blank exits
and leak test (or intemal malfunctions.| Determined by local operating
conditions.| Replace with a new, repaired or service exchange unit.
TECHNICAL INFORMATION
Welding capacities|
---|---
| | Operating pressure (bar – lbf/in2)| Gas consumption (Itr/m – ft
/h)
Mild steel| Nozzle size| Oxygen| Acetylene| O2-
Cutting| O2- Heating| Acetylene
1.2mm / 18SWG| LWO2| 0.14 – 2| 0.14 – 2| 11/8/25| 4.2 – 9| 38.8 – 8
2.6mm / 12SWG| LWO5| 0.28 – 4| 0.21 – 3| 23.5 – 50| 4.2 – 9| 38.8 – 8
4mm / 8SWG| LW10| 0.35 – 5| 0.28 – 4| 56.6 – 120| 4.2 – 9| 38.8 – 8
Cutting capacities|
---|---
| | Operating pressure (bar – lbf/in2)| Gas consumption (Itrim –
ft’/h)
Mild steel| Nozzle size| Oxygen| Acetylene| 02-
Cutting| 02- Heating| Acetylene
6mm / 14″| 1/32″| 1/4/20| 0.30 – 4| 14.15 – 30| 8/5/18| 8.0 – 17
13mm / 1/2″| 3/64″| 2/1/30| 0.35 – 5| 30.70 – 65| 10/4/22| 9/4/20
25mm / 1″| 1/16″| 2/8/40| 0.40 – 6| 67.50 – 143| 13.2 – 28| 11/8/25
50mm / 2″| 1/16″| 3.1 -4.5| 0.40 – 6| 78.30 – 166| 13.2 – 28| 11/8/25
75mm / 3″| 1/16″| 3/5/50| 0.40 – 6| 88.70- 188| 13.2 – 28| 11/8/25
ENVIRONMENT PROTECTION
Recycle unwanted materials instead of disposing of them as waste. All tools,
accessories and packaging should be sorted, taken to a recycling centre and
disposed of in a manner which is compatible with the environment. When the
product becomes completely unserviceable and requires disposal, drain any
fluids (if applicable) into approved containers and dispose of the product and
fluids according to local regulations.
REGISTER YOUR PURCHASE HERE
https://qrco.de/bcy2E9
Note: It is our policy to continually improve products and as such we
reserve the right to alter data, specifications and component parts without
prior notice. Important: No Liability is accepted for incorrect use of this
product.
Warranty: Guarantee is 12 months from purchase date, proof of which is
required for any claim.
Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk.
IP32 7AR
01284 757500
01284 703534
sales@sealey.co.uk
www.sealey.co.uk
© Jack Sealey Limited
Original Language Version
SGA10 Issue:1 07/10/22
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>