DOMETIC MEGA Kit User Guide
- June 4, 2024
- Dometic
Table of Contents
DOMETIC MEGA Kit User Guide
MEGA KIT LAYOUT
INSTALLATION
-
STEP 1: INSTALL BATTERIES
(EXPION3360 BATTERY USER MANUAL)
100Ah USER MANUAL
120Ah USER MANUAL -
STEP 2: INSTALL CINDER™ 40 AND ROOF CAP
CINDER™40 Integration Kit Instructions.
Roof Cap Mounting Instructions. -
STEP 3: INSTALL THE ATP SIDEWALL PORT
Side Wall Port Instructions. -
STEP 4: INSTALL ROOF PANELS
- Layout roof panels according to one of the below images.
- Install mounting feet to roof panels and mount to the roof following the instructions.
-
STEP 5: INSTALL ROOF PANELS
IMPORTANT:
Ensure that no more than 3x100w OBSIDIAN® SERIES panels per roofcap port.
400W
Follow this image for 400W install.
- A. Using the provided ATP Y-cable, connect two panels together.
- B. Run the 20ft lead from the roof cap to the ATP Y-cable output.
- C. Repeat A and B for the remaining 2 panels.
- D. Ensure your solar circuit breaker is in the “ON” position.
- E. Verify CINDER™ 40 is now charging the batteries.
600W
Follow this image for 600W install.
- A. Connect 2 ATP Y-cables to roof cap ports.
- B. Connect remaining 2 ATP Y-cable outputs to each 15ft ATP extension cable.
- C. Connect the 15ft ATP extension cables to one side of each of the roof cap Y-ports.
- D. Connect the 20ft ATP extension cable to the other side of each of the roof cap Y-cables.
- E. Connect each 20ft ATP cable directly to a panel.
- Typically these will be the furthest from the roof cap.
- F. Connect remaining 4 panels to available Y-cable inputs.
- G. Verify 3 panels per roof cap port.
- H. Ensure your solar circuit breaker is in the “ON” position.
- I. Verify CINDER™ 40 is now charging the batteries.
STEP 5: CONNECT OBSIDIAN® SERIES PORTABLE SOLAR PANELS
Portable Connection Instructions.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>