Rinnai RDV2320MN/L Direct Vent Inbuilt Gas Fireplaces Installation Guide

June 12, 2024
Rinnai

RDV2320MN/L Direct Vent Inbuilt Gas Fireplaces

Product Information

Product Name: Novo Direct Vent Inbuilt Gas Fireplaces

Models: RDV2320MN/L, RDV2320CN/L

Manufacturer: Rinnai New Zealand Limited

Address: 105 Pavilion Drive, Mangere, Auckland PO Box 53177,
Auckland Airport, Auckland 2150

Contact Information:

Product Usage Instructions

Important Safety Precautions:

  • The appliance must be installed with a Rinnai approved flue
    system.

  • Installation should comply with the manufacturer’s installation
    instructions and the following standards: AS/NZS 5601 Gas
    Installations, AS/NZS 5263 Gas Appliances General Requirements,
    AS/NZS 3000 Electrical Standards, AS/NZS 3500 Plumbing and Drainage
    Standards.

  • The appliance is suitable for use with Natural Gas or Universal
    LPG as indicated on the appliance.

  • Installation, commissioning, and servicing should be carried
    out by an authorized person, such as a licensed gasfitter in New
    Zealand.

  • Improper installation, adjustment, alteration, service, or
    maintenance can cause property damage, personal injury, or loss of
    life.

Before Installation:

  • Unpack the appliance and components and check for any damage.
    Do not install any damaged items.

  • Ensure that all components have been supplied and that you have
    the correct gas type.

  • Read the instructions thoroughly before starting the
    installation to understand the required steps. Failure to follow
    these instructions could result in serious injury or property
    damage.

Product Components:

The product includes the following components:

  • Engine
  • Stainless steel gas pipe
  • Coaxial adapter (1)
  • Brass adapter
  • Zero clearance box (1)
  • Aeration plates and screws (2)
  • Outer frame
  • Log set and granules (3)
  • IR remote
  • Operation and installation guides

Note: Some components may come pre-assembled on the fire or
supplied inside the fire.

Optional Accessories:

The following optional accessories are available:

  • Novo Inbuilt Classic Bronze Frame R2380: Designed for older
    villa-style homes, featuring a curved frame with an inset bronze
    dress guard.

  • Novo Inbuilt Mesh Frame R2370: An accessory for the Novo Black
    Standard Frame, it includes a black integrated mesh guard for
    protection against touching the hot surface of the glass.

Please refer to the installation guide and consult the
manufacturer for more detailed information and assistance.

Models: RDV2320MN/L, RDV2320CN/L
Novo direct vent inbuilt gas fireplaces Installation guide

Important

Appliance must be installed with a Rinnai approved flue system.
This appliance shall be installed in accordance with: – Manufacturer’s installation instructions

Current: – AS/NZS 5601 Gas Installations – AS/NZS 5263 Gas Appliances General Requirements – AS/NZS 3000 Electrical Standards – AS/NZS 3500 Plumbing and Drainage Standards

For use with Natural Gas or Universal LPG as indicated on the appliance.

Appliance must be installed, commissioned and serviced by an authorised person, being in New Zealand a licensed gasfitter.

Warning Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury or loss of life.

For more information about buying, using, and servicing of Rinnai appliances call: 0800 RINNAI (0800 746 624).

Rinnai New Zealand Limited 105 Pavilion Drive, Mangere, Auckland PO Box 53177, Auckland Airport, Auckland 2150

Phone: Email: Web:

(09) 257 3800 info@rinnai.co.nz rinnai.co.nz youtube.com/rinnainz facebook.com/rinnainz

Contents
Before you start …………………………………………….4 Optional accessories ……………………………………..5 Specification …………………………………………………6 Unit dimensions …………………………………………….7 Positioning ……………………………………………………8 Flooring and hearth material selection ……………..9 TV installation ……………………………………………….10 Enclosure dimensions ……………………………………11 Gas supply and connection …………………………….12 Electrical supply…………………………………………….13 Masonry installation overview………………………….14 Mock chimney installation overview …………………16 Aeration plates………………………………………………18 Installation: Fire to flange connection ……………….19 Burn media installation …………………………………..20 Commissioning ……………………………………………..22 Wi-Fi module installation (if applicable) …………….23 Frame installation ………………………………………….23 Test operation and lighting sequence ……………….24 Installation checklist and customer handover…….24 Wiring diagram ……………………………………………..25 Novo flueing………………………………………………….26 Flueing option: Masonry vertical………………………28 Flueing option: Mock chimney vertical………………29 Novo DV flue components………………………………30
Installer please note If the Wi-Fi module retrofit kit has been purchased as an accessory, it is ideal to have the homeowner present to test the Wi-Fi connectivity and correct operation of the fire.

Before you start
Unpack the appliance and components and check for damage. DO NOT install any damaged items. Check all components have been supplied, refer below, and that you have the correct gas type.
Read these instructions to get an overview of the steps required before starting the installation. Failure to follow these instructions could cause a malfunction of the appliance. This could result in serious injury and/or property damage.

Novo DV inbuilt coaxial in timber frame (mock chimney)

9 Engine

9 Stainless steel gas pipe

9 Coaxial adpater1

9 Brass adapter

9 Zero clearance box1

9 Aeration plates and screws2

9 Outer frame

9 Log set and granules3

9 IR remote

9 Operation, and installation guides

1 Comes assembled on the fire 3 Supplied inside the fire

2 Two are factory fitted on the fire, two are supplied in the accessory pack

Novo DV inbuilt colinear in masonry 9 Engine 9 Colinear adpater1 9 Masonry adapter frame1 9 Outer frame 9 IR remote

9 Stainless steel gas pipe 9 Brass adapter 9 Aeration plates and screws2 9 Log set and granules3 9 Operation, and installation guides

1 Comes assembled on the fire 3 Supplied inside the fire

2 Two are factory fitted on the fire, two are supplied in the accessory pack

Coaxial / colinear flueing Images are representative of some flueing options, components will be dependent on flue
configuration and installation.

4 | Novo DV inbuilt installation guide: 13748-D 04-22

Optional accessories
Novo Inbuilt classic bronze frame R2380
Designed to complement those older villa style homes.
The classic frame is curved and comes with a inset bronze dress guard.

Novo Inbuilt mesh frame R2370
The Novo Inbuilt black mesh frame is an accessory for the Novo black standard frame. The black integrated mesh guard can be easily installed, no fixing required. It is designed to protect against touching the hot surface of the glass1.

Novo Inbuilt masonry infill panel R2373
Black powder coated panel for masonry installations where the cavity is slightly larger than the frame. The panel will cover the gap behind the fire and the standard rectangular frame. It is not suitable for use with the classic bronze frame.

Wi-Fi module retrofit kit R7000
The Rinnai R7000 Wi-Fi board retrofit kit enables the fire to be connected to the Rinnai Fire Wi-Fi App for full thermostatic control, as well as other features such as timers. Ideally fitted at the time of installation.

1 The mesh will still get very hot–it is not a fire guard

Novo DV inbuilt installation guide: 13748-D 04-22 | 5

Specification

A direct vent (room sealed) inbuilt gas fireplace with glass front and convection fan, pushing warm air from the top of the appliance. Operated using a simple IR remote to control flame height and fan speed, or by the Rinnai Wi- Fi app (optional
accessory) that allows full thermostatic control, as well as other
features such as timers.

Input:

14-30 MJ/h

Output:

3-6.6 kW*

Efficiency: 77%

Heating area: 65-112 m2**

Gas type: NG or ULPG

  • Will vary according to gas type and flue configuration ** Will vary depending on location in NZ

Suitability
Data plate Convection fan Gas connection Ignition Installation considerations
Flue masonry Flue mock chimney Noise level Electrical
Safety devices Temperature control
Weight

Suitable for masonry installations and installations into a mock chimney in open plan areas and living rooms. As a room sealed appliance it can also be installed in larger bedrooms as long as this meets the 6.10.6.1 requirements of AS/NZS 5601.1.
Lower RHS of the base panel (in front of the gas control)

120 V AC 50 Hz 2-speed centrifugal blower
Brass ½ ” BSPT male fitting. The gas supply terminates inside the unit– lower RHS of the appliance.
230-240 V AC 50 Hz high voltage electronic spark generation

Room size, smaller rooms will heat up quickly, and due to the heat of the appliance, the fire will turn to a low setting once the set temperature has been reached.
Colinear* direct vent flexi flue, air intake Ø75 mm, exhaust Ø100 mm
Coaxial** direct vent flue, inner Ø100 mm, outer Ø170 mm.
37-45 dB(A)
A 1.5 m power cord with a thee pin plug is supplied. The power cord passes through a slot in the back left hand corner of the appliance.

High – 50 W

Standby – <3 W

Flame failure sensing system, pressure relief, overheat safety switch, air temperature sensor, thermal fuse, overcurrent fuse, and spark detection.
Operated by using the basic IR remote to control flame height and fan speed, or for more features, such as timers and thermostatic control, using Rinnai’s Wi-Fi fireplace controller app–Wi-Fi module purchased as an optional accessory.
Approx. 64 kg

  • Colinear: ** Coaxial:

Uses TWO separate flexible aluminium chimney liners as the flue system One flue, the exhaust flue is nested inside the air intake flue–these are rigid flues

Colinear

Coaxial

6 | Novo DV inbuilt installation guide: 13748-D 04-22

Unit dimensions (mm)

Coaxial in timber

Colinear in masonry

865

865

Viewable glass 530 x 294

Viewable glass 530 x 294

660 660

790

700

310 310
360

55 75 310
360

650 590

51 26.5 10
754 865

620 701 7
750

1050
Masonry infill panel
Novo DV inbuilt installation guide: 13748-D 04-22 | 7

Positioning

Combustible clearances The Novo must not be installed where curtains, furniture, or other combustible materials could come into contact with the fire while it is operating. The 400 mm side clearance, measured from the edge of the glass, includes side walls. The 1000 mm clearance is in front of the fire.
Hearths A hearth is not necessary but can be used for decorative purposes. It must not obscure the front of the fire or obstruct the fire in any way.
Flooring and hearth material selection The temperature in front of the Novo can reach up to 40 °C above ambient, which is why material selection is important. For more information refer next page.

400 mm

400 mm

1000 mm

400 mm

Floor protection
Heat radiating from the fire may affect the appearance of some materials used for flooring such as vinyl planks, carpet1, cork, or timber. To
avoid this occurring it is recommended a mat
be placed in front.

1 Carpet cannot be fitted hard up against the fire as it will affect operation.
Mantles and surrounds Combustible mantels and surrounds require clearance from the unit to minimise the risk of fire. They are allowed providing they are outside the minimum clearances shown.

A

B

C

The Novo gas fireplace is not designed to be built into bookcases.

A Mantel needs to be a min. of 400 mm away from the edge of the glass
B Max. mantel depth at 400 mm (A) is 250 mm
C Surround needs to be a minimum of 150 mm away from the edge of the glass

For every 50 mm of added mantel depth there must be an additional 100 mm of clearance from the edge of the glass. For example:

Mantel depth 300 mm 350 mm 400 mm

Vertical clearance req. (A) 500 mm 600 mm 700 mm

8 | Novo DV inbuilt installation guide: 13748-D 04-22

Flooring and hearth material selection
Flooring and hearth material selection The temperature in front of the fire (200-350 mm x 400 mm wide) can reach up to 40 °C above ambient, which is why material selection is important, some guidelines are detailed below. For example we know that vinyl planks are only rated for ambient temperatures which is why the fire would not be suitable for installation directly on the floor.

A

B c

D
non-combustible hearth

Dim. Non-combustible materials or materials rated to 60 °C or higher above ambient
A No maximum. B No minimum C No minimum
D No restriction 1 Refer floating hearth section below

Materials rated to a maximum of Unrated materials, rated up to

50 °C above ambient

20 °C above ambient

150 mm maximum1

100 mm maximum1

150 mm minimum

300 mm minimum

400 mm minimum of noncombustible material

450 mm minimum of noncombustible material

Not suitable for carpets or any heat sensitive materials

Just because a material is rated >60 °C doesn’t mean it will not deteriorate when exposed to heat cycles. Always refer to the materials supplier for suitability. The temperatures given are assuming the fire is operating in a room temperature of no more than 25 °C. Operation in higher ambient temperatures may result in higher surface temperatures. Non-combustible materials should be made of a heat resistant material.

Floating hearth – low rated and unrated flooring materials For unrated flooring materials, if you use a non-combustible floating hearth, the dimensions of the
hearth, minimum depth, and minimum height, can be tweaked using the following calculations:

· Min. hearth depth (A) · Min. hearth height

= 4502-height of hearth (for 50 °C rated materials it will be 400) = 4502-depth of hearth (for 50 °C rated materials it will be 400)

Example If you wanted a 200 mm deep non-combustible hearth, the calculation for hearth height would be: 450 – hearth depth (A) (450-200 = 250). The non- combustible hearth height would need to be 250 mm minimum.

This would mean the floating hearth dimensions could be 200 mm deep and 250 mm high.

2 Figure obtained from in-house temperature testing

Novo DV inbuilt installation guide: 13748-D 04-22 | 9

TV installation
The Novo has a fan that distributes warm air from the top of the appliance out into the room. As warm air is dispersed outwards and not directly upwards, installation of a TV may be an option.

The general rule for television installations is that the bottom of the television should be at least 400-450 mm above the fire.
For a TV mounted directly above the fire, the mantel must be at least the depth of the TV to deflect heat away.

At least the depth of the TV

Always check with the TV manufacturer
It is up to the owner to check the TV installation with the TV manufacturer– some have warranty conditions that state a TV is not to be installed above a fireplace.

400 mm minimum

Rinnai does not accept any responsibility for damage to a TV resulting from the use of this information.

400 mm minimum

10 | Novo DV inbuilt installation guide: 13748-D 04-22

Enclosure dimensions
The Novo must be positioned within the enclosure on a level surface that allows free movement of the appliance. The enclosure must be capable of supporting 1.5 times the weight of the unit.

MASONRY
Actual size needs to be at least 200 x 200 mm for the flexi flues to fit down the chimney
W H
D

Enclosure dimensions W-width 700 mm H-height 600 mm D-depth 370 mm min.

With infill panel 700-1030 mm 600-740 mm 370 mm min.

Enclosure dimensions can be larger if using an infill panel. This is a panel for masonry installations where the
cavity is slightly larger than the frame.

MOCK CHIMNEY

Enclosure dimensions W-width 800 mm H-height 655 mm D-depth 370 mm min.
This installation has a zero clearance box (comes with the fire). The total cavity depth must also include the thickness of the external cladding as the zero clearance box front flange is set forward to allow the wall lining and flange to be flush when finished.

CORNER INSTALLATIONS

1105 mm 790 mm

1550 mm

Novo DV inbuilt installation guide: 13748-D 04-22 | 11

Gas supply and connection

Gas pipe sizing must consider the gas input to this appliance as well as all other gas appliances in the premises. The gas meter and regulator must be specified for the total gas rate. An approved sizing chart such as the one in AS/NZS 5601.1 should be used. The gas supply termination is inside the heater and enters through the rear of the appliance.

Gas supply location 1. Mark off the location for the vertical centreline of the
heater enclosure.
2. To the right of the vertical centreline, mark off the vertical and horizontal locations for the gas supply penetration.

Gas supply location
310 mm
35 mm

230 mm

Supplied gas connection

WALL Back of heater

clearaMincniem7u5mmm

The length of the gas supply termination is measured from the front of the enclosure.

Installer to terminate to suit and
fit supplied gas connection. Leak test joint between the flexible gas connection and termination.

Gas connection Firmly grasp the stainless steel flexi pipe and bend to line up with the gas control valve inlet, then attach the pipe to the gas control valve and tighten.

The use of a rubber hose for any gas connection to a fixed appliance is NOT IMPORTANT authorised by the manufacturer
12 | Novo DV inbuilt installation guide: 13748-D 04-22

Electrical supply
The Novo is supplied with a power cord (length 1500 mm) and a 3-pin plug. The standard electrical connection passes through the rear panel, but can also pass through the left or right hand side of the unit by removing the knockout tab from the bottom edge of the front panel. If changing the electrical position use the rubber grommet from the rear of the appliance for cable protection. The connection is either direct wired* or connected to a power point within the cavity. This must be connected to a dedicated 240 V, 10 A earthed power point. The electric isolation switch must be accessible after the appliance has been installed. The heater must not be located immediately below a socket outlet (potential fire hazard). The power cord is not fire rated and should not come into contact with the unit. If the power cord is damaged, it must be replaced by a licensed tradesperson. This must be a genuine replacement part available from Rinnai.
Using an existing externally mounted power point If you already have an existing power point outside the enclosure, you can redirect the power cord through the LHS or RHS of the front panel. With the frame removed redirect the cord and plug (with the grommet), underneath the unit and to the front (left or right). Remove the pre-punched metal knock-out located in the lower left or right edge of the frame, ensuring the grommet is fitted to the metal knock- out. Excess cord may be left in the cavity below the unit–DO NOT coil excess cord.

  • Consult a qualified electrician if direct wiring is required as it must comply with AS/NZS 5601 and AS/NZS 3000 and other relevant local regulations
    Novo DV inbuilt installation guide: 13748-D 04-22 | 13

Masonry installation overview
1. Modify the enclosure: Ensure the enclosure meets the requirements set out on p.11.
2. Gas and electrical connections: Prepare gas and electrical connections, refer p.12-13.
3. Take the masonry adapter frame and colinear flue adapter off the engine The adapter frame and flue adapter come assembled on the engine and need to be taken off.
1. Lift and remove the inner frame. 2. Remove the two screws holding the outer frame to the fire–lift and remove. 3. Disconnect the CAT5 cable from the ON/OFF button. 4. Remove the screws holding the fire to the adapter frame and slide the engine out of the box 5. Remove the four screws holding the flue adapter to the adapter frame and set aside.
4. Install the masonry adapter frame into the enclosure Fit the adapter frame into the enclosure, base must be flat and level, and the notch in the back panel to be in line with the centre of the cavity. Fix in place through two holes in the back panel.
5. Connect flexi to flue terminal and drop flexi flues down the chimney Stretch out the flexi to the required length and attach to the flue terminal using the clamps provided. Fix flue terminal in place, allow enough flue in the cavity to fix the flue adapter.
6. Connect flexi flues to the colinear flue adapter Place the flue adapter in the cavity, it can be on the floor while attaching the flues. Attach the air intake flue over the spigot, place the flue clamp over the flue and tighten. DO NOT overtighten as this will crush and damage the flue. Drill through the pre-punched holes either side of the clamp, and into the flexi flue spigot. Secure in place using the stainless steel self tapping screws provided, ensuring the connection will stop movement or dislodgement of the flue.
Slide the exhaust flue into the spigot and push down until it is clipped in place–there are barbs either side to hold it in place. Refer images on p.27.
7. Secure flue adapter to the adapter frame Lift adapter box into place and rest in support tags in the back panel. Fit to the back panel using four screws through the air inlet ports.
8. Check engine seals and determine flue length Ensure the rubber seals fitted to the back of the fire are in place. Also determine flue length and aeration plate configuration, refer p.18.
9. Slide engine into the cavity Slide fire into the cavity until the front flange of the fire is sitting flush against the flanges of the support panels. When properly aligned the red exhaust seal goes straight into the hole, and the four holes of the adapter frame and engine line up. Fix the fire to the adapter frame (four inner screws) and use the outer slots to fix the fire to the enclosure.
Once the fire has been screwed to the adapter frame, the front face of the frame and the front flange of the fire should be pulled up hard against each other. There are witness holes in the front flange of the fire to ensure this happens, refer image on p.19.
It is critical to ensure that the air and flue seals are correctly compressed. If there is a gap WARNING present, there may not be a proper seal and performance could be affected.
10. Complete gas connection
11. Install the burn media and commission Install the burn media, refer p.20. Refit the glass and the inner and outer frames. If using an infill panel, refer separate instructions.
14 | Novo DV inbuilt installation guide: 13748-D 04-22

DO NOT use an unlined masonry chimney as the flue for this appliance
Actual chimney size needs to be at least 200 x 200 mm for the two flexi flues to fit

Masonry adapter frame

Air intake

Exhaust flue

Colinear flue adapter

Aeration plate

Green air inlet seal Red exhaust seal
Novo DV inbuilt installation guide: 13748-D 04-22 | 15

Mock chimney installation overview
1. Modify the enclosure: Ensure the enclosure meets the requirements set out on p.11.
2. Gas and electrical connections: Prepare gas and electrical connections, refer p.12-13.
3. Take the zero clearance box (zcb) and coaxial flue adapter off the engine The zcb and flue adapter come assembled on the engine and need to be taken off.
1. Lift and remove the inner frame. 2. Remove the two screws holding the outer frame to the fire–lift and remove. 3. Disconnect the CAT5 cable from the ON/OFF button. 4. Remove the screws holding the fire to the zcb and slide the engine out of the box 5. Remove the four screws holding the flue adapter to the zcb and set aside.
4. Install the zcb into the enclosure Fit the zcb. The base must be flat and level. Front flange to be set forward to allow the wall lining and flange to be flush when finished. Fit the zero clearance box to the framing on the side and top, use packers to ensure the screws do not deform the panels of the zcb.
5. Install the coaxial flue adapter Slide the flue adapter up and in place using the support tags on the back of the zcb. Fix in place using four screws through the air inlet ports.
6. Install flue system: Install coxial flue system. Ensure it is self supported.
7. Connect flue to flue adapter Slide the flue into the spigot of the flue adapter and push down until it is clipped in place.
8. Check engine seals and determine flue length Ensure the rubber seals fitted to the back of the fire are in place. Also determine flue length and aeration plate configuration, refer p.18.
9. Slide engine into the cavity Slide fire into the cavity until the front flange of the fire is sitting flush against the flange of the zcb. When properly aligned the red exhaust seal goes straight into the hole, and the four holes of the coaxial adapter and engine line up. Fix the fire to the zcb (four inner screws) and use the outer slots to fix the fire to the enclosure.
Once the fire has been screwed to the zero clearance box, the front face of the frame and the front flange of the fire should be pulled up hard against each other. There are witness holes in the front flange of the fire to ensure this happens, refer image on p.19.
It is critical to ensure that the air and flue seals are correctly compressed. If there is a gap present, there may not be a proper seal and performance could be affected.
WARNING
10. Complete gas connection
11. Install the burn media and commission Install the burn media, refer p.20. Refit the glass and the inner and outer frames.
16 | Novo DV inbuilt installation guide: 13748-D 04-22

Mock chimney enclosure

Novo DV with zcb and adapter removed

Zero clearance box installed
Aeration plate

Zero clearance box and coaxial flue adapter
Zero clearance box Coaxial flue adapter

Red exhaust seal Novo DV inbuilt installation guide: 13748-D 04-22 | 17

Aeration plates
The Novo has an aeration plate factory fitted either side of the unit, refer photo. The plates are fitted in a position for flue lengths between 3-5.5 m. Two additional plates are supplied in the accessory pack, these are for flues between 5.6-8 m.
To control flame lift and efficiency on long flues (anything over 3 m) it’s important the aeration plates are configured correctly–refer chart below.

Aeration plate configuration

Vertical flue height < 3 m

Action required

Remove factory fitted aeration plates

3-5.5 m No action required

5.6-8 m
Fit additional plates supplied in accessory pack

To maintain balance within the combustion chamber, it is important to fit the plates equally to both sides. The chart shows the plates required for any given flue length. Fitting more plates than shown may have a detrimental effect on startup performance, especially in very cold areas.

18 | Novo DV inbuilt installation guide: 13748-D 04-22

Installation: Fire to flange connection
The below installation step is common to masonry and mock installations. IT IS CRITICAL to the safe operation of the fire. Once the fire has been screwed to the zero clearance box or masonry adapter frame, the front face of the frame and the front flange of the fire should be pulled up hard against each other. There are witness holes in the front flange of the fire to ensure this happens.
It is critical to ensure that the air and flue seals are correctly compressed. If there is a gap present, there may not be a proper seal and performance could be affected.
WARNING
Fixing check markers
Novo DV inbuilt installation guide: 13748-D 04-22 | 19

Burn media installation
The granule pack and log set, consisting of five logs, comes packaged inside the appliance. Use extreme care when handling the logs, they are fragile and will damage easily. The unit must never be used with broken logs or other burn media.
Experience has shown that the majority of performance problems are caused by burn media being installed incorrectly. Incorrect placement can create carbon build-up and affect performance. Please take the time to read and follow these instructions as malfunctioning due to incorrect placement is not covered by warranty.
The granules as well as being added to create a more realistic log effect (they diffuse the gas flames) also assist in soot prevention and are CRITICAL to the correct operation of the fire. Never pour the granules directly from the pack as dust particles and the granules may block the burner ports.
Place 31 granules around the burner ports (not directly over) as shown below. You will have granules left over.

x 7

x 8

x 9

x 7

Ensure the left hand log is sitting on top of the two support brackets and NOT directly on the burner.

20 | Novo DV inbuilt installation guide: 13748-D 04-22

Ensure the left hand log is pushed hard against the left and rear ceramic panels.
DO NOT place the granules directly in front of the pilot flame If there are some abnormally long streaky flames, then readjust the granule position around the burner holes until the flames have improved.
Novo DV inbuilt installation guide: 13748-D 04-22 | 21

Commissioning
The gas pressures must be checked against those printed on the data plate of the appliance. The pressures are factory set and may not require adjustment. When checking the operating pressures the combustion chamber glass must be on.
The commissioning sheet is located in a plastic pouch inside the unit on top of the PCB cover. Follow the commissioning instructions to complete the gas pressure checks. When commissioning is complete check for full and correct operation of the appliance, and return the commissioning sheet to its plastic pouch.
Inlet pressure test point screw
Pilot pressure adjustment screw
Pilot pressure test point screw Main burner pressure test point screw
As per AS/NZS 5601.1: E7 TESTING A CONNECTION MADE AFTER A TEST PROCEDURE Any connection made after a test has been completed shall be checked for leakage at operating pressure. A suitable leak detection solution or other suitable leakage detection method shall be used and the connection left gastight.
22 | Novo DV inbuilt installation guide: 13748-D 04-22

Wi-Fi module installation (if applicable)

If the Wi-Fi module retrofit kit has been purchased as an accessory, complete the installation using the instructions provided in the kit. Once installation has been completed check, when the power is
on, that the Wi-Fi LED flashes and turns a solid red. This indicates everything is ready for setup via a smart device. Go through the app sequence with the homeowner.

If unable to connect, the Wi-Fi board must be reset.

The reset button is a small hole in the base of the

board, underneath the LED. Using a paper clip

or similar, press and hold the reset button for 10

1

seconds.
2

1. Wi-Fi LED 2. Wi-Fi module reset hole position

Frame installation
Before installing the frame make sure the ON/OFF button on the PCB control panel (B) is in the OFF position, otherwise the button on the frame will not work.
IMPORTANT
1. Ensure the CAT5 cable (A) is installed into the ON/OFF button on the frame and clipped in place in the front of the fire.
2. Fit the frame over the top flange of the fire. 3. Fix the frame to the fire using the two supplied black M4 screws. It is CRITICAL to the safe
operation of the fire that these screws are in place (seals the fire). 4. Fit the inner frame to the fire by setting it into the allocated slot of the outer frame and sliding it
down. 5. On the PCB control panel (B), return the button to the ON position. Check the operation of the
ON/OFF button on the frame and that the remote control is working.
1 2

4 3
A

B
3

Novo DV inbuilt installation guide: 13748-D 04-22 | 23

Test operation and lighting sequence

It may take approximately two hours of operation for the burn media to achieve their full flame pattern and glow. During the initial burning in period, some smoke and smell may be experienced. The appliance should run on the high setting in a well ventilated room until these dissipate. It is important to check the flame pattern during this time.

Abnormal flame pattern Abnormal flame performance and/or pattern can indicate a problem with your fire, such as blocked gas injectors, or that the burn media has shifted. There are some warning signs that could indicate a problem.
– Unusual smell from the appliance
– Continued difficulty or delay in establishing a flame
– Flame appears either very short or very long
– Flame only burns part way across the burner
– Severe soot building up on the inside of the glass
Important It is the responsibility of the installer to check that under normal conditions of the appliance, all flue gases are exhausted to the outside atmosphere, and that there is no spillage of combustion gases into the room.
If the appliance cannot be made to perform correctly please contact Rinnai.

Normal flame pattern Abnormal flame pattern
Soot build up

Installation checklist and customer handover
Complete the installation checklist in the customer operation guide, and make sure you leave the guide with the customer. Take the time to explain to the customer about the use and care of the unit, and that they understand the instructions.
24 | Novo DV inbuilt installation guide: 13748-D 04-22

Wiring diagram (part of commissioning)

gr/y gr/y

gr/y

1 br 2 bl

N

ER

gy

or

w w

bl

r

1 2 345678
SP

Light Only for

RDV600-700 L

r

2

bl

1

bk

br 2

4

bl 1

3

w

r bl

bl

1 2 1 2 3

1 2 3 4 5 6 7 8 9

gr/y

HI bl 2

COM w 1

MED y

3

LO

r

4

FM

pl

1 2

gy 3

6

TR

or 2 y1

5

or

p w

bl w w y y w

POV

SV 3 SV 2 SV 1

13 12 11 10 9 8 7 6 5 4 3 2 1

12 11 10 9 8 7 6 5 4 3 2 1 3 2 1

r bl

bl

bl r

FR2 FR1

CONTROL DISPLAY UNIT

43 21

TF
w
w

w w bk bk

OH.TH1

R.TH

ON
ON/OFF DISPLAY UNIT
WIRING DIAGRAM UNI CONTROL RIB23, RDV23 Issue A
Novo DV inbuilt installation guide: 13748-D 04-22 | 25

Novo flueing
Every gas fire requires a flue system that will draw effectively and clear flue products safely under all potential wind and climatic conditions. It is the responsibility of the installer to ensure the appliance is provided with an effective flue.
Some guidelines to assist with flue design are detailed in this guide. These must be read and modified as necessary depending on the installation. The Novo must be installed with an approved flue system, approved components are shown in this guide.

General flueing guidelines
Flueing for the Novo, depending on the installation:
· Mock chimney coaxial flueing
· Masonry colinear flueing Flexible aluminium flues that come straight off the fire.
Self-supporting flue – mock chimney The weight of the flue system should not be supported by the appliance–it should be selfsupporting.
Supporting the flue is usually completed during the framing stage with flue supports or straps within the cavity. Wall straps have been included in the Rinnai coaxial vertical flue kit. Elbow straps are also available as a separate component to prevent excess weight on the flue elbow (if used).
Flue terminal locations Flue terminals must be compliant with the flue terminal locations shown in AS/NZS 5601.1.
The flue cannot terminate under a floor or in a roof space.

Coaxial flue 25 mm from the outer flue to a combustible surface to allow for expansion and contraction of the outer flue components.
the

26 | Novo DV inbuilt installation guide: 13748-D 04-22

Flue cowl clearance To ensure products of combustion are cleared, adequate clearance from the building is required.
The flue cowl should have a 500 mm clearance from any part of the building. This also applies to steeped and pitched roofs where the flue cowl should be 500 mm clear of the ridge line.

500 mm to nearest part of roof

An adequate flow of fresh air must exist around the flue cowl following installation.

Minimum clearances are shown in AS/NS 5601.1

Shared flues Gas appliances must not be connected to a chimney or flue serving a separate flue burning appliance.
Flashings Flashings are not included in the flue kits. Flashings must comply with E2, this is the responsibility of the installer.

Attaching the masonry colinear flexi flues to the flue adaptor box The flexi flues need to be securely fixed to the colinear flue adapter.

· Air intake flue (smaller flue LHS) Attach the air intake flue over the spigot, place the clamp over the flue and tighten. Do NOT over tighten as this will crush and damage the flue. Drill through the pre-punched holes either side of the clamp, and into the spigot on the flue adaptor. Secure in place using the stainless self taping screws provided, ensuring the connection will stop movement or dislodgement of
the flue.

· Exhaust flue (larger flue RHS) Slide the exhaust flue into the spigot and push down until it is clipped in place–there are barbs
either side to hold it in place.

Novo DV inbuilt installation guide: 13748-D 04-22 | 27

Min. 3 m, max. 8 m (with extension kit)

Flueing option: Masonry vertical Colinear flexi flues with Duravent cowl
Masonry vertical flexi flue kit 5.5 m DV For installations in a masonry fireplace. Extends out to 5.5 m. If longer flueing is required then the colinear flexi flue extension kit needs to be ordered. Kit includes: · aluminium colinear roof cowl DV · chimney plate 455 x 455 mm · intake flexi Ø75 mm (LHS) · exhaust flexi Ø100 mm (RHS) · 2 x Ø75 mm flue clamps stainless steel · 2 x Ø100 mm flue clamps stainless steel
R3656
Masonry vertical flexi flue ext kit 2.5 m When flueing needs to extend beyond 5.5 m. Kit includes: · intake flexi Ø75 mm (LHS) · exhaust flexi Ø100 mm (RHS) · 2 x joiners · 2 x 75 mm flue clamps stainless steel · 2 x 100 mm flue clamps stainless steel
R3657
High wind areas If located in a particularly windy areas such as Wellington, coastal properties, or elevated properties on hills etc., then a DV high wind vertical cowl protection kit (R3655) is recommended. It is designed to wrap around the vertical flue cowl to reduce wind entering the flue and causing flame disturbances. Refer p.31 for more information.
28 | Novo DV inbuilt installation guide: 13748-D 04-22

590

Min. 3 m / max. 8 m Min. 3 m / max. 8 m

Flueing option: Mock chimney vertical Coaxial flue with Duravent cowl
Max. 2m
Straight vertical flueing If doing a short vertical flue (no bends) for a single storey dwelling, the mock chimney vertical flue kit 3.6 m (R3665) can be used otherwise the flue components can be ordered separately.
Flue pipe(s) or flue extension. Roof cowl (R3651) Flue elbow 45 ° (R3642), maximum number of bends is two. High wind areas
If located in a particularly windy areas such as Wellington, coastal properties, or elevated properties on hills etc., then a DV high wind vertical cowl protection kit (R3655) is recommended. It is designed to wrap around the vertical flue cowl to reduce wind entering the flue and causing flame disturbances. Refer p.31 for more information.
Novo DV inbuilt installation guide: 13748-D 04-22 | 29

Novo DV flue components

Coaxial vertical flue kit 3.6 m Kit includes: · Coaxial vertical roof cowl
(R3651)
· 3 x 1200 mm interlocking flue pipes (R3636)
· 2 x wall straps (R3647)
If longer flueing is required order additional lengths of flue pipe.

Flue pipe extensions 75-175 mm: R3638 75-360 mm: R3639
Used for extended straight lengths of flue. Available in two lengths–extending to 175 mm or 360 mm. CANNOT be cut to size.
Inner: Aluminium Ø100 mm Outer: Galv. steel Ø170 mm

Coaxial 45° flue elbows Two bends in a kit.
Offsets obstructions. Elbow swivels 360° at base. Angle not adjustable. Once joined effective length reduces 35 mm to approx. 73 mm.
Inner: Aluminium Ø100 mm Outer: Galv. steel Ø170 mm
108

108

R3642

R3665
Coaxial vertical flue cowl Aluminium flue terminal required for all coaxial vertical flue installations–part of vertical flue kit.
Ø268 mm

Coaxial flue pipes DV Interlocking. CANNOT be cut to size.
Once joined nominal length reduces approximately 35 mm.

· Inner: · Outer:

Aluminium (Ø100 mm) Galvanised steel (Ø170 mm)

Pipe

Installed length

150 mm 114 mm

230 mm 191 mm

300 mm 267 mm

450 mm 419 mm

600 mm 572 mm

900 mm 876 mm

1200 mm 1181 mm

Code
R3630 R3631 R3632 R3633 R3634 R3635 R3636

245.6 mm 325.6 mm

R3651
30 | Novo DV inbuilt installation guide: 13748-D 04-22

Wall strap DV Adjustable strap used in installations to add lateral support to the flue. Provides a 50-200 mm clearance to combustibles.
R3647
Elbow flue strap DV Flue supports for elbows and offsets. Strap length approximately 432 mm.

High wind vertical cowl protection kit For windy areas such as Wellington, coastal properties, or elevated properties on hills. Designed to wrap around the vertical cowl (as pictured) to reduce wind entering the flue and causing disturbances. it is fitted to the cowl and can be retrofitted.
Construction – stainless steel

R3644

R3655

45° bend offset / rise dimensions

Offset

Installed rise

Flue pipe (length and code) None (bend to bend) N/A

Offset 124 mm

150 mm

R3630 203 mm

230 mm

R3631 257 mm

300 mm

R3632 311 mm

450 mm

R3633 417 mm

600 mm

R3634 524 mm

900 mm

R3635 737 mm

1200 mm

R3636 949 mm

Installed rise 288 mm 369 mm 423 mm 477 mm 584 mm 692 mm 908 mm 1123 mm

Novo DV inbuilt installation guide: 13748-D 04-22 | 31

Rinnai.co.nz
Tel: 0800 746 624 http://www.youtube.com/rinnainz http://facebook.com.rinnainz

Novo DV inbuilt installation guide 13748-D