ECS FOX CM4000 High-Voltage Stackable Battery Installation Guide

Tools Required

The following tools will be required to install CM(Master module) and CS(Slave module) .

  • Screw Driver

  • Crimping Modular

  • Safety Shoes

  • **Multimeter

**

  • Safety Gloves

  • Safety Goggles

  • Plier

  • **Ribbon

**

  • Electric Drill

  • Track Level Bar

  • Tape

  • **Marker

**

Packing List

For CS :
Packing List

No. Items
A Mounting screw pack
B Installation guide & User manual

For CM :
Packing List

**For CM4000(US only):

**

No. Items No. Items
A Mounting screw pack H Installation guide & User manual
B Fixing bracket I Expansion tube2 & Expansion screw2
C Footstand J Waterproof cover
D Communication cable (BMS-inverter) K RJ45
E Grounding cable L Junction box
F DC positive output cable M PLUG *2
G DC negative output cable

Terminals

For CS :
Terminals

For CM :
Terminals

Installation Steps

Step 1
Install a CS with four footstand (Item C ) and place it on the ground and adjust it  to the level. After installing the footstand, use a track level bar to confirm the level. Insert the waterproof cover (Item J) into the bottom of the battery and lock it in place with the clip.

Step 2
Place the battery 20mm against the wall.
Note: Please make sure the Operating Stthe wall. atus LED is on your left handside when you facing the battery model.

Step 3
Stack the batteries one by one.
Installation Steps

Step 4
Place the two fixing brackets (Item B) close to the wall and install them on both sides of the battery
Installation Steps

Step 5
Mark the wall through the bracket hole

Step 6
Punch after removing the CM. Drill holes with electric drill, make sure the holes are at least 50mm deep, and then fighten the expansion tubes (Item I).

Step 7
After stacking CM again, fix the battery on the wall

Step 8
Fix the mounting screw packs on both sides of the battery, the installation is over

Note: Please make sure each system including 1 CM and 1 CS.CS lessthan 6(1~6) pieces:

For CM 4000 (US only):
Note: Please make sure each system including 1 CM and 1 CS.CS lessthan 4(1~4) pieces:

Please refer to the video for the installation of the junction box and the cable gland.

For CM 4000 (US only)
Installation Steps

Wiring Steps

A: Connect the inverter and make sure the wiring position is correct, as shown in the figure below.
Note: Inverter wiring refer to the inverter user manual.

For outdoor use,please use item K and proceed as follows
Connection steps:

Step 1: Prepare a standard network cable and cable connector, then insert the network cable through the cable connector

Step 2: Crimp the cable with a Rj45 plug which is inside of the cable connector

If the usage is indoor, please use item D
Step 3: Insert the cable connector into BMS port at the bottom of inverter and screw it tightly.

B: Connectthe grounding cable. The figure is shown in below.
Wiring Steps

System Start Up

CM operation:

  1. Normal mode: When there is PV and grid access, turn on DC switch first, then press “POWER” button
  2. Black start: When there is no PV and grid access, turn on DC switch first, then press “POWER” button, then press and hold “B-Start ” button and release it after 10s.

Startup steps:
Turn on DC switch and press the POWER switch, firstly Master LED will light up once, and then the BMS Status LED will light up for 0.5s,Operating Status LED will light up for 1s at the same time,it means that the system works normally.
System Start Up

Please scan the QR Code and follow the steps below to download our latest multilanguage User Manual/Quick Installation Guide:
Scan the QR Code → Select your Language → Choose to download User Manual or Quick Installation Guide → Download

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals