This adapter is used to switch on and check charging stations with a Type 2 socket.

product GET STARTED

Plug in the adapter to the charging station with a Type 2
socket.

product DIAGNOSIS DISPLAY

The diagnosis display will show one of the following:

  • All displays are green. The socket is connected correctly. L1, L2, L3, N and PE are present. The rotating field rotates clockwise.
  • The phase displays (L1, L2, L3) flash red. L1, L2, L3, N and PE are present. A phase is interchanged. The rotating field rotates anti-clockwise.
  • The phase display L1 is off, L2 and L3 flash red. Error: Phase L1 is missing or interrupted.
  • The phase display L2 is off, L1 and L3 flash red. Error: Phase L2 is missing or interrupted.
  • The phase display L3 is off, L1 and L2 flash red. Error: Phase L3 is missing or interrupted.
  • The display N flashes red. The phase displays (L1-L3) may correspond to the diagnoses above (correct or error). Error: The neutral wire N is missing or interrupted. A phase is interchanged if an additional phase diagnosis (phase display L1-L3) shows an error.
  • The PE display is off. The phase displays (L1-L3) and display N may correspond to the diagnoses above. Error: The earth (PE) is missing or interrupted. No device must be connected to the socket. Let a specialist check the socket.

product TECHNICAL SPECIFICATIONS

Below are the technical specifications:

  • Voltage supply: 380 – 415 V/AC, 50 Hz, three-phase current
  • Over-voltage category: CAT III (home installation)
  • Power input: < 20 mA
  • Plug: Type 2
  • Dimensions (length): 540 mm
  • Weight: 340 g

product LIMITED WARRANTY

This product has a limited warranty. Please refer to the manual for more information.

Contact us:

OVERVIEW

METRON-AC01-Phase-and-Charging-Station-Tester-fig-1

INTRODUCTION

This adapter is used to switch on and check charging stations with a Type 2 socket.

GET STARTED

There are two switches: first (A) (see picture above) is used to send a signal “cable inserted” to the charging station and second (B) (see picture above) to send a signal “car charging”. When both switches are on “1”, the charging station will switch on. LED on display shows the presence of phases L1, L2, L3, neutral N, protective ground PE and the sequence of phases. The sequence is important with certain electric cars like Renault ZOE. On a 3-phase charging station all 3 LEDs should be green: see Diagnosis Display.

DIAGNOSIS DISPLAY

  • All displays are green.  The socket is connected correctly. L1, L2, L3, N, and PE are present. The rotating field rotates clockwise.
  • The phase displays (L1, L2, L3) flash red. L1, L2, L3, N, and PE are present. A phase is interchanged. The rotating field rotates anti-clockwise.
  • The phase display L1 is off, and L2 and L3 flash red. Error: Phase L1 is missing or interrupted.
  • The phase display L2 is off, and L1 and L3 flash red. Error: Phase L2 is missing or interrupted.
  • The phase display L3 is off, and L1 and L2 flash red. Error: Phase L3 is missing or interrupted
  • The display N flashes red. The phase displays (L1-L3) may correspond to the diagnoses above (correct or error). Error: T he neutral wire N is missing or interrupted. A phase is interchanged if an additional phase diagnosis (phase display L1-L3) shows an error.
  • The PE display is off. The phase displays (L1-L3) and display N may correspond to the diagnoses above. Error: The earth (PE) is missing or interrupted. No device must be connected to the socket. Let a specialist check the socket.

TECHNICAL SPECIFICATIONS

METRON-AC01-Phase-and-Charging-Station-Tester-fig-11

All our products are produced in a carbon-neutral way by using the “Sustainable energy cycle” method. The production plant where we make charging cables and portable charging stations is the first fully sustainable production facility for EV charging cables. All energy needed for the heating/cooling of the building, and production process, as well as for transportation of goods and employees (except deliveries of heavy materials by trucks) is produced by 2 photovoltaic power plants and stored in 4 storage batteries. Almost all of the raw materials we use (cables, plugs) are produced in the EU to shorten supply routes and support the local economy. Buying our products helps develop a sustainable economy.

LIMITED WARRANTY

METRON warrants its product to the original consumer purchaser that it will repair, or replace, any product that is determined to be defective for the following terms: Two (2) years from the date of purchase on all components. To be eligible for repair or replacement under this warranty, the product in question must be sent back to METRON within the warranty period and the original consumer purchaser must comply with the following conditions: The product thereof must not have been modified or altered in any way by an unauthorized source; The product thereof must have been used in accordance with the user manual. This limited warranty does not cover Damage due to improper use; Accidental or intentional damage; Misuse, abuse, corrosion, or neglect; Product impaired by severe natural conditions, such as excessive hail storms, lightning strikes, tornados, flooding, ice, or other natural occurrences; Damage due to improper packaging on the return shipment. Any and all labor charges for troubleshooting, removal, or replacement of the product are not covered by this warranty and will not be honored by METRON. All shipping costs regarding repair or replacement of the product is to be pre- paid by the original consumer purchaser.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

METRON User Manuals

Related Manuals