SnapNrack SpeedSeal DeckTrack Training User Guide
- June 4, 2024
- SnapNrack
Table of Contents
SnapNrack SpeedSeal DeckTrack Training
Overview
This training guide outlines best practices for installing the SpeedSeal™ DeckTrack attachment with integrated chemical fl ashing on composition shingle roofs. This guide is meant to supplement the RL Universal Installation Manual & provide detailed instructions on installation practices that produce high quality systems & maintain construction effi ciency. The target audience of this guide is experienced rooftop solar installers with a strong understanding of solar construction best practices, and a basic understanding of the RL Universal mounting system.
Required Tools
- Caulking Gun
- Drill Driver or Impact Driver
- Hex Socket
Materials Included
- SnapNrack SpeedSeal™ DeckTrack
Other Materials Required
- (4) SnapNrack 1/4″ ,or #14 Stainless Steel Lag, or Self-Drilling Screw with EPDM-Backed Washer
- Roof Sealant: SnapNrack recommends Chem Link sealants:
- M-1® Universal Adhesive & Sealant
- DuraLink® 35 Multi-Purpose Sealant
- DuraLink® 50 Super Adhesion Sealant
Application Note
Install on composition shingle roofs & rolled composition roofs with pitch greater than 9.5°.
Dimensioned SpeedSeal™ DeckTrack 1
SpeedSeal™ DeckTrack Installation
-
Position SpeedSeal™ DeckTrack. DeckTracks must be positioned with the portion between the lines entirely on one course of composition.
Best Practice: SpeedSeal™ DeckTrack should never be installed with the sealant gasket across two shingle courses. -
Fill all four cavities on bottom of SpeedSeal™ DeckTrack created by sealant gasket with roof sealant to ensure a water tight seal.
Installation Note: Do not prep out attachments with sealant. Add sealant as mounts are installed to avoid sealant drying before installation. -
Fill any seam between composition shingles within 4” of deck screws with sealant before attaching the DeckTrack. Typically, there are seams every 36” along a course of composition shingle
Installation Note: Another option is to attach the DeckTrack so the screws are more than 4” from the seam. This may require additional DeckTracks.before installation. -
Insert fi rst screw through SpeedSeal™ DeckTrack mounting hole and drive into roof.
Best Practice: Remove any dirt or debris from roof surface before SpeedSeal™ DeckTrack is installed. -
Tighten the screw until the rubber sealing washer is slightly squished out around the metal washer.
Best Practice: To avoid over tightening the screws a drill driver can be used with the clutch set to provide just enough torque to squish the rubber gasket. -
Repeat Steps 3 and 4 for the remaining three screws.
Install Note: Roof sealant should seep out from all four sealant vents located in the middle of the SpeedSeal™ DeckTrack, which ensures that a sufficient amount of roof sealant has been applied. If sealant is not seen in all three vents, remove SpeedSeal™ DeckTrack and add more sealant before reinstalling. -
Optional rafter attachment step: After locating and marking rafters on the roof use four (4) 1/4″ x 2-3/4” SS screws and washers to attach the DeckTrack to rafters and decking by following steps 1-5 above. The two screws in the center of the DeckTrack must be embedded into the rafter.
contact:877-732-2860
www.snapnrack.com
© 2021 by SnapNrack Solar Mounting Solutions. All rights reserved
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>