ACEVIEW FE-AM3-16P3-01OCPP4G AC Electric Vehicle Charging Station User Manual
- June 12, 2024
- ACEVIEW
Table of Contents
AC EV Charging Station Manual Before operating this product, please read the operating instructions carefully
Product Overview
Product Features
- With RFID function to start or stop charging.
- With the function of appointing charging time and appointing charging duration.
- Equipped with display screen to show charging information in real time.
- With overload protection, over-voltage protection, under-voltage protection, over-temperature protection, leakage protection, emergency stop and other functions.
Technical Specification
Model | FE-AM3-16P3-010CPP4G | FE-AM3-32-010CPP4G | FE-AM3-32P3-010CPP4G |
---|---|---|---|
Current (adjustable current) | 16A(8/10/13/16A) | 32A(8/10/13/16/32A) |
32A(8/10/13116/32A)
Voltage| 415V| 250V| 415V
Power| 11kW| 7kW| 22kW
Frequency| 50/60Hz
Communication(Optional)| Ethernet, 4G, OCPP1.6
User interface| LED light + LCD display (4.3 inch) + RFID
Charging interface| Type2+5M cables or custom cable length
Degree of protection| Charging gun: IP55, charging station: IP65
Operating temperature| -30°C to 50°C
Operating humidity| 5%-95%
Product dimensions
(HWD)mm| 325220100
Installation Steps
- REFERENCE PAPER indicate the position of screw
- Hammer the M4.0 PLACTIC BOLTS into the holes
- Fix the PLATE with M4.0 KB SCREWS on the wall
- Place STATION onto PLATE on the wall
- Lock the bottom anti-theft screws,then put the hook and HOLDER anywhere you need
- Tear off the protector
Steps For Wiring
Mode I:
Using the connection to the distribution box, the input line of the plug
street L1 L2 L3 N PE terminal is connected to the L1 L2 L3 N PE terminal of
the open air respectively.
Mode II:
Connect the connector then need to connect the two ends of the connection note that L1 L2 L3 N PE correspondingly connected, squeeze the connection with crimping pliers to ensure good contact.
Steps For Usage
- Make sure the charging box is connected power.
- Connect the EV and the charging box with the EV charging cable.
- Swipe the card to start.
- The vehicle is charged normally.
- End of swipe.
- Unplug the device and wrap the cable around the hook.
Charging status and LED definition
Working Status | Red | Green | Blue |
---|---|---|---|
Ready | / | Bright | / |
Connect | / | / | Bright |
Charging | / | / | Breathe |
Metering communication error | Flash for 1 | / | / |
Under-voltage alarm | Flash for 2 | / | / |
Overvoltage alarm | Flash for 3 | / | / |
Ground fault | Flash for 4 | / | / |
Over current protection | Flash for 5 | / | / |
Permanent overcurrent
protection| Flash for 6| /| /
Leakage protection| Flash for 7| /| /
Over temperature protection| Flash for 8| /| /
Emergency stop button| Flash for 9| /| /
RFID failure| Flash for 10| /| /
Relay failure| Flash for 11| /| /
Gun lock fault| Flash for 12| /| /
Memory failure| Flash for 13| /| /
Clock exception| Flash for 14| /| /
| |
---|---|---
Ready
LED light: Green, always on| Charging / charging completed
LED light: Blue (flashing / always on)| The fault
LED light: blinking red
Fault Code
Fault display | Possible Causes |
---|---|
Over-temperature fault | 1.The ambient temperature exceeds the operating |
temperature specification
2.AC power input voltage too high
3.Internal charger failure
Device overvoltage| 1.AC power input voltage too high
2.Internal charger failure
Device undervoltage| 1.AC power input voltage too low
2.Internal charger failure
Meter unconnected!| 1.Metering module failure
Emergency fault| 1.Emergency stop button pressed
2.Emergency stop button damaged
Electric leakage fault| 1.Residual current monitoring sensor failure
2.Residual current leakage occurs
RFID unconnected| 1.Card reader failure
Grounding fault| 1.Ground Fault
OverCurrent fault| 1.Overload protection
LCD Display
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>