RGF HALO-LED Whole Home Air Purification Instruction Manual

June 12, 2024
RGF

halo led logo

RGF HALO-LED Whole Home Air Purification

TEMPLATE
Remove page and tape to duct work where unit will be installed. Using suitable tool cut through template and duct work.

RGF HALO-LED Whole Home Air Purification 1

The HALO-LED™ by RGF®
Thank you for purchasing the HALO-LED™ by RGF Environmental Group, Inc. The HALO-LED™ is the industry’s first LED in-duct, whole home air purification system that is both mercury free and zero ozone compliant. The HALO-LED™ proactively treats the air-conditioned space, thereby reducing airborne and surface bacteria, viruses, mold and voes. Leveraging bi-polar ionization the HALO-LED™ provides the added benefit of reducing airborne allergens, dust and particulate. The new patent pending technology utilizes an exclusive hybrid hydrophilic washable ceramic catalyst and is powered by a proprietary low energy, ultra-long-life, LED array. By combining REME-LED® UV technology along with RGF’s proven PHI-CELL® and REME technologies, the HALO-LED™ provides revolutionary indoor air purification.

RGF HALO-LED Whole Home Air Purification 2

HALO-LED™ INSTALLATION INSTRUCTIONS

Your box contains the following:

  • HALO-LED™ unit
  • Adhesive backed foam gasket and aluminum sealing ring
  • Three (3) mounting screws
  • Six (6) wire nuts
  • Instructions and Warranty Registration Card
  • Caution UV Light In Use decal
  • 24 VAC transformer
  • Fan control relay

NOTICE TO INSTALLER & HOMEOWNER
This unit MUST be installed and wired to cycle on/off with the blower. This installation is required in order to be in compliance with new safety standards and to ensure maximum energy efficiency and LED module service life.

INSTALLATION INSTRUCTIONS

  1. Mounting Location:
    • To maximize the effectiveness of the HALO-LED™, it is recommended, whenever possible, to install the HALO-LED™ unit in the air plenum just after the air handling unit (supply side). Refer to Figure 2.
    • Locate the unit in the plenum/duct box AFTER the fan. Position it near a suitable power source with enough room to accommodate the mounting plate.
    • Once a suitable location is determined, position the HALO-LED™ unit midway in the air duct.
  2. Mounting Unit:
    • Using a 4-1/2″ hole saw, or the provided template, cut a hole into the plenum/duct box. Cutting into fiberboard is usually easier than metal, and can be done with a utility knife. Refer to Figure 3. Be sure to drill into the duct only. Do not penetrate into the mechanical areas of the HVAC system.
    • Be sure the mating area of the duct surface is clean and dry. Secure the mounting plate sealing to the ring duct affixed by to first the peeling back side the of paper the backing mounting off plate the Refer self/adhesive to Figure 4.RGF HALO-LED Whole Home Air Purification 5
    • Insert airflow unit of the into HVAC opening unit. with Once the attached to cator duct, going press in firmly the all same around the direction the as flange the to to secure ensure a the proper unit with seal. the Refer provided to Figure screws 5. In via some the three installations, mounting it may holes be located preferred to secure the unit with the provided screws via the three mounting holes located on the HALO-LED mounting plate.

Electrical Connections:

NOTICE TO INSTALLER & HOMEOWNER
This unit MUST be installed and wired to cycle on/off with the blower. This installation is required in order to be in compliance with new safety standards and to ensure maximum energy efficiency and LED module service life. The HALO-LED™ must be powered using the supplied 40VA transformer.

The transformer is designed to be wired in different ways depending on the type of HVAC unit:

  1. Variable speed fans with electric heat and without a communicating thermostat, use the supplied transformer and refer to Diagram 1 in Appendix for wiring diagram

  2. Variable speed fans with a communicating thermostat, the output of the transformer must be connected through an ‘Air Sensing Switch’ (purchased separately using HLED-AS). Refer to Diagram 2 in Appendix for wiring diagram

  3. HVAC system using a NEST Thermostat, the output of the transformer must be connected through an ‘Air Sensing Switch’ (purchased separately using HLED-AS). Refer to Diagram 2 in Appendix for wiring diagram.
    NOTE : When using an ‘Air Sensing Switch’ thermostat cannot be set to FAN-ON. Set thermostat to AUTO or CIRCULATE MODE only.

  4. For HVAC units with gas heat and 2-speed blower refer to Diagram 3 in Appendix for wiring diagram

  5. For HVAC units with powered Electronic Air Cleaner (EAC) terminal refer to Figure 4 in Appendix for wiring diagram. Powered EAC terminal cannot be wired directly to transformer. Use Isolation Relay

  6. For HVAC units with non-powered Electronic Air Cleaner (EAC) terminal refer to Diagram 5 in Appendix for wiring diagram.

Maintenance of the Ceramic Catalyst

  • In high smoke and particulate load environments it is recommended to clean the ceramic catalyst every six (6) months.

  • Disconnect power to the HALO-LED™ and remove black housing cover from the unit by turning counterclockwise. Refer to Figure 8

  • Remove the brass thumb screw that holds the ceramic catalyst. Refer to Figure 9.

  • Slide out the ceramic catalyst assembly. Refer to Figure 10.

  • The individual ceramic catalyst matrixes can be removed from the assembly and washed with warm water and a mild detergent. In environments such as heavy smoking rooms the ceramic can be immersed in boiling water for several minutes.

  • Be sure each ceramic catalyst matrix is completely dry before reassembling and returning to the HALO-LED™ unit.

HALO-LED™ Cell Replacement
The HALO-LED™ Cell should be replaced after five (5) years with RGF part number PHIC-REME-LED

RGF HALO-LED Whole Home Air Purification 10

  • Disconnect power to the HALO-LED™ and remove the black housing cover by twisting counter clockwise. Refer to Figure 11
  • Unplug four (4) power cords on the electric board. Refer to Figure 12 and Figure 13.RGF HALO-LED Whole Home Air Purification 12
  • Use a Phillips screwdriver to unscrew two (2) screws holding the electrical power board in place, remove and set aside. Refer to Figure 14 and Figure 15

RGF HALO-LED Whole Home Air Purification 13

  • Use a Phillips screwdriver to unscrew one (1) screw holding the HALO-LED™ Cell in place . Refer to Figure 16

RGF HALO-LED Whole Home Air Purification 14

  • Carefully pull HALO-LED™ Cell from housing. Refer to Figure 17
  • Reverse the above procedure to install the new HALO-LED™ Cell.

Appendix

RGF HALO-LED Whole Home Air Purification
16

RGF HALO-LED Whole Home Air Purification 17

FIVE+ TWO YEAR LIMITED WARRANTY

This warranty supersedes and replaces any warranty statements made orally by the sales person, distributor, or dealer, or contained in the written instructions or other brochures or informational documents related to this product. Manufacturer warrants the HALO-LED™ unit to be free from defects in material and workmanship under normal use and service when operated and maintained in accordance with manufacturer’s instructions for a period of five years (sixty months) from the original date of purchase (excluding the LED cell). The warranty is extended an additional two years (24 months), for a total of seven years (84 months), if the unit is registered (excluding the LED cell). The HALO-LED™ cell included with the original unit is warrantied to be free from defects in material and workmanship for a period of four years (48 months) from original date of purchase.

International purchases are warrantied for twelve (12) months from original date of purchase. Parts only. Shipping not included.
For the warranty period, the manufacturer offers an immediate over-the-counter exchange for a demonstrated defective unit. The company making this exchange, and requesting credit for said unit is obligated to verify that the unit or LED cell is in fact defective. The unit will need to be returned to the manufacturer under a Returned Materials Authorization (RMA) for review and/or repair (if found defective).
This warranty does not cover:

  • Parts damaged by decomposition from chemical action, humidity, moisture, or wear caused by abrasive materials;
  • Damage resulting from misuse, abuse, or any other use other than its intended use;
  • Improper operation, maintenance, installation, modification or adjustments;
  • Parts not made by manufacturer are not warrantied.

THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF.

NOTE TO CONTRACTOR
TO OBTAIN WARRANTY SERVICE AND RETURN AUTHORIZATION NUMBER, CONTACT YOUR SUPPLIER. INCLUDE A COPY OF THE BILL
OF SALE, INVOICE OR RECEIPT OF PURCHASE. WITH AN EXPLANATION OF THE PROBLEM OR DEFECT.

FREQUENTLY ASKED QUESTIONS

Why should I register the warranty?
Registering the unit with the Manufacturer extends the warranty from (S) five years to (7) seven years. Register warranty online at www.rgf.com/registration to receive two (2) extra years of warranty protection.

How long is the warranty?
Four (4) years for the cell from the original date of purchase. Unregistered unit: Five (5) years for the unit from the original date of purchase. Registered unit: Seven (7) years for the unit from the original date of purchase.

Who do I contact about the warranty or if I have a question about the unit?
First, contact your local HVAC contractor to answer the question and verify your warranty. If they cannot answer the question or verify your warranty, you can contact the RGF Customer Service department at [email protected].

Are there any limits to the warranty? Yes.
Yes, please refer to the Limited Warranty for full details.

What should I do to avoid problems or injuries when running my HALO­LED unit?
Thoroughly read and understand all installation instructions, warnings and precautions before use.

Is it OK to run the unit all the time? No.
No. This unit MUST be installed and wired in parallel with the blower to cycle on/off with the blower. This installation is required in order to be in compliance with new safety standards and to ensure maximum energy efficiency and LED module service life.

Can the unit be installed on the return air side of the HVAC? Yes, but ..
Yes, but the best location for your HALO-LED TM unit is in the plenum just after the air handler. This allows for full distribution and extended air treatment. In situations where it is impossible to locate the unit after the air handler, it is acceptable to locate the HALO-LED unit before the air handler; however, the high moisture content of the cooling coils and the high temp of the heating coils will reduce the effective treatment capacity of the unit.

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

RGF User Manuals

Related Manuals