GENERAC G007006-0 Smart Management Module Owner’s Manual
Loss of life. This product is not intended to be used in a critical life
support application.
Failure to adhere to this warning could result in death or serious
injury.(000209b)
WWW.GENERAC.COM
1-888-GENERAC
(1-888-436-3722)
Para español, visit: http://www.generac.com/service-support/product-support-
lookup
Pour le français, visiter : http://www.generac.com/service-support/product-
support-lookup
SAVE THIS Owner’s/Installation Manual for SMAM NULL FOR FUTURE REFERENCE
WARNING
CANCER AND REPRODUCTIVE HARM
www.P65Warnings.ca.gov.
(000393a)
This page was intentionally left blank.
Section 1: Introduction and Safety
Introduction
Thank you for purchasing a Generac Smart Management Module (SMM). SMMs are
designed to work together to prevent the home standby generator from being
overloaded by large appliance loads. The modules require no control wires, and
provide a cost effective, quick installation. Use of up to eight modules is
available, allowing protection of your home and necessary appliances.
The information in this manual is accurate based on products produced at the
time of publication. The manufacturer reserves the right to make technical
updates, corrections, and product revisions at any time without notice.
Read This Manual Thoroughly
Consult Manual. Read and understand the
manual completely before using the product. Failure to completely understand
manual and product could result in death or serious injury. (000100a)
If any section of this manual is not understood, contact the nearest
Independent Authorized Service Dealer (IASD) or Generac Customer Service at
1-888-436-3722 (1-888-GENERAC), or
visit www.generac.com for starting, operating, and
servicing procedures. The owner is responsible for correct maintenance and
safe use of the unit.
This manual must be used in conjunction with all other supporting product
documentation supplied with the product.
SAVE THESE INSTRUCTIONS for future reference. This manual contains important
instructions that must be followed during the placement, operation, and
maintenance of the unit and its components. Always supply this manual to any
individual that will use this unit, and instruct them on how to correctly
start, operate, and stop the unit in case of emergency.
Safety Rules
The manufacturer cannot anticipate every possible circumstance that might
involve a hazard. The alerts in this manual, and on tags and decals affixed to
the unit, are not all-inclusive. If using a procedure, work method, or
operating technique that the manufacturer does not specifically recommend,
verify that it is safe for others and does not render the equipment unsafe.
Throughout this publication, and on tags and decals affixed to the unit,
DANGER, WARNING, CAUTION, and NOTE blocks are used to alert personnel to
special instructions about a particular operation that may be hazardous if
performed incorrectly or carelessly. Observe them carefully. Alert definitions
are as follows:
Indicates a hazardous situation that, if not avoided, will result in death or
serious injury. (000001)
Indicates a hazardous situation that, if not avoided, could result in death or
serious injury. (000002)
Indicates a hazardous situation that, if not avoided, could result in minor or
moderate injury. (000003)
NOTE: Notes contain additional information important to a procedure and
will be found within the regular text of this manual.
These safety alerts cannot eliminate the hazards that they indicate. Common
sense and strict compliance with the special instructions while performing the
action or service are essential to preventing accidents.
General Hazards
Electrocution. Turn utility and
emergency power supply to OFF before connecting power source and load-lines.
Failure to do so will result in death or serious injury. (000116)
Section 2: General Information and Setup
Load Management Options
Load management systems are designed to work together to prevent a generator
from being overloaded by large appliance loads. Options include:
- Smart Management Modules (SMMs)
- Smart A/C Module (SACM)–standard in single-phase 100-800 Amp RTS or RXS transfer switches.
These options can be used in conjunction or separately.
Application Considerations
The generator overload condition is determined by generator frequency. Loads
are shed when the frequency drops below a preset value for a predetermined
time.
An SMM can be used individually or in conjunction with a SACM to manage a
combined total of eight loads. SMMs operate independently when used in
conjunction with the SACM.
- Use Priorities A/C 14 on the SACM as the top priorities, then up to four SMMs as Priorities 58.
- Use only select A/C priorities on the SACM as the top priorities, then use additional SMMs as the remaining priorities.
- To reduce the loads returned to the generator all at once, it is best to set the SMM priorities to follow after the last HVAC load has returned. This allows the generator to accept loads gradually, reducing the potential for additional nuisance load shed events.
In any combination of modules, the recovery times after a loss of utility
power or shutdown due to overload are shown in Table 2-1.
NOTE: For digital thermostats where a 24 VAC thermostat wire is not
available, an SMM must be used to break the power at the HVAC load itself.
Smart Management Module (SMM)
Any 240V loads, including central air conditioners, can be managed using an
SMM. The system can accommodate up to eight individual SMMs.
NOTE: SMMs are self-contained and have individual built-in controllers.
Table 2-1. Priority Settings
Priority | Recovery Time | SACM | SMM |
---|---|---|---|
1 | 5 minutes | Yes | Yes |
2 | 5 minutes 15 seconds | Yes | Yes |
3 | 5 minutes 30 seconds | Yes | Yes |
4 | 5 minutes 45 seconds | Yes | Yes |
5 | 6 minutes | NA | Yes |
6 | 6 minutes 15 seconds | NA | Yes |
7 | 6 minutes 30 seconds | NA | Yes |
8 | 6 minutes 45 seconds | NA | Yes |
SMM and Carton Contents
Priority Dial (A) Sets module priority.
NOTE: PRIORITY MUST BE DIFFERENT for each module in an installation.
Priority sets the order in which loads recover from a load shed event.
Recovery time from a load shed event is five minutes for Priority 1. Each
priority after Priority 1 waits an additional 15 seconds after the initial
recovery time. See Table 2-1.
Lockout Switch (B ) Enables or disables lockout function. Switch
positions are LOCKOUT LOAD ON GENERATOR (enabled) and LOCKOUT DISABLED. See
Table 2-2.
NOTE: Recovery time is based on priority dial settings. See Table
2-1.
Test Button (C) - Disables contactor output for a specified time.
LED (D ) - Provides module status. See Table 2-3.
Contactor (E) - Normally CLOSED. If the generator begins to overload,
the contactor opens to take the load off generator power. The contactor also
opens to take the load off generator power. See Connections.
Mounting Holes (F) - Internal enclosure mounting holes provide clean
and sturdy mounting.
Priority Decal (G) - Provided for recording priority of each module in
installation. Install on the electrical panel.
Setting Lockout
SMMs are equipped with a lockout provision. The SMM can be set to enable
LOCKOUT mode if the load is identified as non-essential and does NOT need to
operate on backup power during generator overload. The load can be a single
electrical load or an entire subpanel of multiple branch circuits.
NOTE: LOCKOUT mode works in an overload condition, which is determined
by generator frequency. If the generator has sufficient capacity, the load
will be allowed to turn on even if the control is set to LOCKOUT mode.
See Figure 2-2. To set SMM to enable standard lockout mode, slide
lockout switch (1) to LOCKOUT LOAD ON GENERATOR.
Jumper Locations
See Figure 2-2. The SMM control board is equipped with two movable jumpers
(2). Jumper locations are indicated on the diagram:
- (3) Frequency Jumper – default for 60 Hz
- (4) Mode Selector Jumper (identified on control board as “Lock Out Jumper”) – position A is the default for most applications
NOTE: Change in a jumper (4) is only required for specific applications
and should not be moved under normal circumstances. If the unit is installed
in an area with unstable frequency power, change the lockout jumper (4) to
position B.
IMPORTANT NOTE: Jumper (3) should remain in place unless in an area with 50
Hz power.
To move a jumper:
- Remove power.
- Grasp the jumper and pull straight up until it clears the pins.
- Move the jumper to a new location and press it gently onto the pins until seated.
NOTE: To avoid bending or breaking pins, do not rock the jumper, use excessive force, or pull sideways to remove it from the SMM control board.
Table 2-2. Lockout Switch Settings
Lockout Switch Setting| Mode Selector Jumper Position|
Mode| Function
---|---|---|---
LOCKOUT LOAD ON
GENERATOR| A| Generator| Module sheds load and does not reconnect until
utility returns or overload goes away. See Setting Lockout. This setting is
considered standard for most installations.
LOCKOUT LOAD ON
GENERATOR| B| Generator| Module sheds load and does not reconnect until
utility returns or overload goes away. This setting is recommended for
installations in areas with unstable frequency power as described in Setting
Lockout.
LOCKOUT LOAD ON
GENERATOR| A or B| Utility| Power is available on module output.
LOCKOUT DISABLED| A or B| Generator| The module operates with standard load
shed logic. See Table 2-1 for more information.
LOCKOUT DISABLED| A or B| Utility| Power is available on module output.
NOTE: Duration of Return to Utility timer is longer ‘n Mode B.
Table 2-3. LED States
State | LED State | Mode | Note |
---|---|---|---|
Shed | 1-second flash | ||
(1 On — 1 Off) | Generator | Module detected an overload and shed its load. This |
state only occurs in generator mode, or during a first-time utility power-up
for five minutes of initial operation.
Lockout
(30 minutes)| 3-second flash
(3 On — 3 Off)| Generator| Module detected an overload while trying to recover
from a shed situation. The operation is disabled for 30 minutes.
This state only occurs in generator mode.
Lockout
Switch Active| 6-second flash
(6 On — 6 Off)| Generator| Module output is disabled and there is no power to
the appliance while in generator mode and the generator is overloaded. The
lockout switch must be ON. See Table 2-2.
Lockout
Switch Active| ON| Utility| The lockout switch operates in generator mode
only. It has no function in utility mode. LED is solid, indicating the load is
connected. The lockout switch must be ON. See Table 2-2.
Normal| ON| Generator or
Utility| This indicates the appliance has power. This is the default in
utility mode. It is the normal operating state in generator mode when an
overload is not detected.
Test| 1-second flash| Generator or
Utility| Test button triggers a typical shed condition and overrides all other
states except generator lockout switch ACTIVE state.
NOTE: Actual test time varies depending on SMM priority setting. Use the
following formula to calculate test time:
Time = (P-1) x 15 seconds, where P represents priority setting.
Example: SMM Priority 6 test time = (6-1) x 15 seconds, or 75 seconds.
Notes:
- Refer to the Priority Settings table for information on recovery priority times.
- If the module detects a generator overload during a load-shed recovery, the module will again shed the load for up to 30 minutes.
Section 3: Installation, Tests, & Troubleshooting
Electrical Specifications
Input Voltage | 240 VAC |
---|---|
Current Rating | 50A resistive, 40A inductive |
Locked Rotor Amp Rating | 180A |
Motor Rating | 3 HP |
Contactor Coil Voltage | 240 VAC |
Enclosure Specifications
Enclosure| Type 3R
Temperature| -22 to 122 °F (-30 to 50 °C)
Remove Contents from Carton
-
Open carton. 2. Remove and verify carton contents:
· SMM
· Priority decal
· Owner/installation manual -
Retain carton for the mounting template.
-
Contact the place of purchase with the unit model
number to report any missing carton contents. -
Record date of purchase on the front cover of this manual.
Tools Needed For Installation
- Power drill and suitable drill bit
- Phillips and flat head screwdrivers
- Mounting screws or wall anchors
- Electrical materials
- Voltmeter to indicate voltage presence
NOTE: Use the Digital Multimeter (DMM) LowZ low input impedance setting to collect accurate voltage measurements. low eliminates the possibility of inaccurate ghost voltage readings, also known as phantom voltage or stray voltage readings. See DMM manufacturer’s literature for additional information.
Mounting Instructions
Electrocution. Turn utility and
emergency power supply to OFF before connecting power source and load-lines.
Failure to do so will result in death or serious injury. (000116)
Recommended installation is near the electrical panel or appliance/load. The enclosure has a NEMA 3R rating and can be mounted indoors or outdoors. It provides a degree of protection against rain and sleet and is undamaged by the formation of ice on the enclosure.
-
Turn OFF both UTILITY (NORMAL) and EMERGENCY (STANDBY) power supplies.
-
Choose mounting location (near the electrical panel, appliance or load to be managed).
-
See Figure 3-1. Use a flat head screwdriver to remove appropriate knockouts (A) from the module enclosure for wiring.
NOTE: If the outdoor installation is chosen, bottom knock-outs must be used to meet NEMA 3R rating and protect against water ingress.
Continued on next page -
Hold SMM enclosure against the mounting surface with arrows (B) pointing up, and mark or drill four mounting holes (C). See Figure 3-2 f or mounting dimensions if necessary.
Height (in/mm)| H1| 6.17 / 156.8
---|---|---
H2| 2.36 / 60
Width (in/mm)| W1| 7.06 / 179.4
W2| 4.72 / 120
Depth (in/mm)| D1| 3.7 / 94 -
Install SMM enclosure to the mounting surface using appropriate mounting screws or wall anchors.
Connections
Electrocution. Turn utility and
emergency airpower supplies to OFF before connecting power source and load-
lines. Failure to do so will result in death or serious injury. (000116)
Legend
A| Red (240 VAC – Line)
B| Black (240 VAC – Line)
C| Red (240 VAC – Load)
D| Black (240 VAC – Load)
E| White – Neutral (as required)
F| Green – Ground (as required)
G| Black – Factory (PCB)
H| Red – Factory (PCB)
I| Blue – Factory (PCB)
J| Blue – Factory (Jumper)
-
Turn off both UTILITY (NORMAL) and EMERGENCY (STANDBY) power supplies before connecting power source and load lines to transfer switch and SMM.
NOTE: Suitable conduit fittings must be installed in knockout openings when running supply and load wires.
NOTE: Use at least 167 °F (75 °C) rated wire and gauge per installation instructions. See Table 3-1 for recommended wire size based on load current.
Table 3-1. Recommended Wire Sizes
Temperature rating of conductor: 167 °F (75 °C)Conductor types (must be copper):
RHW, THHW, THW, THWN, XHHW, USE, ZW
Size AWG| Maximum Current Rating
14| 15A
12| 20A
10| 30A
8| 50A*
- 40A for Type NM cable
2. Run line supply wires per applicable NEC code articles for wiring method selected. 3. Run load wires per applicable NEC code articles for the wiring method selected. 4. See Figure 3-3. Connect line supply wiring (A, B) to line side of SMM contactor field terminals. Tighten field terminals to 25 in-lbs (2.8 Nm). 5. 5. Connect load supply wiring (C, D) to the load side of SMM contactor field terminals.
NOTE: If neutral (E) and ground (F) wires are included, connect inside
SMM using a listed termination device.
The unit is now ready to configure, apply power, and perform testing.
Setting Priorities
High-priority 240 VAC loads should be set to the highest priorities so those
loads recover first in the event of generator overload.
NOTE: The highest priority, and first load to activate, is Priority 1.
The last load to activate is Priority 8.
Setting priority determines the timing for three scenarios:
- Order in which loads recover
- Delay time until power returns during an outage
- Delay time for post-load shed recovery
An example configuration is shown below. Configurations will vary depending on customer prioritization of loads:
Priority 1 – Baseboard heat | Priority 5 – Non-essential circuits |
---|---|
Priority 2 – Air conditioner | Priority 6 – Pool pump or hot tub |
Priority 3 – Range | Priority 7 – Other circuits |
Priority 4 – Clothes Dryer | Priority 8 – Other circuits |
- Set the priority of each SMM as desired (using the example configuration for reference).
- Apply priority decal in a suitable location on the electrical panel to record chosen priority designations.
- Record priorities on the decal.
Tests
Utility Test
- Turn utility power ON and enable all module feeding circuits.
- Verify LED begins to flash at one-second intervals.
- All contractors will close after five minutes. LED will illuminate and remain ON.
NOTE: The five-minute delay allows magnetism to dissipate from the air conditioner compressor. This allows easier starting and eliminates potential for reverse compressor operation.
Installation Summary
- Install cover on the electrical panel.
- Install covers on modules.
Troubleshooting
See Table 3-2 for troubleshooting problems, causes, and corrections.
Table 3-2. Troubleshooting
Problem | Cause | Correction |
---|---|---|
Load not powered; LED is OFF | Circuit breaker disabled. | Enable circuit |
breaker.
Load not powered; LED is OFF| Utility main line circuit breaker (MLCB)
disabled and generator OFF.| Enable utility MLCB if utility is present or
verify generator operation if outage.
Load not powered; LED flashing 1-second interval| Generator power was just
applied to the unit. Utility power was just applied to the unit. The generator
was overloaded and a shed occurred.| Wait five minutes plus the priority time
delay (see Table 2-1) for the unit to enable output.
Load not powered; LED flashing 3-second interval| This load overloaded the
generator while attempting recovery from a shed. It is in a 30 minute lockout
wait period.| Wait 30 minutes from lockout for the unit to attempt to re-apply
load.
Review all loads enabled in the household. The generator may end up in another
overload condition when this load is enabled. Disable some loads to prevent
generator overload from recurring.
Load not powered; LED flashing 6-second interval| The lockout switch is
enabled and the unit is on generator power.| During installation, it was
determined that this load will be disabled during generator operation to
prevent generator overload. Contact IASD for details.
Load not powered while on utility| Wiring or unstable frequency.| Check to
wire. See Setting Lockout for information on unstable frequency.
Generac Power Systems, Inc.
S45 W29290 Hwy. 59
Waukesha, WI 53189
1-888-GENERAC (1-888-436-3722)
www.generac.com
Part No. 10000030493 Rev. D 11/22/2019
©2019 Generac Power Systems, Inc
. All rights reserved.
Specifications are subject to change without notice.
No reproduction is allowed in any form without prior written
consent from Generac Power Systems, Inc.