CUBE 632186 Universal Carrier Instruction Manual
- June 10, 2024
- CUBE
Table of Contents
CUBE 632186 Universal Carrier
Overview
Safety Instructions
Incorrect mounting of the ACID universal carrier may cause falls leading to serious health consequences or even death. Therefore, please observe all the safety and checking instructions provided in these directions for use, and only allow an authorised dealer to fit the ACID universal carrier. Incorrect operation or an accident may overstress the ACID universal carrier, causing it to fail during subsequent use. This can lead to serious injury or, in the worst case, to death. Therefore, in the event of an accident, please carry out all the checks described in your bike‘s user manual and in the directions for use of your ACID universal carrier. Only once these checks have been correctly carried out may the bike be used again without cause for concern. If in doubt, contact your authorised dealer.
Push and pull at the carrier before every ride to check if the carrier is not
loose!
Also check before every ride that all screws are tightened!
Assembly Instruction
Without Mudguard
-
Loosen the screws of the construction of the adjustable top railings. But do not loosen the screws completely.
-
Install the upper connection railings to the appropriate interface of the frame. Use the attached screws M5x16mm.
-
Install the lower end of the carrier to the dropout screw-mount hole of the frame. Use the attached screws M5x16mm.
-
Adjust the Hight of the carrier so it fits your wheel size perfectly. Unscrew the M5x16mm screws from the M5 nuts and set the carrier in the correct Hight .
-
Orient the carrier horizontal and tighten the screws of the adjustable railing construction. To fit bigger frame sizes perfectly the top adjustable railings may have to be cut.
With Mudguard
-
Connect the upper front end of the carrier to the fender by using the attached carrier adapter (please see overview!). The mudguard needs to be drilled with a 7mm driller. Keep attention that the position of the drilled hole is in the middle of the fender profile!
The mudguard needs to be adjusted together with the carrier on the bike. The drilling position needs to be marked with a pen!
-
Connect the upper rear end of the carrier to the mudguard by using the attached carrier adapter (please see overview!). The mudguard needs to be drilled with a 7mm driller. Keep
attention that the position of the drilled hole is in the middle of the mudguard profile!
-
Loosen the screws of the construction of the adjustable top railings. But do not loosen the screws completely.
-
Install the upper connection railings to the appropriate interface of the frame. Use the attached screws M5x16mm.
Install the lower end of the carrier to the dropout screw-mount hole of the frame. Use the attached screws M5x16mm.
-
Adjust the height of the carrier so it fits your wheel size perfectly. Unscrew the M5x16mm screws from the M5 nuts and set the carrier in the correct height.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>