ACEVIEW FE-AM3-16P3-01OCPP4G AC Electric Vehicle Charging Station User Manual

June 12, 2024
ACEVIEW

AC EV Charging Station Manual Before operating this product, please read the operating instructions carefully

Product Overview

Product Features

  1. With RFID function to start or stop charging.
  2. With the function of appointing charging time and appointing charging duration.
  3. Equipped with display screen to show charging information in real time.
  4. With overload protection, over-voltage protection, under-voltage protection, over-temperature protection, leakage protection, emergency stop and other functions.

Technical Specification

Model FE-AM3-16P3-010CPP4G FE-AM3-32-010CPP4G FE-AM3-32P3-010CPP4G
Current (adjustable current) 16A(8/10/13/16A) 32A(8/10/13/16/32A)

32A(8/10/13116/32A)
Voltage| 415V| 250V| 415V
Power| 11kW| 7kW| 22kW
Frequency| 50/60Hz
Communication(Optional)| Ethernet, 4G, OCPP1.6
User interface| LED light + LCD display (4.3 inch) + RFID
Charging interface| Type2+5M cables or custom cable length
Degree of protection| Charging gun: IP55, charging station: IP65
Operating temperature| -30°C to 50°C
Operating humidity| 5%-95%
Product dimensions
(HWD)mm| 325220100

Installation Steps

  1. REFERENCE PAPER indicate the position of screw
  2. Hammer the M4.0 PLACTIC BOLTS into the holes
  3. Fix the PLATE with M4.0 KB SCREWS on the wall
  4. Place STATION onto PLATE on the wall
  5. Lock the bottom anti-theft screws,then put the hook and HOLDER anywhere you need
  6. Tear off the protector

Steps For Wiring

Mode I:

Using the connection to the distribution box, the input line of the plug street L1 L2 L3 N PE terminal is connected to the L1 L2 L3 N PE terminal of the open air respectively.
Mode II:

Connect the connector then need to connect the two ends of the connection note that L1 L2 L3 N PE correspondingly connected, squeeze the connection with crimping pliers to ensure good contact.

Steps For Usage

  1. Make sure the charging box is connected power.
  2. Connect the EV and the charging box with the EV charging cable.
  3. Swipe the card to start.
  4. The vehicle is charged normally.
  5. End of swipe.
  6. Unplug the device and wrap the cable around the hook.

Charging status and LED definition

Working Status Red Green Blue
Ready / Bright /
Connect / / Bright
Charging / / Breathe
Metering communication error Flash for 1 / /
Under-voltage alarm Flash for 2 / /
Overvoltage alarm Flash for 3 / /
Ground fault Flash for 4 / /
Over current protection Flash for 5 / /

Permanent overcurrent
protection| Flash for 6| /| /
Leakage protection| Flash for 7| /| /
Over temperature protection| Flash for 8| /| /
Emergency stop button| Flash for 9| /| /
RFID failure| Flash for 10| /| /
Relay failure| Flash for 11| /| /
Gun lock fault| Flash for 12| /| /
Memory failure| Flash for 13| /| /
Clock exception| Flash for 14| /| /
| |
---|---|---
Ready
LED light: Green, always on| Charging / charging completed
LED light: Blue (flashing / always on)| The fault
LED light: blinking red

Fault Code

Fault display Possible Causes
Over-temperature fault 1.The ambient temperature exceeds the operating

temperature specification
2.AC power input voltage too high
3.Internal charger failure
Device overvoltage| 1.AC power input voltage too high
2.Internal charger failure
Device undervoltage| 1.AC power input voltage too low
2.Internal charger failure
Meter unconnected!| 1.Metering module failure
Emergency fault| 1.Emergency stop button pressed
2.Emergency stop button damaged
Electric leakage fault| 1.Residual current monitoring sensor failure
2.Residual current leakage occurs
RFID unconnected| 1.Card reader failure
Grounding fault| 1.Ground Fault
OverCurrent fault| 1.Overload protection

LCD Display

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals