yooning G100 Thermostatic Dry Bath Incubator Temperature Control User Manual
- June 12, 2024
- yooning
Table of Contents
- yooning G100 Thermostatic Dry Bath Incubator Temperature Control
- General Information
- Important Instruction
- Important Instruction
- Brief Introduction
- Product Features
- Optional Blocks
- Operating Instructions
- Operation Guide
- Replacement of Blocks
- Troubles and Shooting
- Packing List
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
yooning G100 Thermostatic Dry Bath Incubator Temperature Control
General Information
Thank you for purchasing our Product. This Manual for users contains function and operation of the Instrument. In order to use the instrument properly, please read this manual carefully before operation.
Please check the instrument and Appendix with the packing list at the first time you open the instrument packing case.
Important Instruction
Safety Instruction
- Read this Manual carefully before using it.
- Read the guidelines and directions below to prevent injury and carry out countermeasure accordingly when necessary.
Safety
- The operation, maintenance and repair of the instrument should comply with the basic guidelines and the remarked warning below.
- The general device is CE conformity, only use it in door where ventilated well.
- Only trained person can operate this instrument. Users or person who are not permitted are not allowed to open device, which will lead electricity shock or other danger.
- Please contact factory for maintenance.If users don’t comply with them, it will have an effect on the instrument.
- For safety use, ensure the power supply with earth/ grounding socket. Make sure the voltage supplied is complied with indication on label. Exchange the power cable once it is damaged.
- Don’t place any stuff on the power cable, hold the plug head properly when pulling the cable off from the socket.
- The metal heated block can reach a high temperature during heating, probably leads to sample/liquid boiled out of tubes, which may cause injury, so it is forbidden to touch metal block by any part of your body during heating procedure.
- Power off when you finish your work. Pull off the connector plug when there’s long time no use of the Instrument and cover it with a cloth or plastic paper to prevent from dust.
- Pull the connector plug from the jack at once in the following case, and contact the vendor:
- There is some liquid flowing into the Instrument
- Drenched or fire burned
- Abnormal operation: such as abnormal sound or smell
- Instrument dropping or outer shell damaged
- The function has obviously changed
Maintenance
- The wells in the block should be cleaned by the dust-free cloth with alcohol to assure no pollution and good thermal conductivity between the wells and the tubes.
- Please clean the stained instrument with a dust-free cloth.
- Switch off and unplug power cord when cleaning/ disinfecting. Don’t allow any liquids or or detergent penetrate to the well. Don’t use any corrosive detergent to clean outside of equipment.
Important Instruction
Safety Instruction
Read this Manual carefully before using it. Read the guidelines and directions below to prevent injury and carry out countermeasure accordingly when necessary.
Safety
- The operation, maintenance and repair of the instrument should comply with the basic guidelines and the remarked warning below. If users don’t comply with them, it will have an effect on the instrument.
- The general device is CE conformity, only use it indoors where ventilated well. Only trained person can operate this instrument. Users or person who are not permitted are not allowed to open the device, which will lead to electric shock or other danger. Please contact the factory for maintenance.
- For safety use, ensure the power supply with earth/ grounding socket. Make sure the voltage supplied is compliant with the indication on the label. Exchange the power cable once it is damaged.
Usage Instructions
- Don’t place any stuff on the power cable, hold the plug head properly when pulling the cable off from the socket.
- The metal heated block can reach a high temperature during heating, probably leading to sample/liquid boiling out of tubes, which may cause injury, so it is forbidden to touch the metal block by any part of your body during the heating procedure.
- Power off when you finish your work. Pull off the connector plug when there’s a long time no use of the Instrument and cover it with a cloth or plastic paper to prevent dust.
- Pull the connector plug from the jack at once in the following cases, and contact the vendor
- There is some liquid flowing into the Instrument
- Drenched or fire burned
- Abnormal operation: such as abnormal sound or smell
- Instrument dropping or outer shell damaged
- The function has obviously change
Brief Introduction
G100 dry bath incubator is a microcomputer-controlled device, which can be widely used in sample preservation and reaction, DNA amplification and electrophoresis pre-denaturation, serum coagulation, etc.
Features
- LED display with timer and temperature;
- Display real-time temperature and thermostatic countdown time ;3 The Blocks protect the samples from contamination;
- Blocks are easy to replace for cleaning and sterilization ;
- Built-in over-temperature protection device for more reliable use ;6 Temperature deviation calibration ;
- Buzzer will alarm after the operation is over
Product Features
- Working Condition
- Ambient temperature: 5℃~35℃;
- The relative humidity: ≤70%
- Voltage:AC100-120V/200-240V,50/60Hz
Basic Parameter
Model
| ****
G100
---|---
Temperature Range| R.T.+5℃~105℃
Heating up rate| ≤10min (20℃ to 105℃)
Temperature Control Accuracy| ±0.3℃
Temperature Control
Discrepancy@40℃
| ±0.3℃
Temperature Control
Discrepancy@100℃
| ±0.3℃
Timer| 0-99h59m
Temperature Display Accuracy| 0.1℃
Max. Power| 150W
Max. Temperature| 105℃
Dimensions| 160 x 176 x 121 mm
Net Weight| 1.5Kg
Optional Blocks
Type | Diameter | Capacity | Dimension(mm) |
---|---|---|---|
C1 | 0.2ml centrifuge tubes | 96×0.2ml | Φ104.5×32 |
C2 | 0.5ml centrifuge tubes | 58×0.5ml | Φ104.5×32 |
C3 | 1.5ml centrifuge tubes | 39×1.5ml | Φ104.5×32 |
C4 | 2.0ml centrifuge tubes | 39×2.0ml | Φ104.5×32 |
C5 | 5ml centrifuge tubes | 18×5.0ml | Φ104.5×32 |
C6 | 0.5ml+1.5ml centrifuge |
tubes
| 24×0.5ml+30×1.5ml| Φ104.5×32
C7| Φ6mm| 58×6mm| Φ104.5×32
Operating Instructions
This chapter introduces mechanical structure of G100 Dry Bath Incubator, the face panel and each button’s functions and some preparations before power-on. Users should be familiar with the chapter before the thermal Shaker Incubator first use.
Structure
The Buttons
The buttons to set running time. The maximum time is 99 hours and 59 minutes.
The buttons to set temperature. The maximum temperature is 105℃.
Start/Stop buttons. After setting the temperature and time, press the button to run. Press the button again to stop running during operation.
Operation Guide
Temperature or Timer Setting
-
Turn on the power, the instrument is initialized with the sound of beep;
-
About 1S later, the displayed “28.5” is the instant temperature (the temperature of the block is 28.5 ℃). The displayed “00:35” is the last setting time (the running time is 35minutes)
-
Press the buttons or to set temperature. As shown in the right figure, 40 ℃is the last setting value, and the decimal digit flashing at the same time.
If the temperature needs to be set to 55.5℃, the operation is as follows: Press or to change the decimal value from “0” to “5”. Next press and hold , the flashing position will move to units digits, change the value from “0” to “5”. Press and hold again, the flashing position will move to tens digits, then change the value from “4” to “5”. The temperature is set to be 55.5 ℃.
If the time needs to be set to 01:20, the operation is as follows:- Press or to set. As shown in the right figure, 00:35 is the last setting time, and the rightmost digit flashing at the same time. Press to change the rightmost digit from “5” to “0”.
- Next Press and hold , the flashing position will move to third position, change the value from “3” to “2”. Press and hold again, the flashing position will move to second digit, then change the value from “0” to “1”. The time is set to be 01:20. ( 1 hour and 20 minutes).
-
Press , the newly setting values will be saved automatically and the instrument starts to run.
Notes: (1) Time is set to 00:00 means that the running time is not limited. (2) The newly setting values will successfully confirm and save when the cursor stops flashing.
Start and Stop
- Press to start up directly. Or after setting the temperature and time setting, press to run, the instrument starts heating up with the beep sound. The displayed value is instant temperature, the decimal digit flashing regularly during heating up. When the temperature is reached, it stops flashing, “:” of the time screen starts flashing and the countdown starts. When the countdown is over, the instrument stops running, the buzzer sounds an alarm, the displayed temperature is instant temperature of the block, and the displayed time is the setting value.
- After operation, press or can reset the temperature or time. Press to run with last setting values directly. During operation, press to stop. Press it again to restart running.
Temperature Calibration
The instrument is calibrated before leaving the factory. But due to some
reasons, there is a deviation between the actual temperature and display
temperature, and the temperature error can be corrected as follows:
Note:
- To ensure the accuracy of the temperature, two-point (40, 80) temperature synchronous linear calibration method was used in this instrument.
- The temperature accuracy is ≤ ±0.5 ℃after two-point temperature calibration
Notes: The temperature of the environment and block must be below 35 °C to be
calibrated.
The operation is as follows:
-
Turn on the instrument, please wait and make sure the displayed temperature below 35℃.
-
Inject paraffin oil into one of the conical well, and then put one thermometer into this well (Make sure the precision of the thermometer should be within 0.1℃ and the temperature sensing part should be absolutely immerged into the conical well).
-
Press and simultaneously to enter the Calibration interface. Then is displayed(as shown in the below figure), indicating that the temperature calibration has been started. The displayed temperature is instant temperature, and the device will automatically heat up to 40℃.
Note: To ensure the accuracy of temperature calibration, users are advised to read the measured temperature at constant temperature for 20 minutes! -
If the value of thermometer is 39.9 ℃, press or to modify the displayed temperature to 39.9 ℃, and press to confirm the value.
-
Then the program will automatically heat up to the second calibration point, and repeat the above steps at the second calibration points (80 ℃) to complete the data input.
After the calibration of the second point (80 ℃) is completed, press the
button to confirm the input value. Then the calibration is over, the
instrument can work normally after restarting.
Notes: If you want to exit temperature calibration during operation, just turn
off the power switch.
Replacement of Blocks
- Screw out the two screws that fixing the block counterclockwise with an Allen wrench
- Screw the thread of M4 handle clockwise into the hole of the block to be replaced.
- Pull up the handle and take out the block.
- Screw out the handle and fix it on the another model to be replaced , then place it on the corresponding position of the instrument and fix the newly replaced block clockwise with wrench.
Face Panel
Troubles and Shooting
No.
|
Troubles
|
Causes
|
Shootings
---|---|---|---
1
|
No signals on the display after
powers on
| No power supply| Check the connection
of power
Broken fuse| Replace the fuse
(250V 3A Ф 5×20)
Broken switch| Replace the switch
Others| Contact supplier
2
|
The actual and displayed
temperatures are quite different
| Broken sensor or bad block contact|
Contact supplier
3
|
Temperature displayed “、”with
a beeping alarm
| Broken sensor or
ambient temperature
below 0 ℃
|
Contact supplier
4
|
Block is not heated
| Broken sensor|
Contact supplier
Broken thyristor
Broken heater
5| The buttons don’t work| Broken buttons| Contact supplier
6| “ ERR1 ”is displayed| Sensor open circuit| Contact supplier
7| “ ERR2 ”is displayed| Sensor short circuit| Contact supplier
8| “ ERR3 ”is displayed| Over-temperature
alarm
|
Contact supplier
Performance Test
Item | Dry Bath Incubator |
---|---|
Model | G100 |
Date | |
No. | Content |
1 | Heating up Rate Calculagraph Temperature |
2 | Fluctuation Multipoint Detector Temperature |
3 | Range Thermometer Standards |
R.T.+5~105 | |
Results | Qualified |
4 | Basic Function Visual check |
Results | Qualified |
5 | Appearance Visual check |
Results | Qualified |
6 | Withstand Voltage Withstand 50Hz,1500V |
Results | Qualified |
7 | Earth Leakage Leakage Current Tester |
Results | Qualified |
8 | Resistance Ground Resistance Tester |
Results | Qualified |
9 | Running Test Visual check |
Results | Qualified |
Packing List
No. | Item | Model/Type | Quantity | Remarks |
---|
1
| ****
Dry Bath Incubator
| ****
G100
| ****
1
|
2
| ****
Screw
| ****
M3X10
| ****
2
| ****
With washer
3
| ****
Allen Wrench
| ****
M3
| ****
1
|
4
| ****
Handle
| ****
M4
| ****
1
|
5
| ****
Fuse
| ****
3A
| ****
2
|
6
| ****
QC PASS Card
| | ****
1
|
7
| ****
Manual
| | ****
1
|
QC: Date:
Appendix: G100 Wiring Diagram
Only for reference, no further notification in case of change
Hangzhou Yooning Instrument Co., Ltd. ]
- Address:4 floor, #6 Building, No.3 Shengang Road, Yuhang District, Hangzhou, China
- Customer Service:
- +86-571-86907383 / 87613616
- Website: www.yooning.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>