Vieser 51206 Casting Lifting Ring Instruction Manual

June 12, 2024
vieser

Vieser 51206 Casting Lifting Ring

Vieser-51206-Casting-Lifting-Ring-product

Product Information

The product is a Vieser clamping ring used for waterproofing and drainage in bathrooms. The clamping ring has a diameter range of 15-48 mm and is designed to be used with a waterproofing membrane to prevent water leakage. It is recommended to use MS Polymer adhesive for fixing the clamping ring.

Product Usage Instructions

  1. Clean the area around the clamping ring.
  2. Apply a waterproofing membrane over the slukmansjetten (drainage pipe).
  3. Apply MS Polymer adhesive on the clamping ring as shown in the figure (30-mm beads of adhesive with a spacing of 30 mm).
  4. Place the clamping ring over the drainage pipe.
  5. Place the distance ring on top of the clamping ring.
  6. Allow the adhesive to cure according to the manufacturer’s instructions.

Note:
The clamping ring has a diameter range of 15-48 mm. Ensure that the diameter of the drainage pipe falls within this range. Also, make sure to follow the manufacturer’s instructions for curing time of the adhesive.

Dimension

Vieser-51206-Casting-Lifting-Ring-fig- \(1\)

Installation Instructions

  1. Make sure that the floor drain seal is in place.

  2. Apply waterproofing membrane around the floor drain.

  3. Place the waterproofing flange on top of the floor drain.

  4. Fit the clamping ring all the way to the bottom.Vieser-51206-Casting-Lifting-Ring-fig- \(5\)

  5. Apply waterproofing membrane over the waterproofing flange.

  6. Clean the clamping ring.
    Apply adhesive (MS POLYMER) on the clamping ring as shown in the figure (30-mm beads of adhesive with a spacing of 30 mm).Vieser-51206-Casting-Lifting-
Ring-fig- \(7\)

  7. Measure and cut the distance ring to the correct height.Vieser-51206-Casting-Lifting-Ring-fig- \(8\)

  8. Place the distance ring on top of the clamping ring. Allow the adhesive to cure according to the manufacturer’s instructions.

  9. Pour the floor and allow the floor to cure.

  10. Remove the pouring protector.

  11. Install the grating (sold separately).

Vieser Oy | vieser@vieser.fi | +358 20 746 4400 | www.vieser.fi | www.vieser.se | www.vieser.no.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals