FORTNINE DIYLIFTMANUAL041323 Tinker Totter Work Stand Instructions
- June 11, 2024
- FORTNINE
Table of Contents
DIYLIFTMANUAL041323 Tinker Totter Work
Stand Instructions![FORTNINE DIYLIFTMANUAL041323 Tinker Totter Work Stand
- REBAR1](https://manuals.plus/wp-content/uploads/2023/05/FORTNINE- DIYLIFTMANUAL041323-Tinker-Totter-Work-Stand-REBAR1.png)
“TINKER TOTTER” WORK STAND
build manual!
DIYLIFTMANUAL041323 Tinker Totter Work Stand
WARNING: SOLD AND USE THIS STAND AT YOUR OWN DAMN RISK (THAT MEANS YOU
TOO, AMERICANS!). FOR THE SAKE OF LIABILITY, JUST PRESUME THE STAND WILL FALL
OVER (AND/OR APART) AND DESTROY YOUR MOTORCYCLE, YOUR SELF, AND EVERYTHING
ELSE YOU MAY LOVE OR VALUE (IF ANY).
LIST OF MATERIALS
(1)1.5″ X 12″ STEEL- PIPE A
(1) GATE HINGE WITH 90 DEGREE STOP B
(3) CAM BUCKI-E TIE DOWNS C
(4) EYE 1301-T SCREWS D
(12) 3″ FL-AT HEAD DECK SCREWS E
(2) 4″ NAILS F
(11) 6″ GRK STRUCTURAL- SCREWS G
(1) 10′ X 10MM REBAR H
(4) 36″ X 1.5″ SL-OTTEP STEEL- ANGL-E IRON I
(2) 4X6″ X 12′ L.-UMBER J
Step1:cut lumber(2)4×6”x12’
A | A² | D | D² | C | E |
---|---|---|---|---|---|
30” | 30” | 15.5” | 15.5” | 7.5” | 45” |
B 84”
F SURPLUS FOR PCKUPS OR INCREASING I-IEI01-1T, LENGTH
STEP 2:DRILL HOLES 1.5″ INNER DIAMETER
TOP DOWN WHEN ASSEMBLED
(4) 2″ FIAT HEAP PECK SCREWS
LINE UP THE ENDS OF F AND B AND PLACE THE KNUCKLE OF THE HINGE INTO
THE NOTCH
THEN SCREW THE TRIMMED NIN&E INTO THE WOOD THROUGH THE FOUR HOLES. FLAT NEAP
SCREWS SINK INTO THE HOLES IN THE HINGE, SCREWS WITH A RAISED NEAP MAY BUMP
INTO THE TAGS.
REBAR, (2) NAIL.S, (4) EYE 1301-T5.
LINE UP THE ENDS OF YOUR REI3AR TRIANGLE ON TO THE TOPS OF A AND A² ,
THEN DRILL-DOWN 3 INCHES WITH A 10MM WT.
YOU MAY NEED TO HAMMER THE ROAR INTO THE HOLES. SECURE WITH NAILS.
SCREW YOUR EYE 801-TS IN NEAR THE TOPS OF A A² D D²
NOTE: BEW CAREFUL. NOT TO SCREW AN EYE BOLT INTO THE PIPE OR ROAR!
STEP 6: HITCHING STRAPS (3) CAM BUCKLE TIE DOWNS
ATTACH THE STRAPS TO THE EYE BOLTS ON A D D²
THREAD IT THROUGH THE EYE DOLT ON A²
STEP 3: RENR PREP 10′ X 10MM REBAR
MEASURE FOR X AND TAKE 3″ OFF FOR CLEARANCE.
TRIM THE EXCESS REEMR WITH AN ANGLE GRINDER OR HACK SAW.
STEP 4: HINGE PREP ONWARD™ PERMALIGN™ HINGE
PINCH YOUR ONWARD™ PERMALISN™ HINGE IN A VICE, AND TRIM THE TABS OFF BELOW THE HOLES. THIS HELPS THE HINGE CLEAR THE &ROUND WHILE LEAVING ENOUGH LEFT FOR SUPPORT WHEN THE BIKE IS MOUNTED.
STEP 5: ASSEMBLY 1.5″ X 12″ STEEL- PIPE
MY DOWN D AND A THEN ADD B AND ALIGN THE HOLES. USE SCRAP FOR
SUPPORT. ADD THE REMAINING E AND C BLOCKS AND ALIGN THE
EDGES. DROP THE PIPE INTO THE
401E. IT SHOULD STICK OUT NO MORE THAN 3 INCHES.
(11) 6″ GRK PECK SCREWS (OR MG I3MTS)
PLACE A² AND D² INTO POSITION AND SCREW IN YOUR FIRST 5 6RK’S. 8E SURE TO PRE-
DRILL THE 4 NEAR THE EDGES, THEY MAY SPLIT OR END UP CRACKING IF THE WOOD
DRIES OUT OVER TIME.
SCREW A SINGLE 6RK THROUGH E AND INTO THE BOTTOM OF C , THEN FLIP THE RI& OVER AND SCREW IN YOUR REMAINING 5 ORKS INTO A AND D.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>