Riley Hopkins RileyCure Table Top Conveyor Dryer Instruction Manual
- October 30, 2023
- Riley Hopkins
Table of Contents
- IMPORTANT INSTRUCTIONS:
- TOOLS REQUIRED:
- What’s in the box
- 10-32 x 1/2L SCREW| 4| 11
- 6-20 x 3/8L SCREW| 36| 14
- CONTROLS OVERVIEW
- RECOMMENDED INITIAL START-UP PROCEDURE:
- CONTROL PANEL MAINTENANCE:
- MANUFACTURER’S WARRANTY
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
RileyCure Table Top Conveyor Dryer
Instruction Manual Assembly Instructions
RILEY HOPKINS TABLE TOP CONVEYOR DRYER
IMPORTANT INSTRUCTIONS:
Read all these instructions before installing or using this equipment. Verify
that the proper tools, materials, and personnel are available for the safe and
successful use of the dryer.
BBC Industries, Inc. is interested in the safe operation of its equipment. All
wiring to this equipment must be connected to the electrical source in strict
accordance with National Electrical Code (N. E. C.) and local codes having
jurisdiction.
Do not use extension cords to power this equipment.
Before installing this equipment, the user must be aware of the safety
requirements as specified by the National Fire Protection Association (NFPA).
CAUTION
Puncture of the element face may result in a shock hazard.
- This heater is hot when in use. To avoid burns, do not let bare skin touch hot surfaces. Keep combustible materials, such as furniture, pillows, bedding, papers, clothes, etc., away from the dryer.
- Extreme caution is necessary when any dryer is used by or near children or invalids and whenever the heater is left operating and unattended.
- Do not operate any heater after it malfunctions. Disconnect power at service panel and have heater inspected by a reputable electrician before reusing.
- Do not use outdoors.
- To disconnect the dryer, turn off the power to the dryer circuit at the main disconnect panel.
- Do not insert or allow foreign objects to enter any ventilation opening as this may cause an electric shock or fire, or damage to the dryer.
- A dryer has hot and arcing or sparking parts inside. Do not use it in areas where gasoline, paint, or flammable vapors or liquids are used or stored.
- Use this dryer only as described in this manual. Any other use not recommended by the manufacturer may cause fire, electric shock, or injury to persons.
RETAIN THIS MANUAL FOR FUTURE REFERENCE
Please review all these instructions prior to assembly.
The RileyCure Table Top is packaged in four cartons for shipment.
Please make sure all pieces have been received before attempting assembly.
TOOLS REQUIRED:
- (x1) 1/2” wrench
- (x1) 7/16” wrench
- (x1) Phillips screwdriver
- (x1) Needle-nose pliers
Power Requirements
WATTS | VOLTS | AMPS | FREQUENCY | PHASE | PLUG |
---|---|---|---|---|---|
1462 | 120 | 12.18 | 50/60 HZ | 1 | NEMA 5-15P |
/// WARNING ///
DO NOT plug the equipment in (or apply power) until instructed to do so.
Any attempt to operate the RileyCure Table Top without the cord/plug provided
by the manufacturer will void the warranty.
Unpack, identify, and inspect all parts. Report any missing or damaged items.
What’s in the box
IMAGE | DESCRIPTION | QTY. | ITEM # |
---|
| MB21-002 (LEFT)
CONVEYOR RAIL – TAKEUP| 1| 1
MB21-002 (RIGHT)
CONVEYOR RAIL – TAKEUP| 1| 2
MB21-003 (LEFT)
CONVEYOR RAIL – MOTOR| 1| 3
MB21-003 (RIGHT)
CONVEYOR RAIL – DRIVE| 1| 4
22-141
BUMPER/FOOT| 4| 5
| MB21-005
SPLICE CHANNEL| 2| 6
25-025
5/16-18 BOLT| 24| 7
MB21-022
TAKEUP ROLLER ASSEMBLY| 1| 8
MB21-023
DRIVE ROLLER ASSEMBLY| 1| 9
08-252-MB
GEARMOTOR| 1| 10
25-176
10-32 x 1/2L SCREW| 4| 11
| 18-119
DRIVE CHAIN| 1| 12
AIR-229
CHAIN COVER| 1| 13
25-001
6-20 x 3/8L SCREW| 36| 14
MB21-006
FLOOR PAN| 2| 15
1804-300
CONVERYOR BELT| 1| 16
| 22-057
ROUTING CLIP| 2| 17
MB21-014
INNER SIDE PANEL| 2| 18
MB21-015
INNER ENTRY/EXIT| 2| 19
MB21-018
OUTER SIDE PANEL – CP| 1| 20
MB21-025
CONTROL PANEL| 1| 21
MB21-017
OUTER SIDE PANEL| 1| 22
| MB21-020
CHAMBER END CAP| 2| 23
MB21-024
HEATER ASSY| 1| 24
MB21-016
INNER CHAMBER COVER| 1| 25
22-093
4” START COLLAR| 1| 26
MB21-019
CHAMBER COVER| 1| 27
MB21-021GRN
CHAMBER CURTAIN – GREEN| 2| 28
STEP 1
-
Locate the four painted Conveyor Rails (ITEM 1, 2, 3, & 4) from BOX 1 and the four rubber Bumper/Feet (ITEM 5) from BOX 2.
-
Thread each Bumper foot into the threaded insert in each of the rails.
-
Locate the two unpainted Splice Channels (ITEM 6) from BOX 1.
-
Using twelve of the 5/16” x .75L black hex bolts (ITEM 7) from BOX 2, assemble the two Conveyor Rail assemblies by attaching the Conveyor Rail pieces (ITEM 1 & 3, 2 & 4) with the Splice Channel (ITEM 6), so that the Bumper/Feet face the same direction for each rail assembly.
STEP 2 -
Locate the Drive Roller Assy (ITEM 9) from BOX 1. The Drive Roller Assy has the sprocket attached.
-
Using four 5/16 x .75 Hex Bolts, attach the Drive Roller Assy to the Conveyor Rail assemblies on the end with the Motor Mounting Cutout. Attach the sprocket side to the rail with the Grommet installed. Note roller drum side out.
-
Locate the Takeup Roller Assy (ITEM 8) in BOX 1.
-
Using four 5/16 x .75 Hex Bolts, attach the Takeup Roller Assy to assembled Conveyor Rail aligning its TruTrack™ Belt guide with the guide on the Drive Roller Assy. Note roller drum side out. Tighten the bolts only finger tight. (The position of this roller will be adjusted later in these instructions.)
-
Locate the Drive Gearmotor (ITEM 10) from BOX 3 and the four #10-32 x ½” Machine Screws (ITEM 11) from BOX 2.
-
Mount the Drive Gearmotor through the mounting slots on the Conveyor Drive Rail with the Sprocket side toward the roller, as shown in the figure.
-
Thread the four #10-32 Machine Screws into the threaded bosses in the Gearmotor. Do not fully tighten.
-
Slide the Gearmotor in the slots towards the Conveyor Drive Roller.
STEP 3 -
Locate the Roller Chain (ITEM 12) from BOX 2.
-
Seat the Chain around both sprockets. Slide the Gearmotor to remove most of the slack from the chain. Allow a small about of slack in the chain per the figure. A tight chain will have a reduced life.
-
Tighten the four Machine Screws.
-
Locate the Chain Cover (ITEM 13) and two #6 x 3/8” Sheet Metal Screws (ITEM 14) from BOX 2.
-
Fit the Chain Cover over the sprockets and chain. Secure with the two Sheet Metal Screws into the pilot holes in the top and bottom of the Conveyor Rail.
-
Insert the Gearmotor cord through the grommet in the Conveyor Rail.
-
Locate the two Floor Pans (ITEM 15) from BOX 2.
-
Place the first Floor Pan on the lower flanges of the Splice Channel (ITEM 4) of the Conveyor Rail assembly with the flanges down and towards the Rollers.
-
Center the Floor Pan between the Conveyor Rails.
-
Insert the second Floor Pan (flanges down) between the upper flange of the Splice Channel and the flange of the Conveyor Rail assembly.
-
Center the Floor Pan between the Conveyor Rails.
STEP 4 -
Locate the Conveyor Belt from BOX 3 (ITEM 16).
-
Locate and remove the pin from the teeth at one of the ends of the Conveyor Belt. Do not discard or bend the pin.
-
Route the Conveyor Belt around both Conveyor Rollers atop both Floor Pans with the rubber Trutrak™ edge guide aligned with the guide slots in the Rollers.
-
Mesh the teeth of the alligator splice. Check to see that the edges of the Belt are best aligned then reinsert the pin per figure. A pair of pliers may be needed to fully reinsert the pin.
-
Remove much of the slack from the Conveyor Belt by pulling the Takeup Roller Assy (ITEM 8) by hand, then tighten the 5/16” Hex Bolts. The Conveyor Belt only needs to be tight enough so as not to slip while in use. Over tightening the Conveyor Belt may lead to reduced life.
-
Locate the Routing Clip (ITEM 17) from BOX 2.
-
Wrap the Clip around the Gearmotor cord and insert it into the ¼” hole in the Conveyor Drive Motor Rail.
STEP 5 -
Locate the unpainted Inner Chamber sheet metal parts (ITEM 18 & 19) from BOX 2.
-
Using eight #6 x 3/8” Sheet Metal Screws (ITEM 14) from BOX 2, attach the two Entry/Exit panels (ITEM 19) to one of the Inner Side Panels (ITEM 18). Note the direction of Heater Support Rails and part flanges of the Side Panel per figure.
-
Attach the remaining Side Panel (ITEM 18) to the other side of the Entry/Exit Panels (ITEM 19) using eight additional #6 Sheet Metal Screws (ITEM 14).
-
Note that the Dryer Chamber is not fastened to the Conveyor.
STEP 6 -
Locate the Outer Side Panel (ITEM 20) in BOX 2. This part is without a label.
-
Locate the Control Panel Assy (ITEM 21) from BOX 3.
-
Using four 5/16 x ¾” Hex Bolts (ITEM 7), attach the Control Panel to the Side Panel.
STEP 7 -
Install the Control Panel/Side Panel assembled from the previous page to the Inner Chamber Assembly by sliding it over Inner Side Panel (ITEM 18) from above, the Gearmotor side.
-
Locate the other labeled Outer Side Panel (ITEM 22) from BOX 2.
-
Slide Panel over other Inner Side Panel.
-
Attach the Side Panels using eight #6 Sheet Metal Screws (ITEM 14).
STEP 8 -
Locate the two Chamber End Caps (ITEM 23) from BOX 2.
-
Rotate the partially assembled chamber onto its end as shown in the figure.
-
Insert one of the End Caps between the two Side Panels with the longest flange to the underside of the chamber.
-
Align the holes with the Inner Entry/Exit (ITEM 19) and attach the panel using two #6 Sheet Metal Screws (ITEM 14).
-
Repeat this assembly procedure with on remaining End Cap on the reverse side of the chamber.
STEP 9 -
Locate the Heater Assy (ITEM 24) from BOX 3.
-
Insert the Heater Assy fitting its angled flanges over the Heater Support Brackets with the terminal blocks on the Control Panel side of the Chamber.
-
The fit may be tight. Insert with the leading end of Heater Assy.
-
Insert the plug connector of the Heater Assy through the grommet in the Inner Side Panel (ITEM 18).
-
Connect the plug to the receptacle connector of the Control Panel.
STEP 10 -
Locate the Inner Chamber Cover (ITEM 25) from BOX 2.
-
Using six #6 x 3/8” Sheet Metal Screws (ITEM 14), attach the Cover over the assembled Inner Chamber.
-
Locate the 4” Duct Start Collar (ITEM 26) from BOX 2.
-
Insert the tabs of the Start collar into the hole in the Inner Chamber Cover and bend up to secure.
-
Locate the Chamber Cover (ITEM 27) from BOX 2.
-
Using eight #6 x 3/8” Sheet Metal Screws (ITEM 14), attach the Cover.
STEP 11 -
Locate the two Chamber Curtains (ITEM 28). Mount them on the Entry and Exit of the Heating Chamber at the desired height .
CONTROLS OVERVIEW
RECOMMENDED INITIAL START-UP PROCEDURE:
-
Plug the Control Panel into a suitable power source.
-
Turn Belt Speed to 5. Flip the rocker switch for Conveyor Speed to the ON position to start the conveyor.
Listen for any unusual noises. Check to see if the rubber edge guide is riding in the roller drum grooves. -
Turn the Heater Chamber Power Switch to the ON position. The green indicator light will illuminate.
Note: These are not production settings. They are intended for initial startup only.
/// caution ///
DO NOT operate Heating Chamber unless the belt is moving. Heat will damage an idle belt. -
Verify that the heating element functions. After about a minute of operation, briefly feel just inside both the entrance and exit ends of the chamber. The area should be warm.
/// caution ///
The heating element is exposed inside the chamber and is operating at very high temperatures. Keep your hand close to the moving belt (without touching it). Note: Some smoke/vapor and odor may be noticed during initial start-up due to residual material from the manufacturing process burning off the elements. -
Working temperature will be reached after a ten-minute warm-up. Conveyor speed can be determined by placing a small item, like a coin, on the conveyor belt and recording the time it takes to travel through the chamber. (For curing plastisol inks on thirts, 30 seconds through the Heater Chamber is a good initial speed to begin your evaluation.)
Note: The speed and temperature of the unit may vary slightly with fluctuations in power/voltage servicing the equipment.
Process an item through the dryer. Evaluate the completed article according to
your quality standards. If the equipment is being used for curing ink on
garments, it is recommended to wash the processed garment as the definitive
test.
The conveyor dryer is now ready for normal use and operation.
CONTROL PANEL MAINTENANCE:
Performed at initial installation, 30 days after initial installation, and 120 days after initial installation.
- Turn OFF the power to both the Heater Chamber and Conveyor. Unplug the dryer from its power source.
- After double-checking that the power is off, confirm that all electrical terminations inside of the main control panel are secure by checking the “tightness” of each termination screw (or wire nut as may be applicable) and then “tugging” on each conductor.
Routine Maintenance: Performed after the first week and every 100 hours of operation.
- The belt should be replaced if it has any tears, voids, separations, fraying, or no longer rides in the roller drum groove due to excessive wear.
- Belt tension: the belt will relax over time and tension may have to be adjusted by the instructions above.
MANUFACTURER’S WARRANTY
All products are warranted against defects in workmanship at the time of
shipment.
The obligation under the above warranty shall be limited to the repair or
replacement of any part or parts manufactured by the dryer’s manufacturer
without charge F.O.B. factory that may prove defective within 12 months from
the date of shipment, which is returned to BBC Industries, Inc.
The above warranties are the only warranties made with respect to the
equipment. There is no implied warranty of merchantability or of fitness.
EXCLUSIONS:
There is no warranty on parts not manufactured by BBC Industries, Inc.,
other than the respective manufacturer’s warranty if any.
The warranty against defects shall not extend to damage caused by any of the
following:
- Transport by carrier
- Corrosion
- Operation or use in a manner inconsistent with specifications and/or operating instructions
- Ordinary wear, accident, improper installation, or maintenance
- Alterations made to equipment in any way
The manufacturer shall not be liable for any losses or damages, including but
not limited to incidental or consequential damages, suffered or incurred
because the equipment proves to be defective either upon installation or
during its operation or use.
Shipment of defective parts to the manufacturer and the return shipment of any
repaired or replacement parts from the manufacturer shall be at the
purchaser’s/user’s expense.
TABLETOP_072022_D
Riley Hopkins® – 1-360-576-7188
– www.rileyhopkins.com
References